EVODECK
6Pages

{{requestButtons}}

Catalog excerpts

EVODECK - 1

y \j~ PLANKS DIMENSION AND LOGISTIC Code The external dimensions listed are nominal values. The weights of the planks indicated in the tables are indicative and not binding. Length tolerances according UNI EN-ISO 22768: class UNI EN-ISO 22768-vL.

Open the catalog to page 1
EVODECK - 2

System height LAYING ON ALUMINUM JOISTS AND CROSSPIECES 45 x 25.4 mm (W x H) WITH SUPERIMPOSED FRAME LAYING ON ALUMINUM JOISTS 45 x 25.4 mm (W x H) PLANK ALUMINUM JOISTS ALUMINUM CROSSPIECE Size of the joints Clip model Stainless steel clip (code ZCLG-AC017) *IMPORTANT: The dimensions shown are approximate and may vary depending on the accuracy, tolerance and method of installation. Laying instructions Load distributed over The Evodeck floor is suitable for foot traffic, but not vehicle traffic. The minimum distance between the ends of the plank and the wall must be at least 20 mm. The...

Open the catalog to page 2
EVODECK - 3

LAYING ON STABLE GROUND Installation on aluminum joists involves mechanical fixing them to the ground and is suitable for installation on stable and drillable floors such as: concrete sub-bases, existing stone floors and industrial decking. In the presence of concrete screeds laid to protect waterproofing membrane, check the actual available thickness to choose the size of the plug to fix the joists, so as not to damage the underlying membrane. For installation in circumstances and on grounds that differ from the above, please refer to "LAYING METHOD 2 -DOUBLE FRAME” at sheet 116.

Open the catalog to page 3
EVODECK - 4

LAYING AND FIXING OF ALUMINUM JOISTS (standard 45 x 25.4 mm) Arrange the joists on the ground in a position perpendicular to the plank laying direction, with a maximum centre-to-centre distance equal to 400 mm from each other. The positioning of the joists is closely connected to the laying surface of the planks. We recommend laying out the planks on the ground to locate the exact positions of the joists, their centre-to-centre distance may vary depending on the laying surface and the cut of the floor planks. 1. Arrange the joists on the ground with a maximum centre-to-centre distance of...

Open the catalog to page 4
EVODECK - 5

1. The brushed side must be installed facing upwards as it is treated to give it the characteristic aesthetic effect desired. 2. Apply starting clip ZCLG-AC003, by screwing it to the joist and make sure the clips are all aligned. 4. Repeat the above steps until completion of the decking. 5. Where boards have to be fixed using screws, the fixing can be done with a recessed screw and the special dowel provided. • Make a 0 6 mm hole on the board in order to create the site for the screw 4.8x25 mm. Increasing the diameter is necessary to allow the natural movement of the board. • Enlarge the...

Open the catalog to page 5
EVODECK - 6

La Cozza Ristorante | Pizzeria dal 1960 - Posto Vecchio, Lecce - Italy (Evodeck)

Open the catalog to page 6

All WOODN GREENWOOD srl catalogs and technical brochures

  1. TH3050HD

    2 Pages

  2. JF18041

    1 Pages

Archived catalogs