Project Overview
The National Institute of Environmental Health Sciences (NIEHS) required a temporary facility to support research in autoimmunity, infectious diseases, and developmental defects. The facility needed to be fully compliant with codes and functional, incorporating complex mechanical and building systems that could be easily removed.
Client Needs
NIEHS aimed to construct a state-of-the-art facility on an accelerated schedule to bridge the gap between bench science and patient care. The design needed to consider patient flow, employee working patterns, and future flexibility for other laboratory research purposes.
Project Location
Raleigh, North Carolina
Project Timelines
  • Modular Project Timeline: 6 Months
  • Stick-Built Project Timeline: 9 – 12 Months (estimated for comparison)
Milestones and Solutions
The Williams Scotsman solution involved an accelerated construction approach, manufacturing modular building components in parallel with site work. This expedited the construction process. The project was fully design-built using an experienced A&E team, utilizing natural site contours and blending with existing campus architecture.
Project Outcome
The 14,144 sq. ft. facility was built to meet codes including IBG, ADA, IPC, NEC, IMG, and IECC. It features a central boiler, chillers, full medical gases, level-2 BSCs and fume hoods, pressurized spaces, filtration, humidification, VFPs, VAVs, redundant power, inhalation chamber, fluoroscopy, code blue, and commissioning.
See more

Catalog excerpts

National Institute of Environmental Health Sciences-1

PROJECT CASE HISTORY NATIONAL INSTITUTE OF ENVIRONMENTAL HEALTH SCIENCES Raleigh, North Carolina Client Project The National Institute of Environmental Health Sciences required a temporary facility to support research and investigations in autoimmunity, infectious diseases, and developmental defects. The facility solution had to be fully code complaint and functional, while incorporating complex mechanical and building systems that can be easily removed. Client Need NIEHS needed to construct a state-of-the-art facility on an accelerated construction schedule in order to help bridge the gap between bench science and patient care. It is important that the design consider patient flow and employee working patterns while allowing future flexibility for other laboratory research purposes.

 Open the catalog to page 1
National Institute of Environmental Health Sciences-2

Raleigh, North Carolina The Williams Scotsman Solution The accelerated construction approach by Williams Scotsman and its manufacturing partner allowed for the modular building components to be manufactured in parallel NATIONAL INSTITUTE OF ENVIRONMENTAL HEALTH SCIENCES MODULAR PROJECT TIMELINE: systems through work on modular BLS-3 applications. The building’s design utilized STICK-BUILT PROJECT TIMELINE: 9 – 12 Months * some of the natural contours of the site and blended with the architectural style of * Estimated for comparative purposes with site work, expediting the construction process....

 Open the catalog to page 2

All Williams Scotsman catalogs and technical brochures

Archived catalogs

  1. FBI Academy

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.