Project Overview
The project involved providing temporary modular classrooms for Leominster High School in Massachusetts, which required additional space due to a major renovation. The school needed these classrooms ready by mid-August, shortly after the academic year ended in mid-June.

Specifications and Scope
- Location: Leominster, MA, a city in Worcester County, 40 miles west of Boston.
- Population: Approximately 40,000.
- School History: Originally opened in 1963, with renovations in 1977 and 1990.
- Current Renovation: A two-year, $40 million project.
- Temporary Solution: 27,000 ft² of modular classrooms provided by WillScot.
- Timeframe: 90 days to occupancy.

Procedures and Implementation
The project included site preparation, utility connections (electrical, plumbing, fire alarm, communications, fire suppression), and the installation of connecting corridors and handicap access. This ensured that the temporary classrooms were fully functional and accessible.

Outcome and Impact
The modular classrooms served as "swing space" to minimize disruption during the renovation. The Leominster student population was able to start the new school year on time, maintaining continuity and stability in their education.

Contact Information
For more information, contact WillScot at 800.782.1500 or visit WILLSCOT.COM.
See more

Catalog excerpts

LEOMINSTER HIGH SCHOOL-1

LEOMINSTERHIGH SCHOOL Solution Type THE STORY Leominster is a city in Worcester County, Massachusetts just 40 miles west of Boston with a population of about 40,000 and has worked hard to maintain its small town atmosphere. The Leominster High School, originally opened in the fall of 1963, had already undergone two major renovations in 1977 and 1990. It now had approved plans for a two year, forty million dollar renovation that necessitated the use of temporary classroom space for its students until the transformation was completed. Twenty four of WillScot's modular classrooms served as education "swing space" (temporary space used by occupants and away from ongoing reconstruction or renovations) during this time and helped ease the impact of the construction process on the student community throughout the project. We were selected because of our reputation for quality and history of successfully managing aggressive project schedules. Students did not complete their academic year until mid-June and the high school needed the modular classrooms ready by mid-August. We prepared the site for installation, connected all utilities (electrical, plumbing, fire alarm, communications, fire suppression) and included connecting corridors and handicap access. The Leominster student population began its new school year on time. Once again our swing space solutions provided continuity and stability.

 Open the catalog to page 1

All Williams Scotsman catalogs and technical brochures

Archived catalogs

  1. FBI Academy

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.