
Power and Load Optimised Modes Wind turbine operational strategies to fully leverage site-specific wind conditions Benefits of Vestas’ Power and Load Optimised Modes • Maximum energy production based on site-specific conditions • Maintain structure and component design lifetime Powered by Vestas’ superior wind insight Vestas’ Power and Load Optimised Modes are advanced operational strategies, which enable product customisation for site-specific conditions. Based on Vestas’ deep understanding of wind and the turbine load implications, the turbines can be configured to the optimal mode of operation on each site. The modes enable an optimisation of the annual energy production of the individual turbines in the wind park, while adhering to the site specific loads of the turbines. Ultimately, ensuring the ideal wind solution to ev
Open the catalog to page 1Availability of Vestas’ Power Optimised Modes: V90-2.0 MW™: Up to 2.2 MW V100-2.0 MW®: Up to 2.2 MW V110-2.0 MW®: Up to 2.2 MW V105-3.45 MW™: Up to 3.6 MW V112-3.0 MW: Up to 3.2 MW** V112-3.45 MW®: Up to 3.6 MW V116-2.0 MW: Up to 2.1 MW V117-3.45 MW®: Up to 3.6 MW V117-4.2 MW™: Up to 4.2 MW V120-2.0 MW™: Up to 2.2 MW V126-3.45 MW®: LTq up to 3.6 MW V126-3.45 MW®: HTq up to 3.8 MW V136-3.45 MW®: Up to 3.6 MW V136-4.2 MW™: Up to 4.2 MW V150-4.2 MW™: Up to 4.2 MW Availability of Vestas’ Load Optimised Modes: V90-3.0 MW®: Down to 2.039 MW V90-1.8/2.0 MW®: Down to 1.125 MW V100-1.8/2.0 MW®: Down to...
Open the catalog to page 22 Pages
12 Pages
16 Pages
28 Pages
16 Pages
16 Pages
16 Pages
12 Pages
2 Pages
2 Pages
16 Pages
16 Pages
12 Pages
4 Pages
4 Pages
12 Pages
8 Pages
20 Pages
4 Pages
4 Pages
12 Pages
12 Pages
16 Pages
12 Pages
8 Pages
8 Pages
8 Pages
2 Pages
2 Pages
2 Pages
2 Pages
4 Pages
20 Pages
8 Pages
8 Pages
16 Pages
14 Pages
74 Pages
8 Pages
8 Pages
8 Pages
20 Pages
20 Pages
12 Pages
12 Pages
8 Pages
16 Pages
2 Pages
2 Pages