1. Catalogs
  2. VERNER a.s.
  3. AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM

AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM

AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM
1 / 14 PagesView full catalog

AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM

Product catalog summary
General Description
The VERNER GOLEM boilers are designed for water heating, service water heating, or steam production with capacities from 90 kW to 2,500 kW, extendable up to 10,000 kW in cascade. They are optimized for biomass combustion with moisture content up to 60%, including sawdust, wood chips, and straw. The boilers feature automatic systems for fuel feeding, ignition, and deashing, reducing the need for operator intervention. They can integrate with advanced control systems for remote monitoring and alerts.
Functionality
Fuel is transported to the silo and then to the burner via screw conveyors, with a maximum fuel size of 30 x 30 x 60 mm. The combustion process is regulated by a computer using data from a lambda sensor. Waste gases are cleaned using a multicyclone separator to meet emission standards. The system includes a cooling mechanism to prevent overheating during power cuts.
Usage
These boilers are suitable for central heating in communities and decentralized heating in schools, hospitals, and production plants. They can be part of an energetic self-contained community, stabilizing fuel prices and supply. The boilers can be installed in cascades up to 10,000 kW and are compatible with existing gas or fuel oil boiler rooms.
Technical Parameters
The boilers operate with an efficiency of 86-90% and can handle continuous and step function operations. They require a supply electric input of 3 x 400 V / 50 Hz and have a flue gas output temperature of 180-260°C. The noise level and other parameters can be customized based on requirements.
Examples of Implementations
1. Central Heating Plant for Biomass Žlutice (2001) - 7,900 kW capacity.
2. Boiler-room DIBAQ a.s. Helvíkovice (2004) - 1,800 kW capacity.
3. Primary School Stárkov (2003) - 225 kW capacity.
4. Lachman Interier Design v.o.s. Prostějov (1999) - 350 kW capacity.
Technical Schemes
The document includes detailed schemes for boiler-room setups for various capacities, illustrating practical examples for installations ranging from 90 kW to 1,800 kW.
Specifications
Each model of the VERNER GOLEM boiler-room is designed with specific components that include a burner, extension chamber, exchanger, control unit, fuel reservoir/silo, transport tracks, flue ways and filtration, hydraulic unit, and ashbin. These components are essential for the operation and efficiency of the boiler system.
Procedures
The document details the drives associated with the system, including those for the hydrogenerator, feeding screw, ventilator of combustion air, ash crusher, ash conveyor, and flue gases conveyor. These drives are crucial for the mechanical operations within the boiler-room.
Standards
The company, VERNER a.s., adheres to ISO 9001:2008 standards, ensuring quality management and operational excellence in their boiler systems.
Contact Information
VERNER a.s. is located at Sokolská 321, 549 41 Červený Kostelec, Czech Republic. They can be contacted via phone at +420 491 465 024 or email at [email protected]. More information is available on their website www.verner.cz.
See more

Catalog excerpts

AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-1

AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM VERNER a. s., Sokolská 321, 549 41 Červený Kostelec, Czech Republic, www.verner.cz

 Open the catalog to page 1
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-2

VERNER GOLEM VERNER a. s., Sokolská 321, 549 41 Červený Kostelec, Czech Republic, www.verner.cz

 Open the catalog to page 2
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-3

VERNER GOLEM General description of boilers VERNER GOLEM The VERNER GOLEM boilers of the rated capacity from 90 kW to 2 500 kW (in cascade up to 10 000 kW) are designed for water heating and service water heating or for steam production. They are intended for biomass combustion with moisture up to 60%. Suitability of particular fuels are: sawdust with moisture up to 45%, wood chips or green wood chips with moisture up to 60%, straw with moisture up to 22% – these values are with usage of stabilizing fuels like pellets, dry wood chips or brown coal. Without using stabilizing fuel, the maximum...

 Open the catalog to page 3
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-4

Waste gases cleaning: Waste gases cleaning proceeds in multicyclone separator which ensures a fulfilment of emission limits at low level of power consumption for cleaning. Emissions by the standards: CO 650 mg/Nm3 * Solid light ash 250 mg/Nm3 * (by changing the construction 150 mg/Nm3 is possible) * O2 = 11% Transport of ash: Ash is transported via grinder into the ash bin (or container). Service: Service consists of exchanger-cleaning, servicing of parts for separating and crushing, lubricating of bearings and transmission cases, controlling the water in warmwater circuit or supplementary water...

 Open the catalog to page 4
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-5

VERNER GOLEM Examples of concrete realizations (more information and complete reference list at: www.verner.cz): Heating up of municipality: CENTRAL HEATING PLANT FOR BIOMASS ŽLUTICE – realization in 2001 Parameters of boiler-room + technology: Boiler: VERNER GOLEM 1x 2 500 kW Boiler: VERNER GOLEM 3x 1 800 kW Rated capacity: 7 900 kW Length of caliducts: 11,6 km Temperature gradient: 105/65 °C Pressure area in caliducts: 0,4 Mpa, 0,9 MPa Supply system: warm-water Fuel: wood chips, sawdust, pellets, straw Rumex OK2 and other agricultural products Boiler with producing steam: BOILER-ROOM DIBAQ...

 Open the catalog to page 5
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-6

VERNER GOLEM Efficiency of boiler Adjustability of continuos operation Adjustability of step function operation Maximum operation overpressure of water in the burner (for usage of boiler for higher pressure exchanger is placed between Temperature and pressure of medium at output Supply electric input Temperature of flue gases at output of the boiler Minimum temperature of reverse water to the burner Maximum noise level Fuel consumption 86 - 90 % 40 - 100 % 0 - 40 % 5 bar (0,5 Mpa) the boiler and the burner) setting according to requirements 3 x 400 V / 50 Hz 180 - 260 °C 60 °C setting according...

 Open the catalog to page 6
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-7

Orientation consumption of fuel for produced energy This chart is used for calculation of needed fuel quantity for required amount of energy. The data are used from practice and include efficiency of the boiler and combustion - produced energy is measured in the boiler output. VERNER a. s., Sokolska 321, 549 41 Cerveny Kostelec, Czech Republic, www.verner.cz

 Open the catalog to page 7
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-8

VERNER GOLEM Scheme of boiler-room VERNER GOLEM 90 (practical example) VERNER a. s., Sokolská 321, 549 41 Červený Kostelec, Czech Republic, www.verner.cz

 Open the catalog to page 8
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-9

VERNER GOLEM Scheme of boiler-room VERNER GOLEM 225 (practical example) VERNER a. s., Sokolská 321, 549 41 Červený Kostelec, Czech Republic, www.verner.cz

 Open the catalog to page 9
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-10

VERNER GOLEM Scheme of boiler-room VERNER GOLEM 350 (practical example) VERNER a. s., Sokolská 321, 549 41 Červený Kostelec, Czech Republic, www.verner.cz

 Open the catalog to page 10
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-11

VERNER GOLEM Scheme of boiler-room VERNER GOLEM 600 (practical example) VERNER a. s., Sokolská 321, 549 41 Červený Kostelec, Czech Republic, www.verner.cz

 Open the catalog to page 11
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-12

VERNER GOLEM Scheme of boiler-room VERNER GOLEM 900 (practical example) VERNER a. s., Sokolská 321, 549 41 Červený Kostelec, Czech Republic, www.verner.cz

 Open the catalog to page 12
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-13

VERNER GOLEM Scheme of boiler-room VERNER GOLEM 1800 (practical example) VERNER a. s., Sokolská 321, 549 41 Červený Kostelec, Czech Republic, www.verner.cz

 Open the catalog to page 13
AUTOMATIC BOILERS BURNING BIOMASS VERNER GOLEM-14

VERNER GOLEM I = burner II = extension chamber III = exchanger IV = control unit V = fuel reservoir / silo VI = transport tracks VII = flue ways and filtration VIII = hydraulic unit IX = ashbin 1 = drive for hydrogenerator 2 = drive for feeding screw 3 = drive for ventilator of combustion air 4 = drive for ash crusher 5 = drive for ash conveyor 6 = drive for flue gases conveyor Business representation: VERNER a. s., Sokolska 321, 549 41 Cerveny Kostelec, Czech Republic, www.verner.cz

 Open the catalog to page 14
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.