video corpo

Glass wall
8Pages

{{requestButtons}}

Catalog excerpts

Glass wall - 1

Installation manual Glass wall V760 Sa Caleta

Open the catalog to page 1
Glass wall - 2

Important before mounting 1 The glass sliding wall consists of: 2 2. Monteren van de bovenkap en onderrail (optioneel) 3 Important before mounting Gerenal warning Mounting the Verano® product yourself is at your own risk. Only use this instruction as a tool and for the mounting of this specific Verano® product. If you cannot install the product yourself, you can always opt for professional mounting. The mounting team of Verano® is pleased to help you. Be careful for damages Don’t use a knife or any other sharp object when opening the packing. This may cause damage to the...

Open the catalog to page 2
Glass wall - 3

The glass sliding wall consists of: 2. Bottom rail 4 or 6 tracks. 3. Glass panels. These are provided with a glass rail (3a) at the bottom side with two wheels. One of these wheels is adjustable in height (3b) by means of an Allen key (3c). 4. Covering caps 4a and 4b. (Option, is not standard included) r \ Required tools • Drilling machine • Masonrydrill • Crosshead screwdriver • Allen key set • Tape measure • Level • Pencil V__

Open the catalog to page 3
Glass wall - 4

1. Drill holes for the purpose of water drainage 4a Before you will mount the bottom rail you should drill a Ø 4 mm hole for the purpose of water drainage. Use the drill groove at the front side as an indication for the drilling. Drill through all of the tracks. Repeat this on a number of points in the bottom rail. 4b The profile runs oblique, this makes sure the rain water will always be discharged outside through the holes. fig. 1.1 Drilling the water drainage in the lower rail 2. Mount top and bottom rail (optional) 2 fig .2.2 Cover lower rail 4b Provide the top and bottom rail with...

Open the catalog to page 4
Glass wall - 5

4a Installation manual V760 Sa Caleta 10 3.1 Mounting top and bottom rail 700 100 Provide the top and bottom rail with drilling holes. Drilling lines indicate where. Drilling holes Ø 4 mm and 100mm from the side, distance to the next two holes 70 – 90 cm. Attention De distance from the floor to the gutter left and right may differ maximum 5mm. This difference is absorbed by the slack in the top rail. The bottom floor must also be level and flat. It is advised to use frostfree foundation. 3.2 Drill the gutter fig. 3.2 Mounting top and bottom rail The prevent the gutter from leaking, seal the...

Open the catalog to page 5
Glass wall - 6

4. Placement of glass panels First, place the glass panel into the top rail (1) and then place the glass panel into the right track of the bottom rail. By means of a Allen key, the glass panel can be adjusted perfectly (4). 2 In this mounting instruction, the panels have been divided over left and right, but they can also be3 shoved to one side. Open Subject to misprints, errors and technical modifications. Chose the right track.

Open the catalog to page 6
Glass wall - 8

Exterior & interior sun protection | Outdoor living | Roller shutters | Garage doors cd n i—t- —»■ S -O ro — cu =r co rD rD co ro

Open the catalog to page 8

All Verano catalogs and technical brochures

  1. Windscreen

    22 Pages

  2. V210-Rhodos

    3 Pages