Catalog excerpts
TRIMBLE ACCUBID ENTERPRISE CHANGE MANAGE THE COMPLETE CHANGE LIFECYCLE All MEP contractors know that it's the indirect costs associated with changes to design scope that can really set a project profit margin back. Those who are able to price and manage contract variations will have the best opportunity to drive success even on a challenging, complex project. The Trimble® Accubid Enterprise Change Management module lets users manage contract variations with clarity. EFFECTIVELY MANAGE VARIATIONS Want to use one estimate with different variations? Trimble Accubid Enterprise Change Management module lets you draw from your existing database of contract estimates to begin new contract documents. The Change Management module includes all the flexibility and ease-of-use inherent in the Trimble Accubid Enterprise solution for faster, more accurate change order management. WITH A ROBUST REPORTING TOOL USERS CAN EASILY PRODUCE CUSTOMIZABLE, PROFESSIONAL LOOKING CHANGE ORDER REPORTS FOR QUICK SUBMISSION AND APPROVAL STAY FLEXIBLE Don't limit yourself to a single pricing method; the Change Management module has the built-in flexibility to accommodate both list and net pricing, as well as handle overhead and markups. 4 Status: Cost Plus Change Location of Light Fixture : Revise equipment ' STATUS OF EACH AND EVERY Item Description CREATE FASTER, MORE CONSISTENT PRICING OF CHANGE With a robust reporting tool users can easily produce customizable, professional looking change order reports for quick submission and approval. Proposed change order reporting also allows the viewing of both internal and external costs. Reports can be previewed before printing and emailed directly from the Change Management program.
Open the catalog to page 1TRIMBLE ACCUBID ENTERPRISE CHANGE MANAGEMENT Once a contract has been created, easily associate a contract amount Contract amounts are easily updated once a change order is accepted Create faster, more accurate pricing of change orders Use the original estimate data to easily assemble PCO’s Track the entire lifecycle of the change order, allowing a bird’s eye view of the status of each and every change • Easily distribute RFP’s, PCO’s and CO’s via email within the program – no need to go outside the program to send an email System Requirements PROCESSOR: 1 x 2 GHz or faster 32-bit or 64-bit...
Open the catalog to page 2All TRIMBLE MEP FRANCE catalogs and technical brochures
-
Trimble TX6
2 Pages
-
Trimble RealWorks
4 Pages
-
Trimble TX8
2 Pages
-
Trimble EdgeWise
2 Pages
-
DPI-8 Handheld 3D Scanner
2 Pages
-
Trimble PipeDesigner 3D
2 Pages
-
Trimble DuctDesigner 3D
2 Pages
-
Trimble AllTrak Cloud
2 Pages
-
Trimble AllTrak
4 Pages
-
Trimble ConstructJob
2 Pages
-
Trimble Field Link for MEP
2 Pages
-
Trimble R8s GNSS Reciever
2 Pages
-
Trimble Accubid LiveCount
2 Pages
-
TRIMBLE AUTOBID SHEETMETAL
2 Pages
-
TRIMBLE AUTOBID MECHANICAL
2 Pages
-
Trimble Accubid ChangeOrder
2 Pages