Overview: The Trimble Accubid ChangeOrder software is designed to help contractors accurately price change orders by considering both direct and indirect costs. This includes labor, materials, equipment, and additional factors such as cleanup, material handling, and project management.
Consistent Pricing: The software allows users to create change notices that reflect contract terms, incorporating all costs. It supports material and labor cost adjustments and provides detailed or summary information for approval processes.
Customizable Reports: Users can generate professional reports with customizable styles, including company logos and specific content for client and office reports. Reports can be previewed and emailed directly from the software.
Change Order Status: The software provides a comprehensive view of all project changes, allowing project managers to track the status of change orders and update contract amounts automatically.
Material Database: The software includes a comprehensive database with over 40,000 material items and 9,500 pre-built assemblies, suitable for various electrical applications. It includes labor units and cost codes.
Dynamic Takeoffs: Users can create custom assemblies and automatically calculate component quantities based on specified lengths or counts.
Intelligent Breakdowns: Takeoffs can be organized by phase, system, area, drawing, and bid item, with labor adjustments for different installation conditions.
System Requirements: The software requires a 2 GB dual-core chip, 4 GB RAM, 8 GB disk space, and specific screen resolutions. It is compatible with Windows 7, 8, 8.1, and 10, and requires a web browser.
Contact Information: Trimble Navigation Limited provides contact details for their offices in the USA and Canada.
See more

Catalog excerpts

Trimble Accubid ChangeOrder-1

+++++++++++ ++++++++++++ Trimble Accubid ChangeOrder Start Tracking Many contractors lose money on change orders because they price only the obvious costs and don't consider all the consequential costs. Trimble Accubid ChangeOrder helps you assess the "big picture", pricing not just labor, material, and equipment, but also cleanup, material handling, overtime, relocation delays, and additional supervision and project management. Accubid ChangeOrder guides you beyond the direct costs and the defined scope of work to assess the indirect costs and consider the full impact of the contemplated CONSISTENT PRICING Create and lock in change notices that reflect the way the contract reads. Include all the miscellaneous, direct, and indirect costs. ncorporate base contract material and unit pricing and save for use throughout the project. Discount or markup material or labor costs by whatever percentage or amount you select. Choose detail or summary information giving the owner and GC the information they need for approval. Accubid ChangeOrder provides project consistency and maximizes profit CUSTOMIZABLE REPORTS Reusable report styles allow you to produce consistent and professional-looking reports. With the option to customize reports for each project and save your customizations for future use. You can determine the appearance and contents of both client and office reports, specify the report title, and even include your company logo. Additionally, you can preview your reports before printing, and email them right from within your Accubid ChangeOrder CHANGE ORDER STATUS ATA The status of all the changes on a project are seen on one screen giving the project manager complete visibility and control. Base bid from Trimble Accubid Estimating can be easily imported into Accubid ChangeOrder providing original contract amounts. As change orders move from pending to approved or rejected the contracts-to-date amounts are automatically updated providing a clear picture on amounts that should be given to accounting for accurate monthly billings. Confidence in consistent pricing Easily view your change order status at a glance for complete visibility and control Comprehensive material database Flexible takeoff to work the way you and your team work Break down takeoffs by logical and physical aspects, such as phase, system, area, drawing, and bid item TRANSFORMING THE WAYTHE WORLD WORKS

 Open the catalog to page 1
Trimble Accubid ChangeOrder-2

Accubid ChangeOrder SOFTWARE CHANGE PROPOSAL Project Humt>er: :nethe rijWtoiorredthE-aiBtefbr aroisanJ omis-Bie. :e E spod fcsi acceptance within 10 days hom thedate of lecept B1-1 YELLOW WIRE CONN CEILING CUF vV :7n-n- STC NAIL -STL ICKC FIIOIJRE DEEP CELL PARABOLIC LOUVRE Total Labor Final Amount PROVEN MATERIAL DATABASE Each change order program comes with a comprehensive material database priced and ready to use. The database includes over 40,000 material items and up to 9,500 pre-built assemblies laid out just as you would take them off. Items are available for many different electrical...