Catalog excerpts
STAUF WEP 180 Solvent-free 2-component water epoxy resin based primer Technical Datasheet Product number Special features Reinforcement of substrates Deeply penetrating epoxy resin Vapour barrier on substrates containing residual moisture up to 4.0 CM%. Quick drying Easy to apply WEP 180 Tutorial-Clip Application range primer under STAUF PU-, SPU- and SMP-adhesives primer under STAUF levelling compounds sprinkled with sand after first coat before levelling with STAUF levelling compound (with STAUF VDP 160 as a primer) vapour barrier on cement screeds containing residual moisture up to 4.0 CM%. Suitable subfloors mastic asphalt screed concrete C 25 / 30 according to DIN 1045 (non-skid surface) calcium sulphate (flow) floors (no moisture barrier) wooden planks, wood fibre boards chipboards (P4 to P7), OSB boards (OSB/2 to OSB/4) stone, ceramic, terrazzo, tiles unlaminated gypsum fibre boards cement floors cement floors with residual moisture Product properties good adhesion to various materials very economical very low emission can be diluted with water reduction of the vapour diffusion rate on sufaces with residual moisture Hardener: yellowi
Open the catalog to page 1^ First coat: approx. 150 - 200 g if applied with a roller (diluted 1:1 with water) ^ Second or further coats as a vapour barrier: approx. 200 g undiluted if applied with a roller ^ thin coat application, undiluted, as a bonding agent on nonabsorbent surfaces: approx. 100 g/m2 if applied with a roller ^ the quantity required increases significantly if the substrate is highly porous Drying time ^ 1. Coat diluted with water (1:1): approx. 2 hours ^ 2. Coat undiluted or further coats applied as a vapour barrier: at Additional instructions 1 ^ If levelling layers thicker as 10 mm are to be...
Open the catalog to page 2SUBFLOOR PREPARATION It must be ensured that the subfloor is ready for installation by performing proper subfloor preparation, floors must be clean, have sufficient surface strength, must be level, permanently dry and free of cracks. A mechanical pretreatment of the subfloor (sweeping, vacuuming, mechanical brushing, sanding, milling, shot blasting) must be performed depending on type and condition of subfloor. Cracks and joints, except expansion joints and other construction joints, shall be solidly closed with STAUF repair resin and floor brackets. Cavities and indentations can be filled...
Open the catalog to page 3All Stauf Klebstoffwerk GmbH catalogs and technical brochures
-
STAUF S PRESS
3 Pages
-
STAUF PUK 446
3 Pages
-
STAUF SPU 555
3 Pages
-
STAUF SPU 570
3 Pages
-
STAUF PUK 410
3 Pages
-
STAUF SPU 510 2024
4 Pages
-
STAUF COMFORT PAD
2 Pages
-
STAUF POLYESTER FELT
2 Pages
-
STAUF SGH 50
3 Pages
-
STAUF TURBO FIX
3 Pages
-
STAUF REINFORCING FIBRES
1 Pages
-
STAUF PU
3 Pages
-
STAUF GS STAND
3 Pages
-
STAUF XP 20
4 Pages
-
STAUF XP 10
3 Pages
-
STAUF VEP 195
4 Pages
-
STAUF VPU 155 S
3 Pages
-
STAUF D 54
3 Pages
-
STAUF SMP 950
2 Pages
-
STAUF M2A 910
2 Pages
-
STAUF SPU 510
2 Pages
Archived catalogs
-
STAUF M2A 910 2024
3 Pages