STAUF VEP 195
4Pages

{{requestButtons}}

Catalog excerpts

STAUF VEP 195 - 1

STAUF VEP 195 Solvent and water free 2-component epoxy primer Technical Datasheet Product number Special features strengthening of substrates good penetration capability vapour barrier on surfaces with residual moisture Application range damp proof membrane on cement screed subfloors with residual moisture of max. 5 CM-% (6 pbw-%) after reaching the necessary strength primer under STAUF PU-, SPU- and SMP-adhesives primer under STAUF levelling compounds sprinkled with sand after first coat before levelling with STAUF levelling compound (with STAUF VDP 160 as a primer) epoxy resin binders for preparing anhydrous reactive resin screeds and mortars Suitable subfloors mastic asphalt screed concrete C 25 / 30 according to DIN 1045 (non-skid surface) calcium sulphate (flow) floors (no moisture barrier) wooden planks, wood fibre boards chipboards (P4 to P7), OSB boards (OSB/2 to OSB/4) stone, ceramic, terrazzo, tiles unlaminated gypsum fibre boards bonded screed ZE 30 according to DIN 18560, part 3 (non-skid surface) cement floors cement floors, concrete floors with residual moisture Product properties good adhesion to various materials easy to apply reduction of the vapour diffusion rate on sufaces with residual moisture

Open the catalog to page 1
STAUF VEP 195 - 2

^ 400g when applied with roller Drying time ^ approx. 16 hours at 20 °C and 50 % rel. humidity ^ By applying a second coat of STAUF VEP-190 as a vapor barrier the consumption reduces to approx. 250 g/m2. ^ Before applying reactive adhesives (PUK, SPU, SMP and EP ranges): In addition to observing the specified time needed between priming and bonding, and the climatic conditions indicated (temperature and humidity), it is essential to sand the the surfaces. ^ When gluing directly with reactive adhesives (PUK-,SPU-, SMP-and EP-Line): Is the surface of the primer still slightly sticky after the...

Open the catalog to page 2
STAUF VEP 195 - 3

SUBFLOOR PREPARATION It must be ensured that the subfloor is ready for installation by performing proper subfloor preparation, floors must be clean, have sufficient surface strength, must be level, permanently dry and free of cracks. A mechanical pretreatment of the subfloor (sweeping, vacuuming, mechanical brushing, sanding, milling, shot blasting) must be performed depending on type and condition of subfloor. Cracks and joints, except expansion joints and other construction joints, shall be solidly closed with STAUF repair resin and floor brackets. Cavities and indentations can be filled...

Open the catalog to page 3
STAUF VEP 195 - 4

STAUF KLEBSTOFFWERK GMBH . Oberhausener Str. 1 . 57234 Wilnsdorf . Germany Fon: +49 (0) 2739 301-0 . Fax: +49 (0) 2739 301-200 . Email: info@stauf.de

Open the catalog to page 4

All Stauf Klebstoffwerk GmbH catalogs and technical brochures

  1. STAUF SGH 50

    3 Pages

  2. STAUF PU

    3 Pages

  3. STAUF XP 20

    4 Pages

  4. STAUF XP 10

    3 Pages

  5. STAUF D 54

    3 Pages

Archived catalogs