STAUF M2A 910 2024
3Pages

{{requestButtons}}

Catalog excerpts

STAUF M2A 910 2024 - 1

STAUF M2A 910 Filler free dispersion-based adhesive for wood flooring according to ISO 17178 Technical Datasheet Product number Special features filler free very economical very high initial tack long open time combines high strength with a useful elasticity very well spreadable ProForce Tutorial-Clip vertical finger parquet lamellas, according to DIN EN 14761, from 16 mm thickness solid lamparquet products according to DIN EN 13227 up to 55 x 250 mm, min. 10 mm thickness multiple layer wood flooring, indvidual lamellas according to DIN EN 13489 multiple layer wood flooring according to DIN EN 13489 mosaic parquet according to DIN EN 13488 wood strip flooring raw according to DIN EN 13226, max. 75 x 600 mm, min. 14 mm thickness multiple layer wood flooring according to DIN EN 13489, exceeding 14 mm thickness, triple layer, max. width 180 mm Additional instructions floor coverings solid lamparquet products: individual lamellas, wood types and installation units prone to swelling, installation preferably with STAUF PU adhesives such as STAUF PUK 455, PUK 446 mosaic parquet: no parallel patterns for wood types prone to swelling For installation of multiple layer wood flooring on HDF or MDF base exclusively use STAUF SPU-, PUK- and SMP-adhesives! Suitable subfloors calcium sulphate (flow) floors wooden planks, wood fibre boards STAUF levelling compounds for wood flooring chipboards (P4 to P7), OSB boards (OSB/2 to OSB/4) cement floors Additional instructions subfloors/substrate

Open the catalog to page 1
STAUF M2A 910 2024 - 2

Suitable levelling compounds ^ STAUF XP 20 ^ STAUF FZ ^ STAUF RM ^ STAUF SSP RAPID Suitable underlays ^ on request only Product properties ^ aging-resistant ^ suitable on subfloor heating systems ^ good ridge formation ^ solvent-free Required quantities per m2 ^ 650g with STAUF notched trowel no. 3 ^ 850g with STAUF notched trowel no. 4 ^ 700g with STAUF notched trowel no. 5 Open time ^ approx. 25 minutes at 20 °C Accessibility ^ after 4-24 hours ^ Grinding/polishing: after 5-7 days Room climate at work site ^ Minimum 18 °C, maximum 75% rel. humidity, preferably max. Storage requirements ^...

Open the catalog to page 2
STAUF M2A 910 2024 - 3

SUBFLOOR PREPARATION It must be ensured that the subfloor is ready for installation by performing proper subfloor preparation, floors must be clean, have sufficient surface strength, must be level, permanently dry and free of cracks. A mechanical pretreatment of the subfloor (sweeping, vacuuming, mechanical brushing, sanding, milling, shot blasting) must be performed depending on type and condition of subfloor. Cracks and joints, except expansion joints and other construction joints, shall be solidly closed with STAUF repair resin and floor brackets. Cavities and indentations can be filled...

Open the catalog to page 3

All Stauf Klebstoffwerk GmbH catalogs and technical brochures

  1. STAUF SGH 50

    3 Pages

  2. STAUF PU

    3 Pages

  3. STAUF XP 20

    4 Pages

  4. STAUF XP 10

    3 Pages

  5. STAUF D 54

    3 Pages