Introduction: Completing tasks safely is a priority for Spaceoasis. Risks are identified and mitigated to ensure high-quality service delivery.
Method Statement Overview: The document outlines the supply and installation of screen and furniture systems by Spaceoasis Ltd. at specified customer locations. The work involves assembling timber-based laminated panels with steel posts, using adhesives and seals as needed. Regular communication with the client's health and safety representative is emphasized.
Operatives: The team includes one site supervisor (skilled joiner) and one other operative.
Site Preparations: Accurate layout drawings are required for installation. The site must be clear of unrelated works and products, and floor finishes should be completed before assembly begins.
Protection of Works: No special protection is provided post-completion unless agreed in writing. Completed units may be protected with Cushion Wrap 1207.
Delivery and Loading: Goods are delivered in crates and unpacked on vehicles. A safe, dry holding area is needed for temporary storage. Ergonomic assessments guide the manual handling of components.
Assembly of Units: Standard procedures are followed for setting out and assembly. Modifications to assembly posts are done manually if needed. Screen panels and furniture components are assembled using mechanical fixings.
Tools and Equipment: Power tools (110v) and cordless drills are used. Personal Protection Equipment (PPE) includes safety helmets, footwear, high visibility vests, gloves, dust masks, and eye protection.
Contact Information: Spaceoasis Ltd, Grosvenor House, Central Park, Telford, Shropshire UK, TF2 9TW. Tel: +44 (0) 1952 210197, Email: [email protected]
See more

Catalog excerpts

method statement-2

01 Completing task in a safe manner is very important to Spaceoasis. We identify the risks and take steps to reduce them to deliver possibly the best service to our customers.

 Open the catalog to page 2
method statement-4

Method Statement Customer: your company name site: your site address location: floor, room number supplier: Spaceoasis Ltd. product category: screens / furniture applications: breakout ares, study areas, meeting areas, reception, etc. start & completion date: DD-MM-YY to DD-MM-YY order number: your order number Method Statement: 1.0 General: The scope of works to be undertaken by Spaceoasis Limited is the supply and installation of its proprietary screen and furniture systems for Breakout Area, Study areas, Meeting Areas, Reception etc at your premises. The system consists of timber based...

 Open the catalog to page 4
method statement-5

one site supervisor (skilled joiner) one other operative 1.2 Site Preparations: Up to date printed layout drawings will be needed for accurate setting out and installation of product. You will need to confirm the exact locations for all units prior to installation as once units are fitted, subsequent relocation has not been allowed for in our quote. 1.3 Other Trades: The area is expected to be clear of other works and un-associated product as no allowances have been made for the removal or relocation of such items. All floor finishes should be complete prior to us commencing assembly. Spaceoasis...

 Open the catalog to page 5
method statement-6

Method Statement 2.0 Delivery and Loading: Goods will arrive on delivery vehicles in crates; individual items will be unpacked whilst still on the vehicles. All packaging will be taken away or placed in skips on the day of delivery. 2.1 Holding area: Before goods are off loaded we will require a safe dry area inside the building for temporary storage prior to transporting to the appropriate floor / area. 2.2 Movement of goods: Components are within accepted guidelines for manual lifting by either one or two people and moved from vehicle to installation location with mechanical assistance. ...

 Open the catalog to page 6
method statement-7

the posts using standard mechanical fixings. Each panel run is completed with a solid plywood capping. 3.2 Furniture Components – Desktops, Seats & Shelves: The furniture system links to the panels with blades that lock into position onto the integral steel post. Once in place blades, desktops, seats, shelves etc. are mechanically fixed into position. Once the desktop is assembled cable access holes can be added (position to be confirmed on site) by using a power drill and range of hole cutters. 4.0 Plant & Tools Power Tools (110v): • pistol Drill • vacuum Cleaner • extension Leads • transformer...

 Open the catalog to page 7
method statement-8

Office and Showroom Spaceoasis Ltd Grosvenor House Central Park Telford Shropshire UK TF2 9TW Tel | +44 (0) 1952 210197 Fax | +44 (0) 1952 201303 Email | [email protected] spaceoasis.com

 Open the catalog to page 8

All Spaceoasis catalogs and technical brochures

  1. Flip Top

    8  Pages

  2. Fizz

    14  Pages

  3. Tune

    12  Pages

  4. Julius

    12  Pages

  5. Brody

    12  Pages

  6. Goldstein

    12  Pages

  7. Apex

    12  Pages

  8. Petal

    8  Pages

  9. TEAM DESKS

    12  Pages

  10. Madrigal

    12  Pages

  11. Lobe

    12  Pages

  12. ION

    12  Pages

  13. ESCA

    12  Pages

  14. DEWELL

    12  Pages

  15. DUNE

    12  Pages

  16. BLOOM

    12  Pages

  17. projects

    32  Pages

  18. products

    80  Pages

Archived catalogs

  1. spaceoasis

    48  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.
About ArchiExpo
ArchiExpo is a marketplace that offers B2B players a complete experience, from product sourcing to purchase. ArchiExpo is an entity of VirtualExpo Group.