1. Catalogs
  2. SE Controls
  3. Smoke Ventilation Solutions Brochure

Smoke Ventilation Solutions Brochure

Smoke Ventilation Solutions Brochure
1 / 48 PagesView full catalog

Smoke Ventilation Solutions Brochure

Product catalog summary
Overview: SE Controls specializes in smoke ventilation solutions, offering systems for life safety in buildings. With over 25 years of experience, they provide designed, installed, and maintained smoke and heat exhaust ventilation systems (SHEVS) for various buildings.
Key Features: SE Controls offers natural and powered smoke ventilation systems that create a smoke-free layer above the floor, enhancing safe escape and early fire fighting. Their systems comply with British and European legislation and are CE certified.
Design and Consultation: SE Controls provides design services for code-compliant and fire-engineered solutions, using Computational Fluid Dynamic (CFD) analysis to optimize system performance and ensure compliance with Approved Document B.
Installation and Commissioning: Experienced engineers ensure smooth project delivery, coordinating with third parties and adhering to building schedules. Systems are commissioned, demonstrated, and certified to meet design specifications before handover.
Maintenance: Regular maintenance is crucial for system functionality in emergencies. SE Controls offers ongoing maintenance services in line with the Regulatory Reform Order (RRO) and Building Regulations.
Product Offerings: SE Controls provides products like automatic opening vents (AOVs), smoke shaft doors, and control systems, tested to EN12101-2 standards.
Reference Sites: SE Controls has implemented systems in locations such as the London School of Economics and Battersea Reach in London.
SHEVTEC Smoke Control Systems: The document details specifications and guidelines for SHEVTEC systems, including doors, dampers, roof vents, and control panels, designed to comply with EN12101-2 standards.
Performance Requirements: The smoke control system includes AOVs, control panels, smoke detectors, and manual control points. In single stair buildings, AOVs are activated by smoke detectors; in multi-stair buildings, manual actuation is used.
Specifications and Standards: Systems must comply with BS EN 60335-2-103:2003 and ADB requirements, ensuring proper installation and operation.
Control Panel and Manual Override: Control panels should minimize damage risk, often located within smoke shafts. Manual actuation is required for vents in corridors with multiple escape stairs.
Indication and Smoke Detector Placement: Indication panels can inform the fire service of the fire floor. Smoke detectors should be in common access spaces with a maximum travel distance of 7.5m.
Fire Fighting Cores: Fire fighting cores should remain smoke-free, achievable by opening windows or constructing a smoke shaft.
Fire Engineered Solutions: Powered smoke shafts offer effective solutions, especially for cold smoke, requiring detailed design and approval.
System Commissioning and Maintenance: SHEV systems must be commissioned, demonstrated, and certified by qualified personnel. Building owners must maintain the system to avoid prosecution.
Product Standards and Compliance: Products must be tested to specific standards before carrying the CE mark. Compliance with BS EN 12101 standards ensures adherence to Regulation 7 of the Building Regulations 2000.
EN 12101 Standards Overview: EN 12101 covers smoke and heat control systems, with ten parts ranging from smoke barriers to power supplies.
System Compatibility: SHEVs components must meet individual standards and function effectively as a system.
Maintenance and Fire Safety Regulations: The Regulatory Reform (Fire Safety) Order 2005 requires fire precautions to protect relevant persons, with significant findings recorded if the organization employs five or more people.
Enforcement of Fire Safety Order: The local fire and rescue authority enforces the Order, inspecting premises for compliance and issuing notices if necessary.
Contact Information: SE Controls, Lancaster House, Wellington Crescent, Fradley Park, Lichfield, Staffordshire WS13 8RZ. Tel: +44 (0)1543 443060, Email: [email protected], Website: www.secontrols.com
See more

Catalog excerpts

Smoke Ventilation Solutions Brochure-1

Smoke Ventilation Solutions

 Open the catalog to page 1
Smoke Ventilation Solutions Brochure-3

SE Controls is the leading specialist provider of Smoke Ventilation Solutions, offering the complete turn key solution to create an innovative and comprehensive life safety ventilation system. The effects of smoke being generated by fire can reduce the visibility for the occupants and can increase the time to escape the fire, creating greater exposure to smoke inhalation that can consequently cause loss of consciousness. SE Controls has over 25 years experience of working with clients through every step of the construction process, delivering designed, installed and maintained smoke and heat...

 Open the catalog to page 3
Smoke Ventilation Solutions Brochure-4

Principles of Smoke Ventilation

 Open the catalog to page 4
Smoke Ventilation Solutions Brochure-5

Smoke ventilation allows the creation of a smoke free layer above the floor by removing smoke. This improves the conditions for safe escape and permits the fire to be fought in its early stages. What happens if there is no means of smoke ventilation? 1. In an unventilated room, smoke will rise directly to the ceiling. 2. The smoke will begin to fill the space available moving laterally instead of vertically. 3. Convection of the smoke will cause it to be drawn back down to low level reducing visibility and the chances of a safe escape. 4. Temperatures will continue to rise causing the potential...

 Open the catalog to page 5
Smoke Ventilation Solutions Brochure-6

Core Competencies – The Total Solution Fire Engineered Solutions The design of smoke and heat exhaust ventilation systems (SHEVs) falls into two distinct areas, namely those systems complying with building regulations and those systems requiring a fire engineered solution. SE Controls is able to offer both. It is not always possible to apply a code compliant or prescriptive solution to every scheme. When this occurs, Approved Document B (ADB) allows the designer to step away from ADB and provide a Fire Engineered Solution. As a Fire Engineered Solution will be dealing with many unknown factors,...

 Open the catalog to page 6
Smoke Ventilation Solutions Brochure-7

Whether the project installation is a new project or an existing install, SE Controls experienced and fully trained team of engineers are on hand to work in accordance with the building schedule to deliver the project on time and to schedule. As the smoke ventilation system plays a crucial part of the life saving strategy, it is fundamental that the system is commissioned, demonstrated and certified to the design methodology. SE Controls qualified engineers fully inspect each system before despatch and installation ensuring that the system meets the design profile before hand over to the client....

 Open the catalog to page 7
Smoke Ventilation Solutions Brochure-8

"fVlUlP Des'9n anc'Cost Planning At early design stages SE Controls can assist the client and design team in specifying the most cost efficient, practical and compliant solution for smoke ventilation. A detailed design can be produced which allows plans to be submitted for approval. This solution can be within the guidelines of approved document B or a bespoke fire designed solution. Decision making process of the design • Natural or powered systems • Escape/fire fighting stair positions • Escape distances • Smoke shaft size and positions • Smoke shaft AOV products • Fire doors • Louvre &/or...

 Open the catalog to page 8
Smoke Ventilation Solutions Brochure-9

Typical Building Footprint

 Open the catalog to page 9
Smoke Ventilation Solutions Brochure-10

Approval and Tendering Process SE Controls offers coordination with the client, the approving body and bidding contractors throughout the tendering process. Considerations: • Coordination with approving body • Production of specification quotations for tendering • Planning and mid tender meetings Natural Smoke Shaft Mechanical Smoke Shaft Mechanical Smoke Shaft

 Open the catalog to page 10
Smoke Ventilation Solutions Brochure-11

Floor Layouts secontrols.com Top of Mechanical Smoke Shaft Fan Top of Escape Stairs Opening Vent Top of Natural Smoke Shaft Opening Vent Top of Escape Stairs Opening Vent Mechanical Smoke Shaft Escape Stairs Natural Smoke Shaft Main Entrance End of Corridor AOV Fire Exit

 Open the catalog to page 11
Smoke Ventilation Solutions Brochure-12

Roof Vent Upstand Height Stage 1 Coordination At early stages of the project vital information is required by the contractor. AOV openings are built into the shell and the core of the building to various elements including, walls, roofs and cores. This is particularly important for smoke shafts and cores that may be pre cast or built off site. x Aspect Ratio of Mechanical Smoke Shaft Height, Size and Location of AOV Height of Smoke Shaft Mechanical Smoke Shaft Mechanical Smoke Shaft Escape Stairs

 Open the catalog to page 12
Smoke Ventilation Solutions Brochure-13

Roof Vent Upstand Height Height, Size and Location of AOV Aspect Ratio of Natural Smoke Shaft x Natural Smoke Shaft Escape Stairs

 Open the catalog to page 13
Smoke Ventilation Solutions Brochure-14

1st Fix Cabling The smoke ventilation system must be fully designed and approved prior to the installation of the 1st fix cabling. Full wiring schematics are produced for cable installation with all devices located and detailed. This work can be carried out by SE Controls or the contractor who is already on site. Fire rated cable Data out Fire rated cable Fire rated cable OS2 Control System Graphical Key 14 Fire rated cable Data in

 Open the catalog to page 14
Smoke Ventilation Solutions Brochure-15

OSLoop Control System Fire rated cable Fire rated cable This image is a graphical representation, full schematics will be provided. Smoke Ventilation Fire rated cable OSLoop Control System Graphical Key Fire rated cable

 Open the catalog to page 15
Smoke Ventilation Solutions Brochure-16

Product Installation Product Installation At suitable stages after 1st fix cabling the associated smoke vent products are installed and connected. SE Controls smoke ventilation products are suitably certified and compliant to British and European legislation. Double Leaf Opening Roof Vent Mechanical Smoke Shaft Fan Manual Control Point (MCP) Safety Floor Grille Smoke Detector Smoke Shaft Door Smoke Shaft Door FH

 Open the catalog to page 16
Smoke Ventilation Solutions Brochure-17

140º Opening Roof Vent Roof Louvre Smoke Shaft Door DH OSLoop Coordinator

 Open the catalog to page 17
Smoke Ventilation Solutions Brochure-18

Commissioning and Handover When permanent mains power is available the SHEV system is commissioned, certified and handed over. At this point the client can be satisfied that a certified, fit for purpose and compliant smoke ventilation system is installed within their building.

 Open the catalog to page 18
Smoke Ventilation Solutions Brochure-20

Maintenance – Nationwide Maintenance SE Controls provides ongoing maintenance to ensure that the smoke ventilation system continues to operate as designed to provide a life safety system. The building owner is required to maintain the system in accordance with the Regulatory Reform Order (RRO) and The Buildings Regulations, Approved Document B.

 Open the catalog to page 20
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.