FIREPRO® DUCT WORK
4Pages

{{requestButtons}}

Catalog excerpts

FIREPRO® DUCT WORK - 1

FIRE PROTECTION OF DUCTWORK

Open the catalog to page 1
FIREPRO® DUCT WORK - 2

Do not allow your design to be compromised… Insist on a Rockwool system that meets the standards… REQUIREMENTS Ductwork passing through a fire rated wall or floor must comply with BS 476: Part 24: 1987. This British Standard requires that any ductwork meets three criteria: • Stability • Integrity • Insulation For example, a system having 1 hour stability, 1 hour integrity and 15 minutes insulation is rated at 15 minutes only. The least of the three periods of compliance defines the fire rating. For ductwork passing through a fire rated wall or floor, no British Standard allows stability and...

Open the catalog to page 2
FIREPRO® DUCT WORK - 3

Stability Integrity Insulation MEETING THE STANDARDS Rockwool’s Fire Duct Systems is a cost-effective, one-layer insulation application which can be used to meet the required standards. Fire Duct Slab, Fire Duct PSM and Fire Duct Section have been specially engineered to combine maximum fire protection with the least possible weight and thickness. The simplicity of the single layer, glued, dry fix or combination joint system ensures rapid and reliable installation to both vertical and horizontal duct systems. Fire Duct Systems materials can be used to provide 1⁄2 hour, 1 hour, 11⁄2 and 2...

Open the catalog to page 3
FIREPRO® DUCT WORK - 4

FIRE PROTECTION OF DUCTWORK Technical advice Technical advice is available from the Rockwool Technical Helpline: 0871 222 1780 Rockwool Limited, Pencoed, Bridgend CF35 6NY Email: info@rockwool.co.uk Web: www.rockwool-firepro.com

Open the catalog to page 4

All ROCKWOOL catalogs and technical brochures

  1. Fire Duct

    5 Pages

  2. CAVITY

    12 Pages

  3. firepro-book

    109 Pages

  4. CLADDING ROLL

    12 Pages

  5. Twinroll

    8 Pages

  6. FLEXI®

    20 Pages

  7. ROCKFRAME

    4 Pages

  8. Rockwool vrb

    3 Pages

  9. ROCKPRIME®

    2 Pages

  10. RECYCLING

    4 Pages

  11. EDC

    8 Pages

  12. CORE RANGE

    24 Pages

  13. CORROSION

    20 Pages