Catalog excerpts
PERI Product Range Formwork Scaffolding Engineering Issue 1 | 2012 SG Climbing Systems Climbing Scaffold Self-Climbing System Climbing Protection Panel Platform Systems Wall Formwork Panel Formwork Girder Formwork Circular Formwork Facade Formwork Brace Frame Successful construction with PERI Column Formwork Square Rectangular Circular Scaffold, Stairways, Working Platforms Facade Scaffold Working Platform Weather Protection Roof Stairway Access Slab Formwork Panel Formwork Beam Grid Formwork Girder Formwork Slab Table Beam Formwork Bridge and Tunnel Formwork Cantilevered Parapet Carriage Cantilevered Parapet Platform Engineer’s Construction Kit Shoring Systems Steel Slab Props Aluminium Slab Props Tower Systems Heavy-Duty Props Accessories Plywood Formwork Girders Stopend Systems Pallets Transportation Containers Engineering and Software Efficient formwork planning and design through use of PERI CAD software. Site Supervision Provided to ensure efficient use of systems. Rental Service Large rental fleet with cleaning and repair services. Training Seminars and customised courses to support our customers. The illustration featured in this brochure are photographs taken at a particular time on a construction site. This is why the safety details shown cannot be considered as final. © Copyright by PERI GmbH PERI ASIA Pte. Ltd. No. 1 Sims Lane #06-10 Singapore 387355 Phone +65 6744 2989 Fax +65 6744 3693 pha@periasia.com www.periasia.com Rep Ofce of PERI ASIA Pte. Ltd. in HCMC Room 1333, Floor 13, No. 39 Le Duan Ho Chi Minh City, Vietnam Phone: +84 8 6288 8974 Fax: +84 8 6288 8701 SG en 05 | 2012 5xp XXXXXX © PERI GmbH PERI Services d’Leedon, Singapore Page 5 Le Nouvel Ardmore, Singapore Page 12 Asia Square Tower 2, Singapore Page 8 Multi Storey Car Park at Simei, Singapore Page 14 scope
Open the catalog to page 1Cover Photo: (Left-to-right) Asia Square Tower 2, Asia Square Tower 1 and Marina Bay Suites. All three buildings are constructed using PERI formwork systems. Dear Customers and Readers, Welcome to the latest issue of our PERI Scope. This issue is very special as it features a number of Singapore’s new landmarks such as Asia Square Tower 2, d’Leedon and Skysuites @ Anson. It also showcases impressions of PERI Asia’s participation at the first construction equipment exhibition in Singapore, the BuildTechAsia 2011, where we were delighted to welcome more than 400 interested construction...
Open the catalog to page 2A future prestigious iconic landmark designed by Zaha Hadid is climbing with PERI systems d’Leedon Condominium, Singapore The new development comprises 7 towers of 1,703 apartments and 12 villas on a large land site of 838,488 square feet. Fast and cost-effective formwork and scaffolding products combined with best technical solutions Contractor Woh Hup (Private) Ltd. Field Service PERI ASIA Pte. Ltd., Singapore Warehouse for Yang Kee Logistics, Singapore A 10-storey warehouse and an ancillary eight-storey office block are currently being built at Jurong Pier Road. The development is owned...
Open the catalog to page 3Fast and safe climbing solutions help to realise fast building progress Skysuites @ Anson, Singapore At 71-storey high, Skysuites @ Anson is set to be one of the tallest residential building in Singapore. The development will have 360 units and is situated in Singapore’s CBD at 8 Enggor Street. Skysuites @ Anson will share the same building height of 250 m as Altez condominium, which was featured in the 2011 issue of PERI Scope, another project by the same contractor using similar PERI formwork systems which is located just next to it. To achieve their target of 6 to 7 day cycle per floor...
Open the catalog to page 4Ahead of the schedule – thanks to PERI products and competent technical support Asia Square Tower 2, Singapore Contractor Hyundai Engineering & Construction Co., Ltd. Field Service PERI ASIA Pte. Ltd., Singapore Tower 2 will feature 46 floors with the hotel occupying the 32nd to 46th floors. With the PERI RCS Rail Climbing Safety Screen, the slab edges on the upper floors are completely enclosed. ST 100 is a very efficient shoring system which can be assembled quickly. All ST 100 system components are simply slotted together without any bolts or pins. Asia Square Tower 2 is the second...
Open the catalog to page 5Safe and time-saving concreting of slabs in great heights 8 Storey Factory, Singapore A new 8-storey factory is currently being built in the western industrial area of Singapore at Sunview Way. Each floor of the factory is being divided into three sections, with each section covering an area of about 3,500 m2 (50 m x 70 m). For fast and cost-effective casting of slabs, the PD 8 Table System was chosen for this application. The typical tables have a height of 11 metres and were designed to provide optimal coverage with the largest table measuring 3.6 m (W) x 5.5 m (L). For columns, the...
Open the catalog to page 6The crane-independent ACS Self Climbing System and RCS Rail Climbing System are being used for casting of the core walls. Uniquely designed condominium development – formed with safe and reliable system equipment Le Nouvel Ardmore, Singapore Contractor Thian Sung Construction Pte. Ltd. Field Service PERI ASIA Pte. Ltd., Singapore Khoo Wang Yang, Site Manager: “The unique design of the Le Nouvel Ardmore has posed many challenges in the construction process. But PERI have been able to support us with solutions and formwork systems that are fast, safe and efficient.” Le Nouvel Ardmore is a...
Open the catalog to page 7PERI sponsors BCA’s Skilled Builders Competition It was a privilege for PERI to be one of the sponsors for the Skilled Builders Competition – System Formwork Installation category, jointly organized by the Building & Construction Authority (BCA) and the Singapore Contractors Association Limited (SCAL). The Skilled Builders Competition for System Formwork Installation was held from 25 to 26 April 2011 at the BCA Academy. It was part of the Singapore Construction Productivity Week which aimed to raise awareness of productivity improvement at the workers’ level through the adoption of...
Open the catalog to page 8