The 2012 issue of the PERI Scope Middle East magazine highlights successful construction projects utilizing PERI formwork and scaffolding solutions across the Middle East. The document emphasizes safety, efficiency, and ecological sustainability in construction.

Key Projects
  • Desert Learning Centre, Al Ain, UAE: Showcases PERI's formwork solutions.
  • Jaber al Ahmad Hospital, Kuwait City, Kuwait: Notable for its large-scale construction needs.
  • Sky Gate, Beirut, Lebanon: Utilized PERI systems for efficient construction.
  • Office Tower at KAFD, Riyadh, Saudi Arabia: A fast-track project using PERI's SKYDECK slab formwork.

Formwork Solutions
The document details various PERI systems used in different projects:
  • SKYDECK: Lightweight slab formwork for fast erection and minimal cycle times.
  • VARIO GT 24: Used for core walls, offering flexibility and efficiency.
  • LICO Column Formwork: Known for easy handling and efficiency in column construction.
  • PERI UP Rosett Flex: A versatile scaffolding system adaptable to various structures and heights.

Case Studies
  • Conference Center, Riyadh: Part of the King Abdullah Financial District, utilizing multiple PERI systems for efficient construction.
  • Masdar Institute, Abu Dhabi: Focused on energy-efficient design, using customized PERI solutions for formwork.
  • Etihad Towers, Abu Dhabi: A mixed-use development using PERI's climbing formwork for core walls.
  • Emergency Baghdad Water Supply Project: Highlighted for its complexity and the efficiency of PERI formwork solutions.

Conclusion
PERI's commitment to safety, efficiency, and sustainability is evident in their approach to construction projects. Their systems are designed to optimize material use and ensure high safety standards, making them a preferred choice for large-scale and complex projects in the Middle East.
Project Overview and Specifications
The document outlines various construction projects utilizing PERI formwork solutions. Key projects include the QP District in Qatar, Sheikh Zayed Desert Learning Center in UAE, Khalifa Port and Industrial Zone in Abu Dhabi, and several others in Kuwait and Lebanon. These projects involve complex architectural designs requiring advanced formwork systems.

Formwork Systems and Solutions
1. VARIO Wall Formwork: Used for forming complex conical shapes and circular tanks, supported by heavy-duty spindles and horizontal steel walers.
2. RUNDFLEX: Applied for upper parts of circular tanks.
3. MULTIFLEX: Utilized for slab heights with ST 100 shoring towers.
4. SKYDECK: A lightweight aluminum panel slab system allowing efficient and safe slab pouring.
5. PD 8 and VARIO GT 24: Supporting tools for high-rise towers, providing flexibility and high load-bearing capacities.

Project Highlights
  • QP District, Qatar: Features a spiral design with towers and a strict construction schedule. PERI systems were chosen for their lightweight and crane-independent capabilities.
  • Sheikh Zayed Desert Learning Center, UAE: A LEED Platinum and Estidama 5 Pearls certified project, showcasing sustainable architecture with unique formwork solutions for complex geometries.
  • Khalifa Port and Industrial Zone, Abu Dhabi: Utilizes VARIO and MULTIFLEX formwork for large-area applications, ensuring fast cycles and high load capacities.
  • Sky Gate, Beirut, Lebanon: Employs VARIO and Self Climbing Systems for efficient construction of high-rise towers.
  • Jaber Al Ahmad Al Sabah Hospital, Kuwait: A mega project with extensive use of TRIO and VARIO formwork systems for various structural elements.


Technical Insights and Recommendations
The document emphasizes the importance of choosing the right formwork systems for complex projects. PERI's solutions are highlighted for their adaptability, ease of use, and ability to meet high-quality standards. The projects demonstrate the effectiveness of PERI's engineering support and on-site solutions in overcoming construction challenges.

Conclusion
PERI's formwork systems have been instrumental in the successful execution of large-scale construction projects across the Middle East. Their innovative solutions and technical support have enabled contractors to meet tight schedules and achieve high-quality results.
Overview
The document discusses the use of PERI systems in various construction projects across the Middle East, highlighting their durability, flexibility, and efficiency. Key projects include the King Abdullah Financial District in Saudi Arabia and the Central Bank of Oman expansion.

Specifications and Systems
1. SKYDECK Panels: Lightweight panels that minimize crane usage and facilitate easy handling by workers.
2. MULTIPROP Towers: Used at double height for ease of construction.
3. ACS and RCS Systems: Self-climbing systems used for core walls, ensuring high safety standards and efficient cycle times.
4. VARIO GT 24 Wall Formwork: Versatile solution for core and retaining walls.
5. LICO Column Formwork: Lightweight and cost-effective, allowing manual assembly and dismantling.

Project Highlights
King Abdullah Financial District (KAFD), Saudi Arabia:
- Designed as a state-of-the-art business hub.
- Utilized ACS and RCS systems for core walls, achieving a 3 to 4-day cycle.
- SKYDECK and MULTIPROP systems used for typical floors and tower assembly.
- Achieved high safety standards and efficient construction cycles.

Central Bank of Oman, Muscat:
- Involved expansion and renovation of existing facilities.
- Used LICO and VARIO systems for columns and walls, reducing manpower and wastage.
- Achieved clear surface finishing and efficient use of crane availability.

Conference Center, Riyadh, Saudi Arabia:
- Part of the KAFD development.
- Fast-track project with a large-scale footprint.
- Utilized LICO column formwork and VARIO GT 24 wall formwork for efficient cycle times.
- SKYDECK slab formwork used for large slab areas, optimizing material costs.

Recommendations and Best Practices
- PERI systems provide construction-compliant solutions with a wide product range.
- Systems are praised for their easy handling, flexibility, and ability to adapt to varying conditions.
- PERI's technical support and service are highly valued by contractors.

Conclusion
PERI systems have proven to be effective in delivering safe, efficient, and cost-effective solutions for large-scale construction projects. Their adaptability and ease of use make them a preferred choice for contractors in the Middle East.
See more

Catalog excerpts

Formwork Scaffolding Engineering Issue 1 | 2012 Middle East-1

SKYDECK – the light-weight slab formwork for large-scale projects on fast-track Formwork Scaffolding Engineering Issue 1 | 2012 Middle East Conference Center on Parcel A01, Riyadh, Saudi Arabia Daniel Keogh, Senior Construction Manager: “The project involves multiple work fronts that require multiple solutions. The PERI range of systems, especially for formwork, enabled the construction team to address each differing situation with a system to suit. Where individual work areas incurred varying conditions, the flexibility of the PERI systems allowed for adaption of the formwork to the requirements. Each PERI system offers its own efficiency, whether through plant, resources or rotation of material, which can be imparted into the programming of works.” The conference center is part of the King Abdullah Financial District (KAFD) in North Riyadh, which is one of the most prestigious developments in Saudi Arabia. The construction of the conference center commenced in August 2011 and is expected for finalization mid 2012. This fast-track project comprises a carpark in four basement levels and will provide space for more than 1,500 cars over a total built-up area of 29,000 m². Some of the main objectives from the contractor were to create an extremely safe working environment, The SKYDECK slab formwork allows a systematic and fast erection by using its few components. Three PERI systems (VARIO GT 24, LICO Column Formwork and SKYDECK) work „hand-in-hand“ on several floors. The large-scale footprint and fast-track program of the project required the delivery of a huge formwork volume in a short time, which was successfully executed by PERI in Saudi Arabia, Germany and several other subsidaries worldwide. high speed erection with minimum cycle timings as well as optimizing the cost of material by using economical systems. All of the above objectives have been met by PERI. For the large number of columns the LICO column formwork was selected. Due to the easy handling and few components needed, a one day cycle was achieved with 11 sets of shutters. The contractor was able to cast the core walls in a 3 to 4 days cycle by using the VARIO GT 24 wall formwork. One major concern was the huge slab area, which needed to be casted in a very short time. PERI provided the light-weight slab formwork SKYDECK with its dropheads, MULTIPROP MP 480 and MP 350. The 24,400 m² of easy-to-use decking system and the 36,000 m² propping were utilized in a most efficient way. Furthermore, SB-2 Brace Frames have been used for the single-sided retaining walls with heights up to 4.80 m. All in all, PERI is able to provide the perfect formwork solution for any fast-track project requirement. Formwork The illustration featured in this brochure are photographs taken at a particular time on a construction site. This is why the safety details shown cannot be considered as final. © PERI GmbH Scaffolding Engineering Successful construction with PERI ME en 04/2012 31.35epp Art. Nr.: 793078 © PERI GmbH Contractor El Seif Engineering Contracting Company Field Service PERI Engineering, Saudi Arabia Desert Learning Centre, Al Ain, United Arab Emirates Page 8 Sky Gate, Beirut, Lebanon Page 14 Jaber al Ahmad Hospital, Kuwait City, Kuwait Page 12 Office Tower at KAFD, Riyadh, Saudi Arabia Page 15 scope

 Open the catalog to page 1
Formwork Scaffolding Engineering Issue 1 | 2012 Middle East-2

Cover photo Etihad Towers in Abu Dhabi is being built with the help of PERI climbing formwork. PERI also delivered formwork and scaffolding for the buildings on the left and on the right side of this new high-rise building. Maximum flexibility for a wide range of applications PERI UP Rosett Flex Dear Customers and Dear Readers, We are extremely pleased to present you with a new issue of the PERI Scope Middle East magazine. The selected projects feature an interesting cross-section of our formwork, scaffolding and engineering solutions. Apart from large-scale projects such as the Jaber Al Ahmad...

 Open the catalog to page 2
Formwork Scaffolding Engineering Issue 1 | 2012 Middle East-3

Economical formwork solutions for a project leading towards an eco-friendly future Masdar Institute of Science and Technology, MIST 1B, Abu Dhabi, United Arab Emirates The expansion of Masdar Institute of Science and Technology covers the construction of a student accommodation, seven open laboratories, a multi-use hall facility, swimming pool and a gym. It will incorporate similar energy efficient design elements such as shaded streets, natural ventilation and heat reflecting facades that makes the facility and architecture unique. The total built up area is 82,000 m² and is expected to be completed...

 Open the catalog to page 3
Formwork Scaffolding Engineering Issue 1 | 2012 Middle East-4

High quality formwork solutions with easy-to-use SKYDECK systems QP District, Qatar The early striking feature allowed very fast cycles and a minimum of equipment to transport between levels, independently of the crane. The QP District is one of the largest real estate projects currently in Qatar. The project includes: 3 basement floors, parking and technical, podium retail and technical, 9 towersoffice, shell and core, 1 hotel and convention center, a Prayer hall and an energy center. The towers are posi­ Iconic landmark at Abu Dhabi Corniche risen with PERI‘s climbing solution Etihad Towers,...

 Open the catalog to page 4
Formwork Scaffolding Engineering Issue 1 | 2012 Middle East-5

German Engineering and customized formwork solutions for three-dimensional shapes and angles Desert Learning Centre, Al Ain, United Arab Emirates Sheikh Zayed Desert Learning Center (SZDLC), one of the most prestigious projects within the region of Al Ain, is a tribute to the late Sheikh Zayed Bin Sultan Al Nahyan and part of the Al Ain Wildlife Park Resort development of Al Ain Zoo. The Education through the exhibition building is not only an outstanding landmark project, but rather an architectural sculpture, which blends with its surrounding environment and reaches into the future by incorporating...

 Open the catalog to page 5
Formwork Scaffolding Engineering Issue 1 | 2012 Middle East-6

Comprehensive bridge formwork and shoring solution Khalifa Port and Industrial Zone, Abu Dhabi, United Arab Emirates The Khalifa Port and Industrial Zone tis a multi-purpose facility located in Taweelah. The project includes a worldclass container and industrial port and logistics, commercial, educational and residential special economic and free trade zones. A mixture of VARIO Wall Formwork and MULTIFLEX Slab Formwork has been used for the largearea formwork. These guarantee simple handling, Contractor Al Habtoor Leighton Group, Abu Dhabi, UAE Field Service PERI L.L.C., UAE Sky Gate tower rising...

 Open the catalog to page 6
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.