Catalog excerpts
PRODUCTION OF TEMPERED GLASS AND INSULATING GLASS UNITS
Open the catalog to page 1ABOUT US PARITET was founded in 1996 and has been manufacturing translucent structures since its inception. Large in-house production facilities and the best European equipment allow us to work and provide Ukrainian cities with quality products. All these years, we have been improving every process, minimizing costs and saving energy resources step by step. PARITET is not resting on its laurels, but is increasing its production rates and striving to develop new markets. The company makes strategic decisions in compliance with all market rules and fair competition. Each achievement is...
Open the catalog to page 2OUR PRODUCTION ADVANTAGES Large format Triplex production equipment 4000*2400 mm Large format glass tempering furnace 6000*3000mm Automated insulating glass unit assembly lines 5000*2700mm, high production speed Automated glass painting line, perfect painting results without defects with a warranty of up to 10 years Annual production volume of tempered glass is over 150,000 sq.m. Certificates of conformity confirming the high level of production.
Open the catalog to page 3A complete closed cycle from design to production allows us to quickly and efficiently manufacture a product of almost any level of complexity. Supply comprehensiveness. Our own production facility with the widest range of glass processing capabilities allows us to produce various types of finished products and offer a wide range of products. Therefore, our customer receives maximum work on their project from a single supplier. Only high-quality materials and components. PARITET uses the most advanced equipment and has high requirements for product quality. Close cooperation with...
Open the catalog to page 4GLASS TREATMENT
Open the catalog to page 5GLASS TEMPERING AND STRENGTHENING
Open the catalog to page 6PRODUCTION OF INSULATING GLASS UNITS
Open the catalog to page 7RESIDENTIAL COMPLEX "VEZHA CHKALOV" @ Odesa, Ukraine [3=T| types of work performed: triple glazing -(Guardian HP. Neutral50/32 ESG-16PremBlac-4float-14PremBlac-4l-glass ESG) insulating glass unit - (Guardian HP.Neutral 50/32 ESG -14PremBlac-6float ESG Emalit 7031) Q year of completion: 2014-2015
Open the catalog to page 8(§) Chisi nau, Moldova [3=1 types of work performed: multifunctional,highly selective, tempered triplex glass unit 8 SN 70/37 Ge ESG-H - 18TGI Ps Ar - 6F Ge ESG - 16 TGIPs Ar - 4.4.2 Low-E Ge (56mm) with energy-saving coating and HST treatment Q year of completion: 2017-2018
Open the catalog to page 9BUSINESS CENTER "UNIT CITY" Kyiv, Ukraine [3=1 types of work performed: design and supply of materials (building 14-15) © year of completion: 2020-2021
Open the catalog to page 10PARITET BUSINESS CENTER "MAIB MOLDOVA AGROINDBANK" (§) Chisinau, Moldova [3==| types of work performed: double-glazed, tempered, structural unit 8 HP Silver 43/31 ESGH - 16 Chr DC Ar - 6 Float ESG-H - 20 Chr DC Ar - 8 Low-E ESG-H 58 mm, with energy-saving coating and HST treatment (k) year of completion: 2020
Open the catalog to page 12SHOPPING MALL "MEGADOM" (g) Odesa, Ukraine [3=1 types of work performed: partitions, railings, elevator shafts, 4500 sq. m. of all-glass structures 0 year of completion: 2014-2015
Open the catalog to page 14SHOPPING MALL "PROSPECT" (0) Kyiv, Ukraine |0 types of work performed: two thousand square meters of all-glassconstructions and elevator shaft glazing; The mullion and transom system of glazing - 1600 sq.m. Structural glazing system- 1300 sq.m. 0 year of completion: 2014-2015
Open the catalog to page 15PARITET ODESA CENTRAL AIRPORT (3) Odesa, Ukraine [3=T| types of work performed: all-glass partitions and enclosing structures, self-supporting all-glass partitions and spider partitions; scope of work performed: more than 1000 sq.m. (V) year of completion: 2018-2019
Open the catalog to page 16SHOPPING MALL "MEGANOM" (§) Simferopol, Ukraine [3z] types of work performed: 3400 sq.m of all-glass structures and 600 running meters of glass fences 0 year of completion: 2014
Open the catalog to page 18SHOPPING MALL "OCEAN PLAZA" Kyiv, Ukraine types of work performed: 8500 sq. m. of all-glass structures and 1200 running meters of glass fences year of completion: 2014-2015
Open the catalog to page 19CONTACTS FACEBOOK @Paritet.Odessa INSTAGRAM @paritetcompany
Open the catalog to page 20All PARITET LLC catalogs and technical brochures
-
Shower cabins
7 Pages
-
Aestech glass units system
20 Pages
-
uPVC windows and doors
20 Pages
-
Aluminum Structures
48 Pages