INSTALLATION INSTRUCTIONS
2Pages

{{requestButtons}}

Catalog excerpts

INSTALLATION INSTRUCTIONS - 1

INSTALLATION INSTRUCTIONS FOR DOORS WITH REVER or MC3 FRAMES 1. - Every door is provided with a label showing the characteristics, which is placed on the side wall of the frame. Measure the wall opening and make sure it is correct for the measures contained in the label of the door frame. Control right angles, flatness and measurements of the wall opening from the finished floor. Verify the integrity of the wall especially in the anchor points of the door. It is responsability of the client the execution of building works according to current regulations. 2.1.- Measure the “wall opening” dimensions and check if they are appropiate with the required ones. 2.2.- For REVER doors, select the opening side turning the door forward the requested side. Installation and maintenance must be performed by qualified personnel with practice experience. Putting the door into operation is prohibited until it has been established that the door has been installed according our specificationsas as well as its function has been properly tested. Any modification made to this product without our express permission and approval shall render this declaration null and void. 3.2.- Screw the lintel to the brackets through the 8 holes predisposed. 3.3.- Screw the bottom plate to the jambs as shown in the picture using the 4 holes . 4.- FRAME FIXING WITH SCREWS ACCORDING TO THE CERTIFICATION OF THE DOOR 4.1.- Drill the joint through all the holes for screwing prepared in the frame. The upper holes are only in two leaf doors. 4.2.- Insert the frame in the wall opening, place shim plates at the holes if necessary. Lock temporarily. IMPORTANT:The base of the frame must be at the final height of the floor. 4.3.- Screw the frame to the wall respecting the gaps indicated in point 12. Use metallic expansive bolts of 010 and 120mm. 4.4.- Fill the space between the frame and the wall with cement mortar and cover the frame on the push side with cement mortar. Perform the cement works as shown in the picture , let dry if necessary. 5.- FRAME FIXING WITH ANCHORS ACCORDING TO THE CERTIFICATION OF THE DOOR 5.1.- Open the fixing anchors and make the necessary holes in the wall. 5.2.- Insert the frame in the wall opening, and receive the anchors with fast-dry mortar. Control the level of the door, with level and plumb. IMPORTANT: The base of the frame must be at the final height of the floor. 5.3.- Fill with cement mortar all the interior space between frame and wall, and complete the wall as shown. Let dry as necessary. 5.4.- Cover the frame from the push side with cement mortar. Complete the wall as shown. Let dry long enough.

Open the catalog to page 1
INSTALLATION INSTRUCTIONS - 2

INSTALLATION INSTRUCTIONS FOR DOORS WITH REVER or MC3 FRAMES 6.- Insert the leaves in the frame in the shown order such a way that upper and lower hinges matches. Place the hinges (start with the hinge with spring). 6.1 – For the hinge with spring insert the bolt with spring. For the hinge without spring, place the bearing in the inferior gap; place the washer in the superior hole, insert the bolt of the spring through those elements. 6.3. – If required by the local law, load the automatic closure spring using the supplied material in the handle box. Insert the key A in the bolt with spring...

Open the catalog to page 2