Catalog excerpts
Fire protection duct To overcome obstacles in outdoor areas Special solution for necessary cable routing over obstacles in outdoor areas If the installation environment requires obstacles to be overcome, then the fire protection duct offers an economic solution for special cases: Installation duct with intumescent fire protection mesh Prevents the spread of fire via the electrical installation ■ Matching fittings to overcome standard obstacles ■ Can be used as a special solution in the routing of cables over firewalls according to the surveyor's report GA-2021/047b of 11.06.2021 ■ Solution according to recommendation of BMI+AMEV - EltAppendices 2020 (Section 7.3.3.5 – Photovoltaic systems – Fire protection
Open the catalog to page 1Fire protection duct To overcome obstacles in outdoor areas Made of stainless steel for installation in outdoor areas ■ Suitable for mounting on FangFix concrete blocks ■ Fire resistance up to 90 minutes ■ The following components are required for a complete installation in accordance with the image alongside: 2 m Installation duct* 2 x Level, rising 1 x Level, falling double 3 x FangFix concrete block 10 kg 3 x Base for FangFix concrete block 6 x Round head tie *At an obstacle height of > 0.70 m, multiple pieces of duct are required. Level, rising PLMR-LR 1025 A2* Level, falling double...
Open the catalog to page 2All OBO Bettermann catalogs and technical brochures
-
Spacer Clips ASG 732 and ASL 733
20 Pages
-
Quick Wire Cable Suspension
20 Pages
-
The Quick Pipe Portfolio
18 Pages
-
Cavity Wall Electronics Box
2 Pages
-
Cavity Wall Boxes
2 Pages
-
Flush-Mounted Boxes
2 Pages
-
Skirting Trunking SL and RAUDUO
40 Pages
-
IBK In-Concrete Duct System
24 Pages
-
OKB Brush Bar Trunking
2 Pages
-
GES R2 Floor Sockets
2 Pages