video corpo

NexWay-S Package R

NexWay-S Package R
1 / 11 PagesView full catalog

NexWay-S Package R

Product catalog summary
Overview
Mitsubishi Electric's high-speed passenger elevators are designed for high-rise buildings, focusing on safety, efficiency, and environmental sustainability. These elevators are supported by a global network of advanced manufacturing and maintenance facilities.
Specifications
The elevators offer various capacities (1000 to 1350 kg) and speeds (3.0 to 5.0 m/sec). The NexWay-S model features a compact design with a reduced machine room requirement.
Safety Features
Key safety features include the Mitsubishi Emergency Landing Device (MELD), Operation by Emergency Power Source (OEPS), Fire Emergency Return (FER), Firefighters’ Emergency Operation (FE), and Earthquake Emergency Return (EER-P/EER-S).
Efficiency and Ecology
Energy-saving technologies such as LED lighting and the Cooperative Optimization Assignment (ΣAI-2200C) control system enhance energy efficiency and reduce waiting times.
Design and Customization
Elevator car designs offer various materials and finishes, with options for LED indicators and control panels. The Destination Oriented Allocation System (DOAS) optimizes passenger flow.
Hall Fixtures
Hall fixtures include LED and LCD indicators, hall lanterns, and buttons with various illumination colors and tactile options. Boxless fixtures are available for easy installation.
Basic Specifications
Standard specifications cover dimensions and configurations, including minimum hoistway and machine room dimensions for models like P13 to P18. Consultation with local agents is advised for additional specifications.
Horizontal and Vertical Dimensions
Detailed measurements for hoistway and machine room dimensions are provided, with emphasis on consultation for non-standard dimensions.
Operational and Service Features
Features include energy-saving operations, false call canceling, independent service, and emergency operations like fire and earthquake emergency returns.
Group Control Features
Designed to optimize operation in buildings with multiple elevators, features include bank-separation operation, closest-car priority service, and destination-oriented allocation systems.
Emergency Operations and Features
Emergency features include emergency car lighting, fire emergency return, and operation by emergency power source, ensuring passenger safety during emergencies.
Door Operation Features
Features focus on safety and efficiency, including automatic door speed control, door load detectors, and multi-beam door sensors.
Specifications and Features
  • Compliance with EN81-20/50 and EN81-70 standards.
  • Optional features based on operation system.
  • Special services like VIP Operation and Up Peak Service.
Signal and Display Features
  • Auxiliary Car Operating Panel for large-capacity elevators.
  • Basic Announcement system and Car Arrival Chime.
  • Car Information Display and Hall Information Display.
  • Intercommunication and Voice Guidance Systems.
Elevator Planning and Installation
  • Responsibilities exclude certain construction tasks.
  • Requirements for machine room, hoistway, and electrical components.
  • Environmental conditions for optimal performance.
Ordering Information
  • Details required include number of units, speed, capacity, and design specifications.
  • Provide a building sketch and power source details.
Environmental Commitment
  • Mitsubishi Electric emphasizes environmental management and sustainability through energy-efficient products.
See more

Catalog excerpts

NexWay-S Package R-1

A MITSUBISHI ELECTRIC Changes for the Better PASSENGER ELEVATORS (HIGH-SPEED STANDARD-TYPE) Quality^ Motion

 Open the catalog to page 1
NexWay-S Package R-2

High-rise residential buildings are increasing rapidly in emerging nations where high speed elevators are expected. Swiftly responding to the trend of the times, Mitsubishi Electric has concentrated its technologies to develop a new elevator using the most compact devices possible while drawing on the capabilities of the conventional NexWay-S! This includes keeping the footprint of the machine room housing these devices to a bare minimum! Smaller machine room Minimizing increase in machine room size from the conventional NexWay-S -Requiring less machine room space than the custom-type high-speed...

 Open the catalog to page 2
NexWay-S Package R-3

IAI-22 and IAI-2200C control multiple elevators optimally according to the building size. Performance □AI-2100N □XAI-2200C (latest) Group control systems (sec) 30 25 20 15 10 5 0 Morning Daytime Lunchtime Evening up peak down peak Long-wait rate (60 seconds or longer) Morning Daytime Lunchtime Evening up peak down peak Improved: Max. 40% Improved: Max. 80% Cooperative Optimization Assignment (ZAI-2200C) Forecasts a near-future hall call to reduce long waits Q — Car O'" Car call A ■■■Hall call ^ ■■■Traveling direction Destination Oriented Allocation System: DOAS (Optional for ZAI-2200C)...

 Open the catalog to page 3
NexWay-S Package R-4

Ceiling SOO Series S00: Painted steel sheet (Color: Y033 only) Walls, transom panel and doors L210 Series leoT L400 Series usSf L210: Painted steel sheet L400: Painted steel sheet N300 Series N300: Painted steel sheet Materials Finishes and colors Colored and/or etched hairline stainless-steel Painted steel sheet Hairline with etched pattern Colored hairline with etched pattern QZjr( (Gold) (Bronze) (Gold) Flooring Materials and finishes Materials and finishes Notes: *1: Etching pattern EPA-1~6 only. *2: Etching pattern EPA-1 ~3 only. *3: Please consult our local agents for the production...

 Open the catalog to page 4
NexWay-S Package R-5

For front return panel For side wall Short panel (without service cabinet) Long panel Swing panel Full-height panel Full-height panel EN81-70 comply Button line-up Indicator Notes: *1: Some letters of the alphabet are not available. Please consult our local agents for details. *2: The symbol ■ is replaced with a number representing the button type and illumination color, (e.g. CBV1, CBV2, CBV3) Please refer to Button line-up on this page. *3: Mirror stainless-steel faceplates are also available (optional). Please refer to the Design Guide for details.

 Open the catalog to page 5
NexWay-S Package R-6

Entrance Design Mirrors Doors, transom panel and jamb Jamb types Square jamb with transom panel E-312 Splayed jamb with transom panel Handrails Stainless-steel Painted steel sheet ft/tt nr Please refer to the etching finish pattern book, EF4, for details. Dark brown Beige Green Red-violet Light brown White Pink Paleyellow Darkgray Neutral beige Blue Note: *Please consult our local agents for the production terms, etc. Please refer to the Design Guide for details. Actual colors may differ slightly from those shown.

 Open the catalog to page 6
NexWay-S Package R-7

Hall Fixtures Hall position indicators and buttons Segment LED indicators *1, 2, 6 with plastic case Hall lanterns Hall buttons Hall position indicator with lantern LCD hall position indicator LED hall position indicators Button line-up With plastic case PIV■ and HBV■ *3 Illumination colors LCD information displays at hall PID-D417*2 (Built into transom panel) Cross-section of boxless fixtures Boxless These hall signal fixtures can be easily mounted on the wall surface without having to cut into the wall to embed the back box. 11 Wiring hole Notes: *1: Some letters of the alphabet are not available....

 Open the catalog to page 7
NexWay-S Package R-8

Basic Specifications Horizontal Dimensions 1-Door 1-Gate Code number [Terms of the tables] • These tables show standard specifications without the fireproof landing door and counterweight safety. Please consult our local agents for other specifications. • CO: 2-panel center opening doors, 2S: 2-panel side sliding doors. • Minimum hoistway dimensions (AH and BH) shown in the table are after waterproofing of the pit and do not include plumb tolerance. Note: *1: The minimum hoistway dimensions (AH and BH) shown in the table above is a space for a car when two or more cars are located in the same...

 Open the catalog to page 8
NexWay-S Package R-10

Important Information on Elevator Planning Feature Work Not Included in Elevator Contract The following items are excluded from Mitsubishi Electric's elevator installation work. Their details or conditions are to be conformed to the statement of local laws or Mitsubishi Electric elevator's requirements, are therefore the responsibility of the building owner or general contractor. • Construction of the elevator machine room with proper beams and slabs, equipped with a lock, complete with illumination, ventilation and waterproofing. • Access to the elevator machine room sufficient to allow passage...

 Open the catalog to page 10
NexWay-S Package R-11

State-of-the-Art Factories... For the Environment. For Product Quality. Mitsubishi Electric elevators and escalators are currently operating in approximately 90 countries around the globe. Built placing priority on safety, our elevators, escalators and building system products are renowned for their excellent efficiency, energy savings and comfort. The technologies and skills cultivated at the Inazawa Works in Japan and 12 global manufacturing factories are utilized in a worldwide network that provides sales, installation and maintenance in support of maintaining and improving product quality. As...

 Open the catalog to page 11
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.