video corpo

Elenessa Series-AP

Elenessa Series-AP
1 / 21 PagesView full catalog

Elenessa Series-AP

Product catalog summary
Specifications:
The Series-AP Version 2 passenger elevator is a machine-room-less system with a speed of 1.75 m/sec, a capacity of 1600 kg, and can travel up to 30 floors or 80 meters.
Energy-Saving Technologies:
Mitsubishi Electric's advanced energy-saving technologies include an optional Regenerative Converter, reducing energy consumption by up to 35% and CO2 emissions by 1,400 kg/year. The Environmental Vision 2021 aims to cut CO2 emissions from product usage and production by 30% from base years 2001 and 1991.
Green Technology Features:
The elevator system features a Variable Traveling Speed Elevator System that adjusts speed based on passenger load, enhancing energy efficiency and reducing noise with a compact PM Gearless Machine.
Group Control Systems:
Mitsubishi Electric's AI Neural Network technology optimizes car allocation to reduce passenger waiting times, featuring Cooperative Optimization Assignment and Dynamic Rule-set Optimizer.
Design and User Experience:
The design emphasizes passenger comfort and safety with universal design principles, including tactile buttons, higher ceilings, and see-through doors. Various design options are available.
Materials and Finishes:
Elevator components include tiles, carpets, marble, and granite for flooring, with stainless steel, painted steel sheets, and aluminum for doors, kickplates, and handrails. Lighting options include downlights and full lighting.
Design Options:
Multiple configurations are available, such as different ceiling types and glass arrangements for observation cars, with various wall, door, and panel finishes.
Car and Hall Signal Fixtures:
Details include car operating panels and hall signal fixtures with tactile and flat buttons, compliant with EN81-70 for accessibility.
Group Control and Operational Features:
Advanced group control features use expert systems, fuzzy logic, and neural networks to optimize operations, focusing on energy-saving measures and security enhancements.
Energy and Maintenance Features:
Energy-saving operations include reducing service cars and using regenerative converters. Maintenance features include backup operations for group control microprocessors.
Operational Features:
  • Independent Service (IND): Safe movement to the nearest floor during malfunctions.
  • Safe Landing (SFL): Moves the car to the next floor if doors do not open fully.
  • Continuity of Service (COS): Withdraws troubled cars from group control.
  • Automatic Bypass (ABP): Fully-loaded cars bypass hall calls.
Energy Conservation:
  • Car Fan and Light Shut Off: Automatically turns off when idle.
  • Energy-saving Operation (ESO-W): Balances efficiency and energy consumption.
Emergency Operations:
  • Mitsubishi Emergency Landing Device (MELD): Uses a battery to move to the nearest floor during power failure.
  • Fire Emergency Return (FER): Returns all cars to a specified floor during a fire.
  • Earthquake Emergency Return (EER): Stops cars at the nearest floor during seismic activity.
Control and Monitoring:
  • Supervisory Panel: Remote monitoring and control of elevator status.
  • MelEye System: Web-based monitoring and control with traffic statistics.
Door Operation Features:
  • Automatic Door Speed Control: Adjusts speed based on door load.
  • Door Sensor Self-diagnosis: Checks for sensor failures.
Additional Features:
  • Destination Oriented Prediction System (DOAS-S): Assigns cars based on destination.
  • Special Floor Priority Service (SFPS): Prioritizes calls from VIP floors.
Basic Specifications: The Variable Traveling Speed Elevator System (VSE) is applicable to elevators with a rated speed of 1.0m/sec, with specific details for different door types and capacities ranging from 450kg to 1600kg.
Applicable Standards: The elevators comply with EN81-1 standards, and Mitsubishi Electric holds ISO 9001 and ISO 14001 certifications.
Work Not Included in Elevator Contract: Responsibilities not covered include architectural finishing, hoistway construction, electrical wiring, and equipment storage.
Elevator Site Requirements: Conditions include a hoistway temperature below 40˚C, relative humidity below 90% monthly and 95% daily, and voltage fluctuation within +5% to -10%.
Ordering Information: Details such as the number of units, speed, loading capacity, number of stops, total travel, operation system, design, and power source specifications should be provided when ordering.
See more

Catalog excerpts

Elenessa Series-AP-1

PASSENGER ELEVATOR (MACHINE-ROOM-LESS SYSTEM)

 Open the catalog to page 1
Elenessa Series-AP-2

Environmental Vision 2021 is Mitsubishi Electric's long-range vision for environmental management, which looks towards the year 2021 Making Positive Contributions to the Earth and its People through Technology and Action from product usage by 30% (Base year: fiscal 2001) Reduce total CO2 emissions (Base year: fiscal 1991*) from power generation Respecting Biodiversity Ensuring harmony with nature and fostering environmental awareness reduce, reuse and recycle Reduce resource inputs from manufacturing Mitsubishi Electric Corporation: Base year fiscal 1991; Affiliated companies in Japan: Base year...

 Open the catalog to page 2
Elenessa Series-AP-3

Our Global Standards for Machine-room-less Elevators Application Green Technology Efficiently using resources and minimizing environmental burden through leading-edge technologies. (m/sec) 1.75 Variable Traveling Speed Elevator System 1.6 An elevator that travels faster according to the number of passengers, reducing waiting and traveling time. (Series-AP Version2) 1.0 450 550 630 825 1050 1275 1600 (kg) Machine-room-less As all equipment is installed within the hoistway, there are far fewer restrictions on building design. Group Control Advanced group control systems enhance transport efficiency...

 Open the catalog to page 3
Elenessa Series-AP-4

Mitsubishi Electric's leading-edge technologies have made it possible for elevators to conserve energy. Our Regenerative Converter makes the most of power generated by the traction machine. Additionally, thanks to the joint-lapped core in permanent magnet (PM) motor and energy-saving features, the elevators use energy more wisely and efficiently. Regenerative Converter (Optional) Elevators usually travel using power from a power supply (powered operation); however, when they travel down with a heavy car load or up with a light car load (regenerative operation), the traction machine functions...

 Open the catalog to page 4
Elenessa Series-AP-5

Profile Variable Traveling Speed Elevator System TIME-SAVING With Mitsubishi Electric’s industry-first Variable Traveling Speed Elevator System, an elevator can travel faster than its rated speed according to the number of passengers, ultimately reducing waiting and traveling times. Variable Traveling Speed Elevator System (VSE) (Optional)* The Variable Traveling Speed Elevator System allows elevators to travel faster than their rated speed depending on the number of passengers in the car (rapid mode). When the weight is well-balanced between the car and the counterweight, the traction machine...

 Open the catalog to page 5
Elenessa Series-AP-6

As all equipment is installed within the hoistway, there are fewer restrictions on building design except for the actual space required for the shaft. Architects and interior designers have more design Mitsubishi Electric has succeeded in miniaturizing all key elevator equipment. The gearless traction machine with a compact PM motor is installed within the hoistway and the slim control panel (98mm thick*) is located on the shaft side wall. This arrangement of equipment frees up space normally required for separate machine rooms such as a penthouse. The control panel and equipment are configured...

 Open the catalog to page 6
Elenessa Series-AP-7

Group Control EFFICIENT TRANSPORTATION Mitsubishi Electric's breakthrough Al Neural Network* technology in elevator control enhances transport efficiency and reduces passenger waiting time through optimum car allocation, which allows elevators to use energy effectively. Two basic group control systems offer a variety of innovative group control features. Note: *Neural Network is a mathematical model that emulates the structure of the nerves and cells of the human brain and its information processing mechanism. The features introduced on these pages are applicable to IAI-2200C only. Please refer...

 Open the catalog to page 7
Elenessa Series-AP-8

Mitsubishi Electric designs elevators with not only safety and a comfortable ride, but also passenger-friendliness in mind. Its design makes elevators more pleasant and easier to use. Increased Design Options A sophisticated car design that suits various uses creates a pleasant and comfortable impression. Various graphic indication patterns increase indication examples> RAPID MODE Rapid mode Speed Elevator Exit when doers open Tactile Button Popular stainless-steel buttons Swing-type Car Operating Higher Ceiling Panel A higher ceiling provides a Incorporated in the front spacious atmosphere in...

 Open the catalog to page 8
Elenessa Series-AP-9

Central lighting Durable vinyl tiles (Standard) Central indirect lighting Full lighting Full lighting Full lighting Painted Steel Sheet Central lighting Full lighting Standard Design Image - Central lighting - Painted steel sheet (Y033) with a milky white resin lighting cover Transom panel Front return panels Note: *The higher ceiling type is available upto 2700mmasanoption Walls, Doors, Transom Panel and Front Return Panel Stainless-steel Hairline (Standard) Pattern-printed Steel Sheet (Optional) Not applicable to front return panel Painted Steel Sheet (Optional) Actual colors may differ slightly...

 Open the catalog to page 9
Elenessa Series-AP-10

Design Images Ceiling - Painted steel sheet (Y055) Walls -SUS-HL Transom panel -SUS-HL Doors -SUS-HL Front return panels - SUS-HL Ceiling -SUS-HL Walls - Pattern-printed steel sheet (CP141) Transom panel - Pattern-printed steel sheet (CP141) Doors - Pattern-printed steel sheet (CP141) Front return panels - SUS-HL Transom panel Front return panels Painted steel sheet (Y033) Pattern-printed steel sheet (CP101) Pattern-printed steel sheet (CP101) Pattern-printed steel sheet (CP101) Transom panel Front return panels - Central indirect lighting and - Painted steel sheet (Y033) Ceiling trim Transom...

 Open the catalog to page 10
Elenessa Series-AP-11

Design Images Ceiling trim Transom panel Front return panels Central lighting and downlights [Center] Resin panels with a half-mirrored surface [Sides] Painted steel sheet (Y055) Black alumite Pattern-printed steel sheet (CP121) Pattern-printed steel sheet (CP121) Pattern-printed steel sheet (CP121) Ceiling trim Transom panel Front return panels ■ [Center] Painted steel sheet (Y055) with white acrylic blocks [Sides] Milky white resin panels ■ Pattern-printed steel sheet (CP141) ■ Pattern-printed steel sheet (CP141) ■ Pattern-printed steel sheet (CP141) Ceiling trim Transom panel Front return...

 Open the catalog to page 11
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.