Construction plan - Decking System with Concrete Kerbstone

Construction plan - Decking System with Concrete Kerbstone
1 / 12 PagesView full catalog

Construction plan - Decking System with Concrete Kerbstone

Product catalog summary
Planning Principles
The document outlines essential planning principles for constructing a decking system using concrete kerbstones. It emphasizes creating a soil formation level larger than the decking with a 4% slope to prevent waterlogging. A stable, frost-resistant gravel or crushed stone bed with a 2% slope is recommended. Construction beams should be laid without filling the cavities between them, and megawood® decking boards should avoid ground contact.
Decking Board Assembly
This section highlights the intentional color and texture variations in the boards to enhance the natural wood look. It advises mixing boards before laying and observing the specified laying direction. The document stresses the importance of accounting for dimensional tolerances and using appropriate tools to prevent warping. Boards should be cut at right angles, and all cut edges chamfered. Rubber-containing materials should not be exposed to high thermal loads, and the recommended laying temperature is between 5° - 25°C.
General Information
Providing shade for the terrace is recommended to protect against overheating and UV radiation. The document also mentions the importance of following the construction plan to maintain warranty claims and ensure proper installation.
Article Overview
This section lists various components and accessories required for the decking system, including fastening screws, groove bridges, retaining bands, locking clamps, and more. It provides specifications for each item, such as dimensions and materials.
Deck Covering Options
The document describes different decking board options, including CLASSIC, PREMIUM, PREMIUM PLUS, and SIGNUM, with details on surface textures, color gradients, and gap specifications. It also mentions flame retardant properties and national technical approvals for certain products.
Construction Variants
Construction heights and methods are detailed, with emphasis on ensuring a minimum 2% slope and adequate ventilation. The document provides guidance on laying concrete kerbstones and arranging construction beams, including the use of rubber pads to compensate for slope differences.
Environmental Certification
The document highlights the Cradle to Cradle Certified® status of megawood® products, indicating their compliance with sustainable construction and green building criteria.
Specifications and Preparatory Steps
Ensure all construction beams (CBs) are screw-fixed at the start and end of the boards. For rhombus profiles, maintain an 8 mm gap at joints and use additional CB pieces for support. Incorporate joints in the substructure to align with rhombus profiles, maintaining an 8 mm vertical joint spacing. Specific dimensions and recesses are required for different CB sizes (40 x 60 mm and 80 x 60 mm).
Mounting Procedures
Use locking edge clamps and retaining bands for securing boards. Ensure the first board is correctly aligned and use distance keepers for subsequent rows. Regularly check alignment and secure locking clamps lightly to avoid twisting. For the final row, cut CBs with a 10 mm overhang and chamfer edges.
Rhombus Profile Installation
Prepare additional substructure elements for CB 80 x 60 mm. Attach rhombus profiles flush to CB ends and maintain a 10 mm gap pattern. Use specific screw sizes (M8 x 80 mm and M8 x 40 mm) for fixing profiles. Ensure proper ventilation and gap spacing for longevity.
Mounting on Concrete Kerbstone
Follow planning principles and use appropriate construction beams. Maintain recommended slopes and distances for drainage and stability.
Additional Construction Notes
Use cross bracing on solid ground with rubber pads for stability. Ensure proper ventilation with grille systems for ground-level decks. Follow specific guidelines for mitre cuts and brick bonding patterns.
Care and Maintenance
Conduct basic cleaning twice a year, ideally at temperatures above 15°C. Use water, brushes, and specific cleaning products for stubborn stains. Natural fibre inclusions may occur but can be mechanically removed if necessary.
Related Products and Recommendations
Explore additional products like privacy shields and construction wood for comprehensive outdoor solutions. Refer to online resources for detailed mounting notes and product information.
See more

Catalog excerpts

Construction plan - Decking System with Concrete Kerbstone-1

CONSTRUCTION PLAN DECKING SYSTEM WITH CONCRETE KERBSTONE megaplaner PLANNING SOFTWARE _virtually as an app in your own garden _downloadable for tablet and smartphone cradleto cradle

 Open the catalog to page 1
Construction plan - Decking System with Concrete Kerbstone-2

GENERAL INFORMATION • The basis for all installation variants is the megawood® construction plan! No warranty in case of deviations from the construction plan or when using non-original megawood® articles! • In accordance with the principles of constructive wood protection, the decking boards should be laid lengthwise with a sufficient slope so that water is always directed away from the deck. If these instructions are followed, you will reduce the build-up of organic substances, water stains and waterlogging. • For deck structures with an open gap, a minimum slope of 2% is recommended. For structures...

 Open the catalog to page 2
Construction plan - Decking System with Concrete Kerbstone-3

Article overview CONNECTOR for construction beams 28 x 76 mm | L: 360 cm FASTENING SCREW FOR CB 80 x 60 MM 7,5 x 132 mm, incl. screw bit TX 30 and SDS drill (Ø 6,5 mm) FASTENING SCREW FOR CB 40 x 60 MM 7,5 x 92 mm, incl. screw bit TX 30 and SDS drill (Ø 6,5 mm) RETAINING BAND L: 10 m (on a roll), self-adhesive GROOVE BRIDGE 55 x 8 x 10 mm, for fastening the locking clamp on a construction beam gap LOCKING CLAMP and LOCKING EDGE CLAMP incl. screws (4 x 30 mm) CLIP and EDGE CLIP incl. screws (4 x 30 mm), srew bit TX 20 FASTENING SCREW M8 x 40 MM and M8 x 80 MM (bolt with nut and washer) for rhombus...

 Open the catalog to page 3
Construction plan - Decking System with Concrete Kerbstone-4

Deck covering I CLASSIC Combination board, finely corrugated surface on one side, grooved on the other side, brushed on both sides, 8 mm gap (closed gap with groove strip possible) 21 x 145 mm (Standard) | L: 300/360/420/480/540/600 cm 21 x 242 mm ( Jumbo) | L: 420/480/600 cm Rhombus profil NATURAL BROWN NATURAL BROWN BASALT GREY LAVA BROWN* VARIA CHOCOLATE BLACK SLATE GREY VARIA GREY * Colour Lava Brown only for CLASSIC 21 x 145 mm PREMIUM | PREMIUM PLUS cm oscillating planed top side, brushed underside 8 mm gap (closed gap with groove strip possible) Rhombus profil NATURAL BROWN NATURAL BROWN...

 Open the catalog to page 4
Construction plan - Decking System with Concrete Kerbstone-5

CLASSIC Combination board, finely corrugated surface on one side with colour gradient, grooved on the oder side with colour gradient and medullary ray, 8 mm gap (closed gap with groove strip possible) Colours Rhombus profil VARIA GREY VARIA GREY VARIA CHOCOLATE BLACK VARIA CHOCOLATE BLACK CLASSIC VARIA one-sided, partially grooved and matted surface with colour gradient, 5 mm gap (closed gap possible with gap profile P5) Colours Rhombus profil VARIA CHOCOLATE BLACK VARIA CHOCOLATE BLACK VARIA GREY VARIA GREY DELTA one-sided, matted and textured surface, some colours with colour gradient, 5 mm...

 Open the catalog to page 5
Construction plan - Decking System with Concrete Kerbstone-6

Construction variants I OPEN GAP CLOSED GAP Open gap with KB 40x60 or KB 80x60 possible. Closed gap only possible with KB 80x60. without groove strip / gap profile P5 with groove strip / gap profile P5 Only with elevated construction of at least 161 mm, mandatory minimum 2% longitudinal slope of the boards and mandatory sufficient under- and rearventilation (e.g. use of ventilation grilles, rhombus profile spacing). CONCRETE KERBSTONE Basic construction Construction heights 320 mm Gravel planum with a 2% slope (lengthwise along the board) * Example with 21 mm board Screw (7,5 x 92 mm, pre-drill!)...

 Open the catalog to page 6
Construction plan - Decking System with Concrete Kerbstone-7

MOUNTING ON CONCRETE KERBSTONE SUB-CONSTRUCTION with construction beams 40 x 60 mm and 80 x 60 mm Follow the planning principles during mounting! You can also find your individual construction drawing online in the terrace planner. • Lay concrete kerbstones (1000 x 250 x 50 mm) on a sloping gravel bed. Observe maximum permissible centre distances! • Place rows of two parallel construction beams (CB) as a double substructure at the beginning and end of the deck. The profiled side of the construction beam should face downwards. Centre distance 180 mm. Note the overhang! • Space individual CB rows...

 Open the catalog to page 7
Construction plan - Decking System with Concrete Kerbstone-8

MOUNTING ON CONCRETE KERBSTONE with construction beams 40 x 60 mm and 80 x 60 mm KB 40 x 60 mm

 Open the catalog to page 8
Construction plan - Decking System with Concrete Kerbstone-9

MOUNTING ON CONCRETE KERBSTONE with construction beam 40 x 60 mm only as open deck with construction beam 80 x 60 mm for open and mandatory for closed decks * from construction height 161 mm and with a mandatory longitudinal slope of at least 2%! (see construction variants) ** DYNUM 25 x 293 mm up to max. 650 mm *** Recommendation: measure the distances from the front sides of the sub-construction beams and use them on the long sides of rhombus profiles. Additional mounting notes for detailed procedures and special features in construction, including for locking clamps, clips and DISTANZ FIX,...

 Open the catalog to page 9
Construction plan - Decking System with Concrete Kerbstone-10

Specific features in construction MITRED CONSTRUCTION FOR L-, U-, O- SHAPED DECKS Clip ADDITIONAL ITEMS Mitre profile • Double substructure along the 45° mitre cut. Retaining band • Glue the compress ribbon into the mitre profile on both sides. Locking clamp MITRE PROFILE 21 mm | L: 4 m silver, bronze, anthracite COMPRESS RIBBON expands up to 20 mm L: 13 m (on a roll) CLIP & EDGE CLIP incl. screws (4 x 30 mm), screw bit TX 20 SCREW M6 x 40 MM for fixing short pieces of boards • Insert the board only 10 mm into the mitre profile to ensure expansion. • For oblique or mitre cuts, short pieces of...

 Open the catalog to page 10
Construction plan - Decking System with Concrete Kerbstone-11

Construction variants II EDGE SOLUTION MITRE CUT with rhombus profile as closing strip EDGE SOLUTION BUTT JOINT with rhombus profile as closing strip Tip: For floating construction on roof terraces, use our VARIO FIX substructure system, with up to 10% slope compensation and stepless height adjustment. www.megawood.com/en/variofix Multi-family house ‘Vor dem Wassertor’ in Aschersleben with megawood® facade, DELTA decking and LIMES Augusta privacy screen in Lorbeer You can find this and other reference projects involving our megawood® products at: www.megawood.com/en/referen

 Open the catalog to page 11
Construction plan - Decking System with Concrete Kerbstone-12

Care and Cleaning CARE INSTRUCTIONS After the successful construction of your megawood® deck, you should do a basic cleaning to remove production dust. A slope of at least 2% during construction helps to improve water drainage and minimise deposits. For a well-kept appearance, we recommend a basic cleaning twice a year, or more often if necessary. Temperatures above 15°C are ideal to make cleaning easier. Please proceed as follows: 1. Sweep dry, loose dirt from the decking. 2. Water the entire deck sufficiently and keep it damp for at least 15 minutes. 3. Clean the decking with water and a standard...