1. Catalogs
  2. MAPEI
  3. MAPEPROOF ESM
video corpo

MAPEPROOF ESM

MAPEPROOF ESM

MAPEPROOF ESM

Product catalog summary
Description: Mapeproof ESM is a two-component, solvent-free, pure epoxy resin used as a moisture vapor barrier on cement-based substrates with high residual moisture. It is low viscosity, allowing high penetration into substrate porosity, and is suitable for use in inhabited environments due to its low odor.
Mixing Instructions: Components should be mixed only when ready to apply. The mix ratio is part A: 3 parts by weight to part B: 1 part by weight. Use a low-speed mixer for a uniform mix.
Application Procedure 1 (Power Floated and New Substrates): Abrade the substrate to remove contaminants, vacuum thoroughly, and apply the first coat of Mapeproof ESM. Allow curing for approximately 5 hours before applying a second coat at right angles. Apply a primer within 24 hours of the second coat curing, followed by levelling compounds within 24 hours of primer application.
Application Procedure 2 (Sand/Cement and Existing Substrates): Remove existing materials and contaminants. Fill cracks with Eporip and apply a levelling compound if needed. Follow the same coating procedure as for new substrates.
Technical Data: The product is transparent yellow, with a density of 1.12 g/m3 for part A and 1.00 g/m3 for part B. It is classified as irritant and corrosive. The mix has a density of 1.1 g/m3 and a viscosity of 300 mPa•s. Application temperature ranges from +10°C to +30°C, with varying workability and setting times depending on temperature.
Final Performances: Mapeproof ESM offers excellent resistance to abrasion, moisture, and temperature, with adhesion to concrete greater than 3 N/mm2.
Underfloor Heating: Ensure the screed cures for 28 days. Commission the heating system before installation, gradually increasing temperature. Apply two coats of Mapeproof ESM for RH levels up to 97%.
Cleaning: Use ethyl alcohol to clean tools and clothing while the product is fresh.
Coverage and Packaging: Coverage is approximately 5 m2 per 1 kg unit. Packaging options include 1 kg and 6 kg units.
Safety Instructions: Part A is an irritant, and part B is corrosive. Both parts are harmful to aquatic organisms. Use protective gear and refer to the Safety Data Sheet for detailed safety information.
Disclaimer: Users must ensure the product is suitable for their application. No warranty is provided beyond meeting written specifications. Consult the latest product data and safety sheets before use.
See more

Catalog excerpts

MAPEPROOF ESM-1

Two-component, Solvent Free, Damp-Proof Surface, Membrane DESCRIPTION A two-component, solvent free, pure epoxy resin, used as a moisture vapour barrier on cement-based substrates containing high residual moisture. It is a low viscosity product with a high penetration capacity in the porosity of the substrate. Because of the absence of solvents, and very low odour it can be used in inhabitated environments (e.g. hospitals, schools, offices, etc). Mixing The components should not be mixed until the application is ready to start, and should be applied as soon as mixing is completed. The two components are supplied in pre-measured ratios: part A: 3 parts by weight; part B: 1 part by weight. • Apply the first coat of Mapeproof ESM ensuring it is well worked into the substrate and that complete coverage of the area is achieved at a maximum rate of 30 m2 per 6 kg unit (depends on the porosity of the sub-floor) and allow to cure (approx 5 hours). • Apply the second coat of Mapeproof ESM at right angles to the first coat, again ensuring complete coverage. • When the second coat has cured, a coat of Mapeprim SP or Eco Prim T primer should then be applied within maximum 24 hours (primer drying times vary with ambient conditions i.e. temperature and humidity). • The levelling compounds should be applied within 24 hours of the primer application. Mix the two components completely and accurately with a low speed mixer until a uniform mix is obtained. Application Procedure 2 Sand/Cement and Existing Substrates: • All existing materials, adhesives, laitance and contamination should be removed prior to preparation work commencing. Application Procedure 1 Power Floated and New Substrates: • The substrate should be abraded by mechanical means to remove any curing agents or contamination, to assist penetration and adhesion of the membrane. • Any cracks in the substrate should be filled with Eporip. • The area should then be thoroughly vacuumed to remove all dust and debris. • Where the substrate has a textured or profiled finish, Latexplan levelling compound should be applied to provide a level surface for the membrane to be applied onto.

 Open the catalog to page 1
MAPEPROOF ESM-3

• Apply the first coat of Mapeproof ESM ensuring it is well worked into the substrate and that complete coverage of the area is achieved at a maximum rate of 30 m2 per 6 kg unit (depends on the porosity of the subfloor) and allow to cure (approx 5 hours). • Apply the second coat of Mapeproof ESM at right angles to the first coat, again ensuring complete coverage. • When the second coat has cured, a coat of Mapeprim SP or Eco Prim T primer should then be applied within maximum 24 hours. (primer drying times vary with ambient conditions i.e. temperature and humidity). • The levelling compound should...

 Open the catalog to page 3
MAPEPROOF ESM-4

Any reproduction of texts, photos and illustrations published here is prohibited and subject to prosecution

 Open the catalog to page 4

All MAPEI catalogs and technical brochures

  1. KERAQUICK S1

    4  Pages

  2. PLANITOP 100

    4  Pages

  3. keracolorff

    4  Pages

  4. ISOLASTIC

    4  Pages

  5. KERAPOXY

    6  Pages

  6. mapebandpe120

    2  Pages

  7. PRIMER G

    4  Pages

  8. KERABOND T

    4  Pages

  9. ADESILEX P4

    4  Pages

  10. MAPESIL LM

    4  Pages

  11. MAPECURE SRA

    4  Pages

  12. LAMPOCEM

    4  Pages

  13. LIGNOBOND

    4  Pages

  14. FIBERPLAN

    4  Pages

  15. LATEX PLUS

    4  Pages

  16. NIVORAPID

    4  Pages

  17. TOPCEM

    4  Pages

  18. SILWOOD

    4  Pages

  19. TRIBLOCK P

    4  Pages

  20. ULTRACOAT OIL

    2  Pages

  21. MAPEPLAST LA

    4  Pages

  22. MAPETHERM AR1

    4  Pages

  23. MAPETHERM NET

    2  Pages

  24. FastTrack

    24  Pages

  25. Kerapoxy CQ

    2  Pages

  26. PURTOP LINE

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.