Planning reliability for operation and costs - 1

mail environmental Systems Planning reliability for opration and costs Municipal wastewater treatment plants - Mail-System | !

Open the catalog to page 1
Planning reliability for operation and costs - 2

Mail SBR plant for 750 PE, onsite wastewater treatment plant, Mellenthin Starting situation In Mellenthin on the Baltic Sea island of Usedom, a wastewater treatment plant with a fixed bed was until recently in use, which in a multiple chamber septic tank was unable, or insufficiently able, to treat the wastewater produced. The aim was to put the old wastewater clarification plant out of use and to connect households to a modem wastewater treatment System. In winter, the average load is 450 PE; during the summer months, however, the new wastewater treatment plant at Mellenthin would have to...

Open the catalog to page 2
Planning reliability for operation and costs - 3

R Ruhrverband Mail SBR plant for 300 PE, municipal wastewater treatment plant at Winkeln Starting situation The community of Schalksmhle intends to construct a wastewater treatment plant for its Winkeln district with a total capacity rating of 300 PE. In the process, the community was drained entirely by a separate sewer-age System. Following commissioning and trial opration of the plant, Ruhrverband ZN Hagen took charge of technical op멩rations. To keep cost on site to a minimum, the plant is equipped with appropriate remote control Systems. Sol ut ion As part of the draft design and...

Open the catalog to page 3
Planning reliability for operation and costs - 4

Mail SBR plant for 200 PE, AGROFARM country butcher, Knau Starting situation The agricultural company AGROFARM Knau e.G. manages a useful area of 1,800 hectares and employs 91 people. The company planned a wastewater treatment plant to handle the wastewater produced by its country butch-er's shop. Wastewater from meat proͭduction oprations ditfers significantly in content from municipal wastewater; usually, it is characterised by signifi-cant levels of COD, BOD5, fats and solids. Furthermore, the large amount of wastewater must in most cases also be restricted before being fed into the...

Open the catalog to page 4
Planning reliability for operation and costs - 5

WAZV Mail SBR system for 600 PE, wastewater treatment plant for municipality of Bechstedt-Wagd Sterling situation The municipality of Bechstedt-Wagd, comprising the districts of Altdorf and Neudorf and an area of weekend rsidentiel sites, intended in 2005 to con-struct a wastewater treatment plant for ail 3 of th魨se areas. In this process, Neudorf and the weekend sites are to have separate sewerage Systems while Altdorf is to be drained by a combined sewerage system. Connecting thse up to the wastewater treatment plant will take place in two construction phases. Sol ut ion The assignment...

Open the catalog to page 5
Planning reliability for operation and costs - 6

bodclenlcind Mail trickling filter System for 155 PE, Onsite wastewater treatment plant, Brnkendorf Starting situation The community of Brnkendorf is located directly on the geographical border between Mecklenburg and Western-Pomerania, only a few kilo鹭mtres from the beaches of the Baltic Sea. An onsite wastewater treatment plant fortreating domestic wastewater with a capacity of 155 PE was planned for construction in 2006. Solution An above-ground trickling filter System was chosen for the wastewater treatment. This reliable, energy-saving process allows stable rduction of C-carriers (COD...

Open the catalog to page 6
Planning reliability for operation and costs - 7

Mail trickling filter System for 150 PE, communal wastewater treatment plant, Epauvillers (CH) Sterling situation The district authority had to install a wastewater treatment plant. Since the existing canalisation was partly built as a combined System, the flow to the plant had to be slowed down, whereby the plant design also had to enable partial mechanical cleaning of the rainwater. Screen System in operating building DN 4000 storage basin Preliminary treatment via a Dortmund tank DN1500 feed-PW DN 4000 trickling filter Transfer shaft DN 3000 post-treatment Sol ut ion Thse conditions have...

Open the catalog to page 7
Planning reliability for operation and costs - 8

Municipal wastewater treatment plants - further rfrences Mail sets quality standards. And h as been doing so for d驩cades. With its extensive range of environ-mental and climate protection prod-ucts, the Mail group has become one of the most important specialist providers over the last five dcades, offering process-engineering expertise in the fields of sparation technology, rainwater management, wastewater treatment, new 驩nergies and pump and plant engineering. With continuous dialogue and expertise transfer, we have combined conͭcrte technology and environmental processes to create...

Open the catalog to page 8