video corpo

Green Terramesh
2Pages

{{requestButtons}}

Catalog excerpts

Green Terramesh - 1

A1 MOTORWAY - BOLOGNA TO FLORENCE SECTION LOTTO 12, VARIANTE DI VALICO SOIL REINFORCEMENT - TUNNEL PORTALS Product: Green Terramesh ® Problem The A1 Autostrada, known as Autostrada del Sole (Motorway of the sun), runs for 750km from Milan to Naples, via Bologna, Florence and Rome. Not only is it the longest motorway in Italy, it is considered to be the key corridor in the country’s highway network. To improve safety, reduce congestion and consequent environmental pollution, a new section of the A1 was proposed in 2001 through the Apennines between Bologna and Florence, known as the Variante Di Valico. This 58km ‘New A1’ would feature 23 viaducts and 22 tunnels. Towards the southern end of this extension was ‘Lot 12’ between Poggiolino to Aglio. The 4.5km route was characterised by complex geological and topographical terrain and included 3 viaducts and 5 tunnels. Some of the tunnel portals emerged into complex Apennine clay formations, exacerbated by the presence of active or dormant landslides. The tunnel portals had to be carefully designed and constructed to stabilise, retain and consolidate the ground and required monitoring inside and outside the tunnels. Assembling Green Terramesh unit The Buttoli tunnel typified these ground conditions. Buttoni features two parallel tunnels of 490m (North) and 546m (South) with an excavated area of 190m2. Each carriageway has a width of 11.95m per tube, thereby achieving three lanes (two running and 1 emergency) of 3.75 m wide each. Lot 12, Variante di Valico required considerable technical and organisational commitment to stabilise and retain the portals, maintaining the land-value and cultural area of Mugello. Maccaferri proposed the use of Green Terramesh® soil reinforcement at the mouth of the tunnel. This system is designed to vegetate, reducing the visual impact of the structure, and enabling it to blend back into nature. Green Terramesh® forms flexible soil reinforcement structures that can accommodate differential settlement without compromising the structure, ideal under these complex geological conditions. Placing backfill in zone between two tunnel portals Green Terramesh® consists of pre-fabricated soil reinforcement units of steel double twisted wire mesh, lined with an erosion control blanket and the face stiffened with a welded wire mesh panel. Steel struts hold the face at the correct angle during installation. Client: AUTOSTRADE PER ITALIA Main contractor: ATI BALDASSINI TOGNOZZI PONTELLO Products used: GREEN TERRAMESH, GABIONS Date of construction 2008—2013 Placing and compacting backfill to Gre

Open the catalog to page 1
Green Terramesh - 2

Detail of Green Terramesh® fascia as vegetation starts Schematic plan views of reinforced soil between portals Green Terramesh® - Vegetation establishing As all components are factory fitted, Green Terramesh® is more rapid to install than other reinforced soil systems. No external shuttering or formwork is needed. The unit is erected, positioned and structural backfill is placed upon the integral geogrid tails, before compaction. Good quality topsoil is placed immediately behind the front face to enable vegetation of the system. Green Terramesh® - Vegetation establishing To ensure a long...

Open the catalog to page 2

All Maccaferri catalogs and technical brochures

  1. Paralink®

    2 Pages

  2. MacGrid®

    2 Pages

  3. MacGuide

    32 Pages