Project Overview: The document details the construction of a new section of the A1 Motorway, known as Variante Di Valico, between Bologna and Florence. This section includes 23 viaducts and 22 tunnels, with a focus on Lot 12, which spans 4.5 km and includes complex geological conditions.
Problem Statement: The construction faced challenges due to the complex Apennine clay formations and the presence of active or dormant landslides. Stabilizing the tunnel portals was critical to ensure safety and maintain the cultural and land value of the Mugello area.
Solution: Maccaferri proposed the use of Green Terramesh® for soil reinforcement at the tunnel portals. This system is designed to integrate with the natural environment by supporting vegetation growth, thus reducing visual impact. It consists of pre-fabricated units made of steel double twisted wire mesh, lined with an erosion control blanket, and reinforced with a welded wire mesh panel.
Implementation: The Green Terramesh® system was chosen for its ability to accommodate differential settlement and its rapid installation process, which does not require external shuttering or formwork. The system includes heavily galvanized and polymer-coated steel wire mesh for durability.
Outcome: The new section of the A1 Motorway was successfully completed and opened in December 2015 by Italian Prime Minister Matteo Renzi. The use of Green Terramesh® contributed to the stabilization and aesthetic integration of the tunnel portals.
See more

Catalog excerpts

Green Terramesh-1

A1 MOTORWAY - BOLOGNA TO FLORENCE SECTION LOTTO 12, VARIANTE DI VALICO SOIL REINFORCEMENT - TUNNEL PORTALS Product: Green Terramesh ® Problem The A1 Autostrada, known as Autostrada del Sole (Motorway of the sun), runs for 750km from Milan to Naples, via Bologna, Florence and Rome. Not only is it the longest motorway in Italy, it is considered to be the key corridor in the country’s highway network. To improve safety, reduce congestion and consequent environmental pollution, a new section of the A1 was proposed in 2001 through the Apennines between Bologna and Florence, known as the Variante Di Valico. This 58km ‘New A1’ would feature 23 viaducts and 22 tunnels. Towards the southern end of this extension was ‘Lot 12’ between Poggiolino to Aglio. The 4.5km route was characterised by complex geological and topographical terrain and included 3 viaducts and 5 tunnels. Some of the tunnel portals emerged into complex Apennine clay formations, exacerbated by the presence of active or dormant landslides. The tunnel portals had to be carefully designed and constructed to stabilise, retain and consolidate the ground and required monitoring inside and outside the tunnels. Assembling Green Terramesh unit The Buttoli tunnel typified these ground conditions. Buttoni features two parallel tunnels of 490m (North) and 546m (South) with an excavated area of 190m2. Each carriageway has a width of 11.95m per tube, thereby achieving three lanes (two running and 1 emergency) of 3.75 m wide each. Lot 12, Variante di Valico required considerable technical and organisational commitment to stabilise and retain the portals, maintaining the land-value and cultural area of Mugello. Maccaferri proposed the use of Green Terramesh® soil reinforcement at the mouth of the tunnel. This system is designed to vegetate, reducing the visual impact of the structure, and enabling it to blend back into nature. Green Terramesh® forms flexible soil reinforcement structures that can accommodate differential settlement without compromising the structure, ideal under these complex geological conditions. Placing backfill in zone between two tunnel portals Green Terramesh® consists of pre-fabricated soil reinforcement units of steel double twisted wire mesh, lined with an erosion control blanket and the face stiffened with a welded wire mesh panel. Steel struts hold the face at the correct angle during installation. Client: AUTOSTRADE PER ITALIA Main contractor: ATI BALDASSINI TOGNOZZI PONTELLO Products used: GREEN TERRAMESH, GABIONS Date of construction 2008—2013 Placing and compacting backfill to Gre

 Open the catalog to page 1
Green Terramesh-2

Detail of Green Terramesh® fascia as vegetation starts Schematic plan views of reinforced soil between portals Green Terramesh® - Vegetation establishing As all components are factory fitted, Green Terramesh® is more rapid to install than other reinforced soil systems. No external shuttering or formwork is needed. The unit is erected, positioned and structural backfill is placed upon the integral geogrid tails, before compaction. Good quality topsoil is placed immediately behind the front face to enable vegetation of the system. Green Terramesh® - Vegetation establishing To ensure a long design...

 Open the catalog to page 2
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.