Project Overview
The document details a case history of pipeline protection for a 24” gas pipeline in Kwale, Nigeria. The pipeline, crucial for delivering natural gas from the Kwale Gas Plant to the OB/OB Gas Treatment Plant, was damaged due to severe flooding in 2012.

Problem Statement
The 48 Km pipeline was damaged during significant flooding, causing interruptions in gas supply. Investigations revealed erosion and topographic changes in the riverbed as the primary causes of the damage.

Intervention Schedule
Urgent repairs began in November 2012, focusing on locating the damage, confirming the HDD line's damage point, and identifying a permanent repair solution.

Solution
Maccaferri's Articulated Concrete Block Mattresses (ACBM) were chosen for their flexibility and modularity, allowing rapid installation and stabilization of the pipeline. This solution restored gas distribution to power facilities across Nigeria.

Implementation
Maccaferri supplied 130 ACBM mattresses and a manual lifting frame for installation. The project was completed by Nigerian Agip Oil Co. (NAOC) and FENOG Nigeria Ltd.

Conclusion
The use of ACBM mattresses effectively repaired the pipeline and prevented future scour effects, ensuring the continued functionality of the gas supply system.
See more

Catalog excerpts

GAS PIPELINE PROTECTION-1

24” GAS PIPELINE PROTECTION KWALE, NIGERIA Pipeline Protection Product: Articulated Concrete Block Mattresses (ACBM) Problem The Kwale-OB/OB gas pipeline is a 48 Km, 24” diameter pipeline. It is the only means of delivering natural gas from the Kwale Gas Plant to the OB/OB Gas Treatment Plant which in turn delivers Gas to the Bonny LNG. Installation of the pipeline was carried out in 2004. Towards the end of September 2012, Nigeria experienced some of its worst flooding in 50 years and it was over this period that the pipeline within the river crossing near Kwale was damaged and the gas supply to the OB/OB gas treatment plant was interrupted in October 2012. A detailed investigation was carried out and reported findings revealed extensively erosion and several topographic changes to the riverbed. This, coupled with the high flood water current was determined as the cause of the pipe breakage. Intervention schedule Due to the strategic importance of the pipeline, an urgent repair was carried out commencing in November 2012. The objectives were; • To locate and ascertain the extent of the damaged 24” gas pipeline • To confirm the point of damage of the HDD (Horizontal Directional Drilling) line and the landed section • Identify the optimum solution for the repair of the gas pipeline while undertaking a HDD installation method as the permanent solution Solution From a number of proposals, including that of Maccaferri, NAOC and FENOG identified that ACBM mattresses would be the best suitable solution to restore functionality of the pipeline. ACBM mattresses were used to repair and prevent future scour effects and to ballast and stabilize the new pipeline. The high flexibility and modularity of the ACBM, enabled the rapid installation of the pipeline protection solution and the restoration of distribution of gas to power generation facilities throughout the country. Client: NIGERIAN AGIP OIL Co. (NAOC) Main contractor: ^ FENOG NIGERIA LTD Products used: ACBM mattresses Date of construction April 2013 Project location \ - / u™*. feS*. 0w*yugij* un,h,v ■’ ~ 'u*~' CVJ, Port Harcourt-.'^\tt*r tkpo *1 ____ . ■ •Abuioma ' ,, . Boguma t ACBM mattresses In stock Maccaferri supplied: • 130 No. ACBM mattresses 5.26 x 2.26 x 0.20 m. • 1 ACBM manual lifting frame for mattress 2015 Maccaferri. All rights reserved. Maccaferri will enforce Copyright. Officine Maccaferri S.p.A. Global Headquarters Via JF Kennedy 10, 40069 Zola Predosa (BO) - Italy T: (+39) 051 6436000 F: (+39) 051 643 6201 E: [email protected] www.maccaferri.com Maccaferri operates under strict quality assurance and management procedures. Please visit the website of your local subsidiary for details of their Certifications.