Catalog excerpts
MONUMENT M AT H I E U G I R A R D & G A U T H I E R P O U I L L A R T Shelving system INDEX introduction specifications packing list assembly instructions assembly instructions assembly instructions assembly instructions securing La Chance 4, rue de la Pierre Levée 75011 Paris, France | +33 (0) 9 72 31 12 77 | info@lachance.paris | www.lachance.paris
Open the catalog to page 1MONUMENT Monument is a collection of shelving units that combines wood and marble. This piece was imagined by Mathieu Girard and Gauthier Pouillart of Atelier Cocorico. The visual strength and stability of Monument relies on an ingenious construction system that does not require any tool. The result is a brutalist, material centered piece with a strong sculptural presence. The two imposing “cross” columns that constitute the superstructure are the visual signature of the shelf, but also present and enhance beautiful objects or books. The Monument system comes in a large variety of...
Open the catalog to page 2MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART MATERIALS & FINISHES Black Marquina marble Natural solid ash Pele de Tigre marble Natural solid ash Pele de Tigre marble Indian green marble Travertine Indian green marble Black stained solid ash Travertine Natural solid ash Black Marquina marble Pele de Tigre marble Black stained solid ash Indian green marble Natural solid ash Black stained solid ash Black Marquina marble Black stained solid ash Travertine Black stained solid ash TECHNICAL DRAWINGS PACKAGING INFORMATION COMPONENTS 01 Boards H shapes Half-H shapes 02 Boards H shapes Half-H...
Open the catalog to page 3MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART 1 batch of 4 H 1 batch of 4 half-H 1 batch of 2 boards 1 box with: - adhesive felt - 2 steel L-shapes - 4 screws 1 batch of 4 H 1 batch of 4 half-H 1 batch of 2 boards 1 box with: - adhesive felt - 2 steel L-shapes - 4 screws MORE INFORMATION 2 batches of 4 H 1 batch of 4 half-H 2 batches of 2 boards 1 box with: - adhesive felt - 2 steel L-shapes - 4 screws 2 batches of 4 H 1 batch of 4 half-H 2 batches of 2 boards 1 box with: - adhesive felt - 2 steel L-shapes - 4 screws The marbre is a fragile material. Be careful not hit the pieces. Do not...
Open the catalog to page 4A S S E M B LY INSTRUCTIONS WOOD version
Open the catalog to page 5MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART A S S E M B LY INSTRUCTIONS 01 - 02 Wood version Tools required: • a mallet with a soft head please DO NOT use a hammer Stick the felt strips on the lower edges of the two first half-H and H boards. Insert the dowels in the half-H boards holes. This step might require a mallet to insert them until they reach the bottom; please handle it with caution. Slide the H boards along their cuttings. Slide the first horizontal board.
Open the catalog to page 6MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART A S S E M B LY INSTRUCTIONS 01 - 02 Wood version Slide the second pair of vertical H boards. Slide the last pair of half-H boards. Insert the dowels and slide the last horizontal board.
Open the catalog to page 7A S S E M B LY INSTRUCTIONS WOOD version
Open the catalog to page 8MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART A S S E M B LY INSTRUCTIONS 03 - 04 Wood version Tools required: • a mallet with a soft head please DO NOT use a hammer Stick the felt strips on the lower edges of the two first half-H and H boards. Insert the dowels in the half-H boards holes. This step might require a mallet to insert them until they reach the bottom; please handle it with caution. Slide the H boards along their cuttings. Slide the first horizontal board.
Open the catalog to page 9MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART A S S E M B LY INSTRUCTIONS 03 - 04 Wood version Slide the second pair of vertical H boards. Insert the dowels and slide the second horizontal board. Slide the third pair of vertical H boards. Insert the dowels and slide the third horizontal board.
Open the catalog to page 10MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART A S S E M B LY INSTRUCTIONS 03 - 04 Wood version Slide the last pair of vertical H boards. Insert the dowels and slide the last horizontal board. Slide the last pair of half-H boards.
Open the catalog to page 11A S S E M B LY INSTRUCTIONS MARBLE version
Open the catalog to page 12MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART A S S E M B LY INSTRUCTIONS 01 - 02 Marble version Stick the felt strips on the lower edges of the two first half-H and H boards. Slide the first half-H and H boards along their cuttings. Slide the H boards along their cuttings. Slide the first horizontal board.
Open the catalog to page 13MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART A S S E M B LY INSTRUCTIONS 01 - 02 Marble version Slide the second pair of vertical H boards. Slide the last pair of half-H boards. Slide the last horizontal board.
Open the catalog to page 14A S S E M B LY INSTRUCTIONS MARBLE version
Open the catalog to page 15MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART A S S E M B LY INSTRUCTIONS 03 - 04 Marble version Stick the felt strips on the lower edges of the two first half-H and H boards. Slide the first half-H and H boards along their cuttings. Slide the H boards along their cuttings. Slide the first horizontal board.
Open the catalog to page 16MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART A S S E M B LY INSTRUCTIONS 03 - 04 Marble version Slide the second pair of vertical H boards. Slide the second horizontal board. Slide the third pair of vertical H boards. Slide the third horizontal board.
Open the catalog to page 17MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART A S S E M B LY INSTRUCTIONS 03 - 04 Marble version Slide the last pair of vertical H boards. Slide the last horizontal board. Slide the last pair of half-H boards.
Open the catalog to page 18MONUMENT | MATHIEU GIRARD & GAUTHIER POUILLART SECURING For the high versions of Monument, we recommend to place it next to a wall and secure it with the brackets included to avoid tilting. Slide the brackets between the wall and the last horizontal board. There is no need to drill in the board as the top parts of the brackets are locking the shelf. Screw the brackets to the wall and align Monument so there is no space between the parts.
Open the catalog to page 19C O N TA C T Do not hesitate to contact us if you have any question about the product, its assembly instructions and maintenance. La Chance info@lachance.paris +33 (0) 9 72 31 12 74
Open the catalog to page 20All LA CHANCE catalogs and technical brochures
-
La chance 2015
35 Pages
-
Catalogue Lachance
2 Pages