Procedure of Vault Panel Installation Bases of vault panel are mounted on the floor. Vault panels are assembled in order starting from the corner. Vault door is installed. All wall panel assemble work is finished. Construction work is complete when the interior and exterior walls are finished.
Open the catalog to page 2Standards of the Federation of Japan Safe/Furniture Cooperatives (FJSF) Grade of Burglar-Resistance Descriptions Torch and Tool endurance test (for vault equipment) Tool endurance test (Vault equipment is excluded.) Attack time Heating time Vault equipment (for paper) Gallery vault equipment Inside the chamber: Less than 177℃ Inside the chamber: Less than 80℃ P: Paper, C: Cultural properties, H: Hour TR: Torch, TL: Tool, V: Vault Burglar-resistant test method A destructive test is performed for the specified time to open an entry hole in the test specimen. Vault panel attack test Fire-resistant...
Open the catalog to page 3Super Modular Vault Panels Fire resistance Basic Panel Dimension
Open the catalog to page 4Modular Vault Panels MV-120K/Sc Burglar resistance Burglar resistance Fire resistance Fire resistance Basic Panel Dimension Basic Panel Dimension
Open the catalog to page 5Modular Vault Panels MV-8025 Burglar resistance Burglar resistance Fire resistance Fire resistance Basic Panel Dimension Basic Panel Dimension
Open the catalog to page 6Record Vault Panels PV-60c Burglar resistance Burglar resistance Fire resistance Fire resistance Basic Panel Dimension Basic Panel Dimension
Open the catalog to page 7Performance Table of Vault Panels Fire resistance * Burglar resistance * * Fire resistance and burglar resistance are certified by the Federation of Japan Safe Furniture Cooperatives. (MV-80 is not applicable.)
Open the catalog to page 82 Pages
3 Pages
2 Pages
2 Pages
2 Pages
3 Pages
3 Pages
2 Pages
3 Pages
3 Pages
3 Pages
3 Pages
30 Pages
2 Pages
2 Pages
2 Pages
2 Pages