SPO Systems Completion Solution
2Pages

{{requestButtons}}

Catalog excerpts

SPO Systems Completion Solution - 1

SOLUTION SHEET KEY BENEFITS: • Reuse of the engineering design basis to minimize the effort of gathering and maintaining data and documentation. • Automated allocation of checklists to eliminate manual allocation effort. • Compilation of electronic completions dossiers. • Out-of-the-box set of checklists or customers’ own lists can be configured. • Offline completion of checklists on tablet PCs. • Graphical reporting of completion and punch list status on intelligent P&IDs and 3D models. • Library of standard status reports. • Reuse of checklists for shutdowns, turnarounds, and outages. SMARTPLANT® ENTERPRISE FOR OWNER OPERATORS SYSTEMS COMPLETION SOLUTION Systems completion covers the process of taking a project from construction closeout to operations. It is arguably the most critical and complex phase of the facility life cycle. Every component of the facility must be checked to validate that it is built and installed correctly and functioning properly. Systems and equipment are tested to ensure that they perform as expected. Any defects must be recorded, repaired, and rechecked, and the process is tracked to ensure nothing is overlooked. Fluids and power are introduced to bring the facility online. Startup is known to be one of the riskiest aspects of operations and proper precautions must be followed. The situation is complicated by the fact that construction is still ongoing while the other activities are taking place. Since there are multiple system dependencies, any slippage in schedule will be magnified. Throughout this entire process, there are many people involved from multiple companies. Responsibility is handed off at various points along the way. Managing systems completion well can reduce risk, shorten time to market, and improve time in production. Proper planning, up-to-date statuses, accurate information, and well-coordinated activities are essential to delivering the project on schedule. Intergraph® SmartPlant® Enterprise for Owner Operators (SPO) Systems Completion (SC) Solution provides the tools you need to help you be successful on your next project. SPO SC leverages the engineering design basis in the SPO Core Solution that is built-up during the evolution of the plant design. This ensures an updated, complete, and accurate basis for completions. Mechanical completions and static commissioning check sheets and certificate templates are included to help you get started. When the SPO SC Solution is used in conjunction with other SPO solutions, it provides a seamless environment with access to all of the information needed to complete the work, without loading data or scrambling to find current, complete, and accurate information. SPO SC covers the complete systems completion workflow: MECHANICAL COMPLETION – SPO SC offers a tool to create and manage check sheets for the items to be inspected. A rules-driven process creates the proper types of check sheets for each item. The check sheets are intelligent – data captured during inspections is automatically updated in the SPO SC database. Similarly, the database is updated automatically to reflect the inspection status. Any defects that are noted result in a punch list item so that the defect can be tracked to resolution. Walkdown

Open the catalog to page 1
SPO Systems Completion Solution - 2

SPO SC creates certificates to document the handover from one PRE-STARTUP SAFETY REVIEW (PSSR) AND OPERATIONAL READINESS – This process is essential to group to another. Optionally, you can seamlessly integrate the ensuring that all elements for a safe startup are in place. A team SPO Project Execution Solution to track changes, interface items, comprised of engineering, operations, safety, and maintenance site queries, and non-conformances. This provides a complete uses a process of checklists and walkdowns for verification. With history of not only the design but also the decisions that...

Open the catalog to page 2

All Intergraph catalogs and technical brochures

  1. GeoMedia®

    14 Pages

  2. PV Elite

    2 Pages

  3. CAESAR II

    2 Pages