IDEAWOOD INSTALLATION GUIDE

IDEAWOOD INSTALLATION GUIDE
1 / 17 PagesView full catalog

IDEAWOOD INSTALLATION GUIDE

Product catalog summary
Installation Guide Overview:
This document provides comprehensive instructions for installing Ideawood panel systems, including Idealux LT, LR, FL, Slats, and D-Wood panels. It details the necessary hardware, step-by-step assembly procedures, and specific recommendations for optimal installation.

1. Idealux LT Panels:
Wall Installation: Secure metal angle brackets with screws, place panels on brackets, and attach using profiled battens. Maintain shadow gaps of at least 20 mm and gaps between head modules of 5-10 mm.
Ceiling Installation: Use primary profiles and cross bars with threaded rods and nuts for support, following similar steps as wall installation.

2. Idealux LR Panels:
Wall Installation: Attach fixing clips to the wall, press panels onto clips, and repeat for each panel. Ensure staggered alignment with shadow gaps of 20 mm.
Ceiling Installation: Use adjustable anchors and follow similar steps as wall installation.

3. Idealux FL Panels:
Wall and Ceiling Installation: Position angle bars, layout fastening elements, and attach panels to the metal structure. Ensure staggered rows with shadow gaps of 20 mm.

4. Slats Panels:
Wall Installation: Attach Omega metal profiles, secure start/end pieces, and couple panels using fixing cleats. Use acoustic black fleece between panels.
Ceiling Installation: Similar to wall installation, with additional perimeter trims and T-Grid system.

5. D-Wood Panels:
Wall and Ceiling Installation: Similar to Slats panels, using Omega profiles and fixing cleats. Panels can be installed without gaps.

Hardware Requirements:
Specific hardware such as angle bars, fixing clips, threaded rods, and acoustic fleece are required for each panel type. Detailed lists are provided for each installation scenario.

Recommendations:
Staggered alignment is recommended for all installations, with specified shadow gaps and head module gaps to ensure proper fit and aesthetic appearance.

General Overview:
This document provides guidelines for the installation and handling of acoustic solutions by Ideatec Advanced Acoustic Solutions, including specifications, environmental conditions, installation instructions, and maintenance recommendations.

Specifications:
Materials such as acoustic fleece and threaded rods are listed, with quantities varying based on project size and arrangement. The size of threaded rods depends on the desired hanging distance.

General Properties:
Wood products may have natural variations in color, grain, and structure. Fire-resistant coatings and varnishes are used, and the acoustic black fleece may show minor ripples under certain lighting conditions.

Certificates:
Ideatec is certified with CE, FSC, PEFC, ISO 9001, and ISO 14001. Availability of certified wood is subject to stock.

Delivery:
Products are shipped in protective boxes. Care must be taken when opening boxes to avoid damage. Pallets should be handled with a forklift and not stacked with heavy materials.

Environmental Conditions:
Materials should acclimate on-site for 24 to 72 hours before installation, with temperature and humidity maintained between 18-25°C and 40-60% respectively. Products should not be placed directly on the floor or exposed to UV light.

Installation:
A minimum 5mm expansion joint is recommended every 5-6 meters, with additional joints for longer rooms. Space should be left for lighting and other installations.

Handling:
Gloves should be used to prevent damage. Metal components should be handled carefully to avoid damaging the material.

Maintenance:
Cleaning should be done with a soft, damp cloth and possibly a neutral cleaning product, avoiding visible areas for testing.

Contact Information:
Ideatec Advanced Acoustic Solutions can be contacted for further inquiries or comments regarding their products.
See more

Catalog excerpts

IDEAWOOD INSTALLATION GUIDE-1

ideawood INSTALLATION GUIDE

 Open the catalog to page 1
IDEAWOOD INSTALLATION GUIDE-2

Wall: Required items: (*)(**) Idealux LT Panel Montage: Metal angle bracket 40.40 Hardware items required for installation Information: Steps to assemble IDEALUX -LT panels: 1: Anchoring of metal angle bracket to the desired surface by means of screws. (4 per panel ). It is important to rethink the points of each module prior to fixing. 2: Place the panel on the angle brackets. 3: Screw on the upper side of the profiled batten and anchor it to the angle bracket. 4: Fit the next module and screw as described in point 3. (*) Configuration of standard modules (1980x600mm) Other formats on request....

 Open the catalog to page 2
IDEAWOOD INSTALLATION GUIDE-3

Wall: Required items: Montage: Fixing clip Assembly hardware items required for installation Information: Steps to assemble IDEALUX LR panels: 1: Attach the fixing clips to the wall surface with screws. (6 per panel). 2: Apply pressure on the panel to fix the clips. 3: Repeat the same steps with each panel connecting them until installation is finished. (*) 6 fixing clips for 1800mm standard modules. For other sizes, please ask. USAGE RECOMMENDATIONS: Staggered alignment is recommended. Gap between head’s panels should be 5-10 mm (min). Shadowgaps should be 20 mm (min). Pol. Ind. Santa Fe // Comuna...

 Open the catalog to page 3
IDEAWOOD INSTALLATION GUIDE-4

Wall: Required items: (*)(**) Idealux LT Panel Hanging piece (***)5 Hardware items required for installation Information: Steps to assemble IDEALUX- T panels: 1: Position and level the angle bars on the perimeter sides of the surface to be covered. 2: Layout of fastening elements (threaded rods, "T" profiles and hanging pieces). 3: Attach the threaded rod to the hanging pi ece by means of a nut, then move it through the "T" profile until it reaches the previously determined position. 4: Fit the cross bar over the "T" profile structure. 5: Leave the panels evenly on the metal structure until installation...

 Open the catalog to page 4
IDEAWOOD INSTALLATION GUIDE-5

Ceiling: Required items: Idealux LR panel Mounting system: Ceiling support Steps to assemble IDEALUX LR: 1: Lay out flixing points on the surface depending on the Idealux LT 2: Attach the flixing piece with crews to the ceiling. Afterwards, place the bar guide bracket on the ceiling support to the desired height and fix both parts with the pin placing it thorugh the common hole to the clamping piece. 3: Lay down the panel on the guide bar bracket. 4: Repeat the steps with the remaining panels until finishing installation. Once panel is supported by the four hangers, move it towards the next one in...

 Open the catalog to page 5
IDEAWOOD INSTALLATION GUIDE-6

Ceiling: Required items: (*)(**) Idealux FL Panel Mounting system: Threaded Rod + Nut Hanging piece Hardware items required for installation Information: Steps to assemble Idealux FL panels: 1: Position and level the angle bars on perimeter sides of the surface to be covered. 2: Layout of fastening elements (threaded rods, "T" profiles and hanging pieces). 3: Attach the threaded rod to the hanging piece by means of a nut, then move it through the "T" profile until it reaches the previously determined position. 4: Fit the cross bar over the "T" profile structure. 5: Leave the panels evenly on the...

 Open the catalog to page 6
IDEAWOOD INSTALLATION GUIDE-7

Wall: Required items: Mounting system 1: Mounting adhesive gun: Wood screws: Hardware items required for installation Mounting system 2: Information: Steps for assembly 1 of Idealux FL panels: 1: Assembly glue on panel. 2: Glue both surfaces together. 3: Repeat steps 1 and 2 on the next piece and fit it to the piece attached to the wall. Steps for assembly 2 of Idealux FL panels: 1: Place the panel on the wall in the desired position. 2: Fix the panel with wood screws using a screwdriver. 3: Fit the next piece with the piece fixed to the wall and repeat steps 1 and 2. (*) Configuration of standard...

 Open the catalog to page 7
IDEAWOOD INSTALLATION GUIDE-8

Wall: Required items: OMEGA metal profile Acoustic black fleece Start/End piece Double groove fixing cleat el Assembly hardware items required for installation Information: Steps to assemble Slatst: 1: Attach the Omega metal profile to the wall surface with screws. 2: Screw up on the same waythe start/end piece on the first and last panel. 3: Attach the panel to the wall surface by coupling the fixing cleats and the profile. 4: Introduce and turn, with just a twist, the fixing cleat for tongue and groove inside the profiles and after each panel. Move the connecting MDF piece towards the panel. 5: Attach...

 Open the catalog to page 8
IDEAWOOD INSTALLATION GUIDE-9

Ceiling: Required items: Mounting system: Perimeter Trim OMEGA metal profile Acoustic black fleece Double groove fixing cleat 6 Assembly hardware items required for installation For other installation systems, please ask Steps to assemble SLATS: 1: Put and level the perimeter trims ont the surface perimeter that needs to be covered. 2: Lay out T-Grid system (threaded rod, metal profiles and hanging pieces). 3: Screw Start/End piece on the back of the slat, just on the first and last slat. 4: Push the start towards the omega profile, so the Start/End clips are inserted on the profile. 5: Twist flixing...

 Open the catalog to page 9
IDEAWOOD INSTALLATION GUIDE-10

Wall: Required items: Mounting system : D-wood Panel Omega Metal Profile Start/End Piece Fixing cleat for double groove Acoustic black fleece Assembly Hardware items required for installation Information: Steps to assemble D-Wood panels: 1: Attach the metal profile to the wall surface with screws. 2: Screw up on the same waythe start/end piece on the first and last panel. 3: Attach the panel to the wall surface by coupling the fixing cleats and the profile. 4: Introduce and turn, with just a twist, the fixing cleat for tongue and groove inside the profiles and after each panel. Move the connecting MDF...

 Open the catalog to page 10
IDEAWOOD INSTALLATION GUIDE-11

Ceiling: Required items: D-wood Panel Mounting system: OMEGA Metal Profile Perimeter Trim Fixing cleat for double groove Acoustic black fleece 6 Assembly Hardware items required for installation For other installation systems, please ask Information: Steps to assemble D-WOOD panels: 1: Put and level the perimeter trim on the surface perimeter that needs to be covered. 2: Lay out T-Grid system (threaded rod, metal profiles..). 3: Attach the panel to the wall surface by coupling the fixing cleats and the profile. 4: Attach the panel to the metal profiles by coupling the start/end piece against the profile....

 Open the catalog to page 11

All Ideatec Advanced Acoustic Solutions catalogs and technical brochures

  1. Produits 2022

    2  Pages

  2. Catalogue 2022

    132  Pages

  3. IDEAGARDEN

    5  Pages

  4. IDEAFLOW

    21  Pages

  5. IDEAFABRIC

    9  Pages

  6. IDEAWOOD

    15  Pages

  7. IDEAPERFO

    27  Pages

  8. IDEACUSTIC

    17  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.