Product catalog summary
Preparatory Plumbing Specifications & Guidelines
The document provides essential information for plumbing contractors preparing for the delivery and installation of the Hydrowood 7. It emphasizes compliance with local and national plumbing codes and mentions that an installation and user guide accompanies the equipment.
General Description
The Hydrowood 7 features a table-mounted panel with a thermostatic water temperature mixing valve and flow controls. It includes a fixed-height, free-standing table supporting a stainless steel swing-away rainbar with a face-shield.
Requirements
  • Hot and Cold Water Supply: ¾" (19mm) supply lines should exit the wall as per the provided plan. These lines connect to ¾" (19mm) male unions behind the control panel. The rainbar, weighing 33lbs (15kg), connects to the control panel via a flexible ¾" (19mm) hose. It is crucial to purge water lines of debris before final connection, and fitting ¾" (19mm) true-flow in-line serviceable water strainers is recommended.
  • Water Drainage: A 2" (50mm) drain is necessary for the Hydrowood wet treatment table. An additional 2" (50mm) floor drain is required to manage floor drainage and potential flooding, as the full flow of showers will regularly direct water onto the floor during normal operation.
  • Operating Pressure: The allowed water pressure ranges from 43.5 PSI to 145 PSI, with an optimal performance pressure of 60-70 PSI.
  • Water Consumption: The shower system uses approximately 100 gallons (400 liters) of water per 20-minute treatment, with 50 gallons (200 liters) being hot water. The hot water supply should be adequate for the expected number of daily treatments. Note that specific treatments may be designed to reduce water consumption.
Additional Notes
The manufacturer reserves the right to amend specifications without prior notice.
See more

Catalog excerpts

PREPARATORY PLUMBING-1

PREPARATORY PLUMBING SPECIFICATIONS & GUIDELINES The following information is to assist the plumbing contractor in preparation for the delivery and installation of the Hydrowood 7. • All plumbing work performed must be in accordance with local and national codes. • An installation and user guide is supplied with the equipment. GENERAL DESCRIPTION The Hydrowood 7 has a table mounted panel containing thermostatic water temperature mixing valve and flow controls. The table is a fixed height free standing table that supports a stainless steel swing-away rainbar with face-shield. REQUIREMENTS Hot and Cold Water Supply – ¾” (19mm) Operating Pressure Water Consumption ¾"(19mm) hot and cold supply lines should exit the wall as shown in the plan provided. The hot and cold water supply lines are to be connected to the ¾"(19mm) male unions located behind the table mounted control panel. The swing-away rainbar locates in a bracket at the end of the wet table. Rainbar weight is 33lbs (15kg) and the control panel connects to the rainbar via the flexible ¾"(19mm) hose supplied. The hose is externally connected. Ensure that water lines are purged of sand and grit etc prior to final connection to the unit. It is recommended that ¾"(19mm) true-flow in-line serviceable water strainers be fitted The Hydrowood wet treatment table should have 2"(50mm) drain connected. An additional 2"(50mm) floor drain is required in the room that the Hydrowood 7 is installed to cater for drainage of the floor and in the event that future flooding occurs – The full flow of showers will be directed onto the floor regularly throughout normal operation.. An operating water pressure between 43.5 PSI and 145 PSI max is allowed. For optimum shower performance a pressure of approximately 60-70 PSI is recommended. The Hydrowood 7 has a shower system that utilises approximately 100 gallons (400 litres) of water per 20 minute treatment. Assume 50 gallons (200 litres) of this to be Hot water. Based upon the expected number of treatments daily an appropriate hot water supply needs to be installed. NOTE: Specific treatments may be designed to reduce water consumption. Manufacturer reserves the right to amend specifications with

 Open the catalog to page 1

All HydroCo catalogs and technical brochures

  1. HYDRORAIN 7

    1  Page

  2. HYDROWET 7

    1  Page

  3. HYDROWOOD 7

    1  Page

Archived catalogs

  1. Beyond

    7  Pages

  2. Softime

    12  Pages

  3. suspense

    7  Pages

  4. suzi

    7  Pages

  5. hydro tan

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.