1. Catalogs
  2. GROEN
  3. OPERATOR-MANUAL
video corpo

OPERATOR-MANUAL

OPERATOR-MANUAL
1 / 28 PagesView full catalog

OPERATOR-MANUAL

Product catalog summary
Operator Safety Warnings: The manual emphasizes the importance of proper installation and maintenance to prevent injury or damage. It warns against storing flammable materials near the appliance and provides instructions for gas leak situations. It also highlights the risks of improper installation and the necessity of qualified personnel for installation and servicing.
Equipment Description: The Groen Convection Combo™ is a combination steamer-oven with a stainless steel cooking chamber, steam generator, and control compartment. It operates in three modes: convection oven, pressureless steamer, and combination oven-steamer. The manual details the different models and their capacities, as well as the control panel features.
Installation: Installation must be performed by qualified personnel and comply with applicable codes. The unit requires adequate ventilation and should not be installed near heat sources or with blocked vents. Specific instructions are provided for gas and electrical connections, emphasizing the need for proper pressure and safety measures.
Water Quality and Treatment: The manual stresses the importance of using treated water to prevent scale formation in the steam generator. It recommends using a Groen Water Treatment System and maintaining a regular cartridge replacement schedule to ensure optimal performance and longevity of the equipment.
Initial Start-Up and Operating Instructions: Detailed procedures for starting up and operating the unit are provided, including setting cooking modes and temperatures. The manual advises on safety precautions during operation, such as avoiding steam burns and ensuring the fan has stopped before accessing the cooking chamber.
Cleaning and Maintenance: The manual outlines cleaning procedures, emphasizing the need to disconnect power before cleaning and to avoid using certain chemicals that could damage the unit. Regular maintenance and deliming are recommended to prevent scale buildup and ensure efficient operation.
Troubleshooting and Diagrams: A troubleshooting section is included to help diagnose and resolve common issues. Diagrams and schematics provide visual guidance for installation and maintenance tasks.
Electrical Specifications: Each oven in a double-stacked unit requires a 115 VAC, 60 Hz, single-phase, 15 AMP service. Compliance with local codes and the National Electrical Code (ANSI/NFPA 70-1987 or latest edition) is mandatory. An electrical ground is required, and the maximum load per oven is 5½ AMPs. In Canada, follow the Canadian Electrical Code, CSA C22.1 Part 1, and/or local codes.
Water Supply Connection: A check valve must be installed in the incoming cold water lines per local plumbing codes. Water line pressure should be between 30 and 60 PSI, with a pressure regulator required above 60 PSI. A ¾ inch NH connector is needed for the water inlet valve, and the water feed line diameter must be at least ½ inch. The minimum flow rate for water delivery is 1.5 gallons per minute.
Drain Connection: For units without a drain tank, a hose may be attached to the supplied drain outlet. There must be a free air gap between the hose end and the building drain. For units with a drain tank, a hose can be connected directly to a building drain, as the tank has an air vent. Plastic pipes should not be used due to the high temperature of the water.
Initial Start-Up: Ensure all packing materials are removed, and check that water and gas supply lines are open. Turn on electrical service and ignite the pilot burner. The control panel will operate once the pilot burner is lit. The unit requires altitude settings above 5,000 feet for proper operation.
Operation: Users must be trained in safe and correct operating procedures. The unit should not be operated without electric power or if the cooking compartment partitions are not in place. The control panel includes a timer, status lights, and mode selection touch pads. The unit can operate in Steam, Combo, or Oven modes, with specific procedures for each.
Safety Warnings: Users should stay away from steam when opening the door, as it can cause burns. Blocking the drain is hazardous, and improper drain connection will void the warranty.
Overview: This document provides detailed instructions for operating and maintaining the Convection Combo™ oven. It includes sections on operating modes, cleaning procedures, and safety precautions.
1. Operating Modes:
  • Convection Oven Mode: To use, switch on the power and set the desired temperature using the Temperature Control Knob. The oven operates between 200°F and 575°F, with a maximum of 500°F when using optional features. The READY light indicates the oven has reached the desired temperature.
  • Combo Mode: Similar to the oven mode, but includes steam generation. The temperature range is 220°F to 575°F. The WAIT light indicates the oven is heating, and the READY light signals it is ready for use.
  • Fast Cool: Used to quickly cool the oven by opening the door and pressing START, which activates the fan.
  • Shutting Down: Press the mode touch pad and switch off the power. Leave the door partially open if allowed by local regulations.
2. Cleaning Procedures:
  • Exterior Cleaning: Use a mild detergent and avoid allowing liquids to contact electrical components. Stainless steel surfaces can be polished with a suitable cleaner.
  • Interior Cleaning: Follow a specific sequence for cleaning and de-liming. Use appropriate cleaning agents and avoid metal tools that could scratch surfaces.
  • De-liming: Pour de-liming solution into the designated port and follow the supplier's instructions. Ensure no reaction occurs between different cleaning agents.
3. Safety Precautions:
  • Always disconnect the power supply before cleaning.
  • Avoid contact with hot surfaces and steam, which can cause burns.
  • Do not mix de-liming agents with degreasers.
  • Ensure all removable partitions are correctly positioned before operating the unit.
4. Important Notes:
  • Do not use metal sponges or implements that could scratch surfaces.
  • Check for chloride content in cleaning agents to prevent corrosion.
  • Follow all safety warnings and instructions provided by cleaning agent suppliers.
Cleaning Procedures: When cleaning double-stack units, start the second oven clean cycle five minutes after the first. If deliming, pour one quart of clean water into the reservoir after the deliming solution is drawn into the steam generator. To exit the Clean Cycle, press and hold the CLEAR touch pad for three seconds. After stopping the Clean Cycle, thoroughly wash out chemical residues before cooking.
Maintenance: The Groen Convection Combo™ requires minimal maintenance. If steam leaks from the door, check the gasket and adjust the latch pin. Only authorized personnel should perform service.
Troubleshooting: If the pilot burner does not light, contact service. For control issues, reset by pressing the COMBO touch pad while turning the power back on. Service messages indicate errors: non-critical errors allow continued operation, while critical errors require service intervention.
Troubleshooting Guide: Common issues include low/high water level probes, maximum generator fill time, faulty air/generator probes, and maximum generator drain time. Each issue has specific actions and may limit operational modes.
References: Includes contact information for standards organizations and manufacturers like the American National Standards Institute and Underwriters Laboratories.
Service Log: Includes fields for model number, serial number, purchase details, and maintenance records.
See more

Catalog excerpts

OPERATOR-MANUAL-1

I • •MPORTANT INFORMATION • • FOR OPERATOR • • IMPORTANT KEEP IMPORTANT INFORMATION • • OPERATOR MANUAL CC10-G, (2)CC10-G C/2-20G, (2)C/2-20G CONVECTION COMBO™ Combination Steamer-Oven C/2-20GF with optional pan racks THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE. READ, UNDERSTAND AND FOLLOW THE INSTRUCTIONS AND WARNINGS CONTAINED IN THIS MANUAL. FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND LIQUIDS IN THE VICINITY OF THIS OR ANY OTHER APPLIANCE . POST IN A PROMINENT LOCATION INSTRUCTIONS TO BE FOLLOWED IN THE EVENT USER SMELLS GAS. THIS INFORMATION SHALL BE OBTAINED BY CONSULTING YOUR LOCAL GAS SUPPLIER. AS A MINIMUM, TURN OFF THE GAS AND CALL YOUR GAS COMPANY AND YOUR AUTHORIZED SERVICE AGENT. EVACUATE ALL PERSONNEL FROM THE AREA. WARNING: IMPROPER INSTALLATION, ADJUSTMENT, ALTERATION, SERVICE OR MAINTENANCE CAN CAUSE PROPERTY DAMAGE, INJURY OR DEATH. READ THE INSTALLATION, OPERATING AND MAINTENANCE INSTRUCTIONS THOROUGHLY BEFORE INSTALLING OR SERVICING THIS EQUIPMENT. Information contained in this document is known to be current and accurate at the time of printing/creation. Unified Brands recommends referencing our product line websites, unifiedbrands.net, for the most updated product information and

 Open the catalog to page 1
OPERATOR-MANUAL-2

IMPORTANT — READ FIRST — IMPORTANT WARNING: THE UNIT MUST BE INSTALLED BY PERSONNEL QUALIFIED TO WORK WITH GAS, ELECTRICITY AND PLUMBING. IMPROPER INSTALLATION CAN CAUSE INJURY TO PERSONNEL AND/OR DAMAGE TO THE EQUIPMENT. THE UNIT MUST BE INSTALLED IN ACCORDANCE WITH APPLICABLE CODES. SHIPPING STRAPS ARE UNDER TENSION AND CAN SNAP BACK WHEN CUT. DO NOT INSTALL THE UNIT IN ANY WAY WHICH WILL BLOCK THE RIGHT SIDE VENTS, OR WITHIN 12 INCHES OF A HEAT SOURCE SUCH AS A BRAISING PAN, FRYER, CHAR BROILER OR KETTLE. LEVEL THE UNIT FRONT TO BACK, OR PITCH IT SLIGHTLY TO THE REAR, TO AVOID DRAINAGE PROBLEMS....

 Open the catalog to page 2
OPERATOR-MANUAL-3

Table of Contents IMPORTANT OPERATOR SAFETY WARNINGS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 EQUIPMENT DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 INSPECTION AND UNPACKING . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 WATER QUALITY AND TREATMENT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ....

 Open the catalog to page 3
OPERATOR-MANUAL-4

OM-CC-G and C/2-G Equipment Description this port into a fill tank, from which it is transferred to the steam generator during the unique Groen automatic cleaning cycle. Your Groen Convection Combo™ has a stainless steel cooking chamber, an air heating compartment with heat exchange tubes and fan, a steam generator, and a control compartment which houses electrical components. The air heating space which contains the heat exchanger tubes is also separated from the cooking chamber by removable left, right, top and bottom partitions. The compartment which contains the unit’s automatic controls...

 Open the catalog to page 4
OPERATOR-MANUAL-5

OM-CC-G and C/2-G Inspection and Unpacking Your Convection Combo™ will be completely assembled in a heavy shipping carton (CC10-G) or wooden crate (C/2-20G), and attached to a skid. On receipt, inspect the carton or crate carefully for exterior damage. Write down the model number, serial number and installation date and keep this information for future reference. Space for these entries is provided at the top of the Service Log in the back of this manual. CAUTION THIS UNIT IS VERY HEAVY. YOU SHOULD GET HELP AS NEEDED AND USE MATERIAL HANDLING EQUIPMENT TO REMOVE THE UNIT FROM THE SKID AND MOVE...

 Open the catalog to page 5
OPERATOR-MANUAL-6

OM-CC-G and C/2-G Water Quality and Treatment 3. Using a Groen water treatment system will provide longer steam generator/boiler life, higher steam capacity, and reduce maintenance requirements. It is essential to supply the steam generator/boiler with water that will not form scale. Even though the steam generator/boiler is engineered to minimize scale formation, scale development depends on the hardness of your water and the number of hours you operate the equipment each day. 4. If you notice a slowdown in steam production or an increase in deliming, have the Combo checked for scale build-up....

 Open the catalog to page 6
OPERATOR-MANUAL-7

OM-CC-G and C/2-G Installation and Start-Up WARNING THE UNIT MUST BE INSTALLED BY PERSONNEL WHO ARE QUALIFIED TO WORK WITH GAS, ELECTRICITY AND PLUMBING. IMPROPER INSTALLATION CAN CAUSE INJURY TO PERSONNEL AND/OR DAMAGE TO THE EQUIPMENT. THE UNIT MUST BE INSTALLED IN ACCORDANCE WITH APPLICABLE CODES. CAUTION DO NOT INSTALL THE UNIT WITH THE RIGHT SIDE VENTS BLOCKED OR WITHIN 12 INCHES OF A HEAT SOURCE (SUCH AS A BRAISING PAN, DEEP FRYER, CHAR BROILER OR KETTLE). DO NOT INSTALL TO THE LEFT OF ANY OPEN-FLAME EQUIPMENT. DO NOT INSTALL UNIT WITHIN FOUR FEET OF A STEAM DRAIN. TO AVOID DRAINAGE PROBLEMS,...

 Open the catalog to page 7
OPERATOR-MANUAL-8

OM-CC-G and C/2-G other elbows or other restrictions between the unit drain and the free air gap. 2. Electrical Supply Connection For a single oven, or for each oven in a double stacked unit, provide 115 VAC, 60 Hz, single phase, 15 AMP service. Local codes and/or the National Electrical Code should be observed in accordance with ANSI/NFPA 70-1987 (or latest edition). AN ELECTRICAL GROUND IS REQUIRED. The electrical schematic is located in the service compartment and this manual. Maximum load per oven is 5½ AMPs. In Canada provide electrical service in accordance with the Canadian Electrical...

 Open the catalog to page 8
OPERATOR-MANUAL-9

Convection Combo™ Utility Connections NOTE: Remove right side panel to make connections at terminal block in rear of control compartment.

 Open the catalog to page 9
OPERATOR-MANUAL-10

Proper Drain Line Connections

 Open the catalog to page 10
OPERATOR-MANUAL-11

OM-CC-G and C/2-G Initial Start-Up WARNING ANY POTENTIAL USER OF THE EQUIPMENT SHOULD BE TRAINED IN SAFE AND CORRECT OPERATING PROCEDURES. 7. Once the pilot burner flame has been established (the green light at the pilot switch is on), all operator commands are executed via the front control panel touch pads. See the Operation section for details. After the Convection Combo™ has been installed, test it to ensure that it is operating correctly. 1. Remove all literature and packing materials from the interior and exterior of the unit. 2. Check that the cold water supply line is open and that the...

 Open the catalog to page 11

Archived catalogs

  1. COMBO EASE

    8  Pages

  2. CORE PRODUCTS

    8  Pages

  3. Vortex100

    8  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.