video corpo
cad

eden

eden

eden

Product catalog summary
General Warnings and Specifications:
  • Dimensions are in millimeters with a tolerance of ±5 mm. Brickwork can recede up to 15 mm for built-in installations, except for models with a front panel. Inspection panels (min. 600 x 400 mm) must be accessible for maintenance. An air grill of at least 250 cm² is required.
  • Manufacturers may modify products without notice. Bathtub depth is measured from the rim to the deepest point.
Compliance and Standards:
  • Complies with Low Tension Directive 2014/35/UE and Electromagnetic Compatibility Directive 2014/30/UE, supported by standards EN 60335-1, EN 60335-2-60, EN 55014-1, and EN 55014-2.
  • Building materials comply with EU Regulation No. 305/2011 (CPR) and standards EN 12764 and EN 14516.
Installation Requirements:
  • Ensure the site is accessible and can support the product's weight (min. 200 kg/m²). Installation must be by qualified personnel following IEC standards.
  • Surfaces must be suitable and free from obstructions. Electrical and plumbing installations must comply with local regulations and be performed by qualified personnel.
Plumbing and Electrical Specifications:
  • Dynamic water pressure must suit the product's specifications. A pressure reducer is needed if pressure exceeds 350 kPa. Mesh filters should be installed to prevent water impurities.
  • Electrical installations require a differential switch and a circuit breaker with appropriate specifications. Proper grounding and equipotential bonding are essential.
Water Supply Specifications:
  • Water pressure should be between 150 and 350 kPa. A pressure reducer is necessary if pressure exceeds 350 kPa. Mesh filters should be used to prevent impurities.
  • Connect the product to the water supply using a CAa type hydraulic disconnector as per European Standards.
Steam Generator Requirements:
  • Pressure: 150 to 350 kPa. Hardness: 10°F to 40°F (400 ppm as CaCO3). Conductivity: 300 to 1250 μS/cm.
Electrical Installation Specifications:
  • Must be performed by a qualified technician and comply with International Installation Standards and national legal requirements.
  • Use H07 RN-F cable for power box connections. The earth cable must be longer than phase and neutral conductors. Install a 30mA differential switch and a class III overvoltage circuit breaker.
  • Switches should be near the appliance and not accessible to users.
General Installation Requirements:
  • Verify transport path and dimensions of doors, stairs, and corridors. Ensure the floor and walls can support a minimum weight of 200 Kg/m².
  • Installation must be done by qualified personnel according to CEI standards. Obtain a conformity declaration from the user before electrical and hydraulic connections.
Additional Notes:
  • The manufacturer is not liable for defects due to electrical instability. An efficient earthing system is required for metal structures. Installation of electrical devices in bathrooms must comply with local regulations.
Specifications and Installation Requirements:
  • Power Cable: Use H07 RN-F cable with appropriate section based on product power. The earth terminal must be at least 30 mm longer than phase and neutral conductors.
  • Grounding: The ground cable must be permanently connected to the electrical network. The manufacturer is not responsible for failures due to improper grounding.
  • Equipotential Connection: Connect the equipment to the local equipotential installation and secure it to the product's terminal. Install a 30mA differential switch and a class III surge protection switch with at least 3 mm contact opening.
  • Installation in Bathrooms: Differential switch must be placed according to international and national standards, away from water sources.
Installation Guidelines:
  • Transport and Installation: Ensure the product can be transported to the installation site considering doorways, stairs, etc. Installation must be by qualified personnel following IEC standards.
  • Site Preparation: Ensure the floor/wall can support the product's weight (min 200Kg/m²) and is technically prepared.
  • Hydraulic Installation: Ensure dynamic water pressure is appropriate. Install pressure reducers if pressure exceeds 350 kPa. Use CAa type hydraulic disconnectors to prevent backflow pollution.
  • Electrical Installation: Must comply with international and national standards. Use appropriate cables and ensure the installation can support the product's power.
Technical Data:
  • Net Weight: 58 Kg
  • Hydraulic Features: Capacity to overflow: 372 l, Water delivery from overflow: 9 l/min at 150 kPa, Water delivery from spout: 11 l/min at 150 kPa.
  • Whirlpool and Airpool: 8 jets, 2+2 back/feet jets, Pump water delivery: 380 l/min, 16 air jets.
  • Electrical Features: Voltage: 230 V, Frequency: 50/60 Hz, Protection degree: IPX5, Absorbed power: 2100 W (Whirlpool), 800 W (Airpool), Noise level: <=75 dB.
Installation Diagrams: Includes dimensions and suggested areas for electrical and hydraulic connections, as well as pump positioning.
See more

Catalog excerpts

eden-1

1 Le dimensioni d’ingombro sono espresse in mm 2 Tolleranze dimensionali sulle misure reali ± 5 mm 3 Per I’eventuale installazione ad incasso, ad eccezione dei modelli per i quali e obbligatorio I’utilizzo del pannello frontale, la muratura puo rientrare per un massimo di 15 mm rispetto al bordo esterno. In tal caso devono essere previsti dei pannelli d’ispezione (min. 600 x 400 mm). La posizione dei pannelli d’ispezione sia tale che parti come blower, pompe, valvole, scatole di connessione e allacciamento alla rete idrica siano sempre accessibili e sostituibili. Una grata per la ventilazione ( V min. 250 cm2 ) e obbligatoria. 4 Prestare particolare attenzione alle dimensioni di ingombro dei prodotti. 5 La casa costruttrice si riserva il diritto di apportare in qualsiasi momento modifiche e migliorie al prodotto senza dare preavviso. 6 L'indicazione del comando (■) nei disegni, fa riferimento unicamente al comando manuale. 7 Profondita vasca: altezza rilevata dal bordo vasca al punto piu profondo 2 Dimensional tolerance on real size ± 5 mm. 3 In case of built-in installation, the brickwork can recede of a maximum of 15 mm with regards to the external rim, with the exception of models where the use of a front panel is compulsory. In this case inspection panels must be provided (min. 600 x 400 mm). The inspection panels has to be placed so that parts such as blowers, pumps, valves, connector boxes and other connections and the water supply could be always accessible and replaceable. An air grill (min. 250 cm2) is mandatory. 4 Pay special attention to the overall dimensions of the products. 5 The manufacturer reserves the right to carry out product modifications and improvements at any time without prior notice. 6 The indication of the control (■) in the pictures refers only to the manual control. 7 Bathtub depth: height measured from the rim to the deepest point of the bathtub. 1 Die AuGenmaGe werden in Millimetern angegeben. 2 GroGenabweichungen gegenuber den reellen MaGen ±5 mm 3 Bei Einbau der Wannen, ausgeno mmen die Modelle, fur die die Verwendung des Frontpaneels erforderlich ist, darf die Mauer gegenuber dem auGeren Wannenrand maximal um 15 mm zuruckversetzt sein. In diesem Fall mussen Inspektionsoffnungen (min. 600 x 400 mm) vorgesehen werden. Von diesen Offnungen mussen alle technischen Gerate wie Geblase, Pumpe, Ventile, Anschlusskasten, weitere Anschlusse und die Wasserzuleitung erreichbar bzw. auswechselbar sein. Ein Luftungsgitter (von min. 250 cm2 ) ist bindend. 4 Achten Sie insbesondere auf die AuGenmaGe der Produkte. 5 Der Hersteller behalt sich das Recht vor, jederzeit und ohne Vorankundigung Anderungen und Verbesserungen an den Produkten vorzunehmen. 6 Die Angabe der Steuerung (■) auf die Zeichnungen bezieht sich nur auf die manueller Steuerung. 7 Wannen-Innentiefe: von Wannenrand-Oberkante bis zur tiefste Stelle der Wanne gemessen. 1 Las dimensiones estan expresadas en mm. 2 Tolerancias dimensionales en las medidas reales ± 5 mm. 3 Para la eventual instalacion empotrada, a excepcion de los modelos para los cuales es obligatorio emplear el faldon frontal, la mampostena puede reentrar al maximo de 15 mm con respecto del borde externo. En este caso, se tiene que prever un faldon para la inspeccion (min. 600x400 mm). La posicion del faldon para la inspeccion tiene que ser tal que partes como blower, bompas, valvulas, cajas de conexion y enlace a la red hidraulica sean sempre accesibles y sustituibles. Una rejilla para la ventilacion (min 250 cm2) es obligatoria. 4 Prestar particular atencion a las dimensiones maximas de los productos. 5 El fabricante se reserva el derecho de aportar en cualquier momento modificaciones y mejonas al producto sin previo aviso. 6 La indication del control (■) en los disenos, hace referencia solamente al control manual. 7 Profundidad banera : altura obtenida del borde banera al Lugar mas profundo. 1 Les dimensions d’encombrement sont exprimees en mm. 2 Tolerances sur les dimensions reelles ± 5 mm. 3 Pour une eventuelle pose encastree, a l’exception des modeles qui imposent le montage du panneau frontal, la magonnerie peut etre en retrait de 15 mm maxi. par rapport au bord externe. Dans ce cas, il faudra prevoir des trappes de visite (min600 X 400 mm). Le positionnement des trappes doit faciliter l’acces aux parties electriques co mme blower, pompe, valves, boitiers de connexions ainsi qu’aux divers branchements hydrauliques. Una aeration (min 250 cm2) est obligatoire 4 Faire extremement attention aux dimensions d’encombrement des produits. 5 Le Fabricant se reserve le droit d’apporter, a tout moment et sans preavis, des modifications et des ameliorations au produit. 6 La position de la co mmande (■) sur le dessin se refere uniquement a la co mmande manuelle. 7 Profondeur baignoire : hauteur releve du bord baignoire au Point plus profond. AZIENDA CON SISTEMA DI GESTIONE QUALITA CERTIFICATO DA DNV GL = ISO 9001 =

 Open the catalog to page 1
eden-2

REQUISITI PER L’INSTALLAZIONE DEL PRODOTTO Fare ATTENZIONE alle dimensioni degli imballi del prodotto acquistato! Verificare il percorso per il trasporto del prodotto, al sito prescelto per l'installazione, verificando le misure di porte, scale, pianerottoli, corridoi. L’installazione va eseguita da personale qualificato nel rispetto delle norme IEC. L’installatore deve assicurarsi preventivamente che il pavimento e/o parete dove verrà installato il prodotto sia sufficientemente livellato, che ne possa sopportare il peso (min.200kg/m2) e che vi siano le predisposizioni tecniche necessarie. Deve...

 Open the catalog to page 2
eden-3

REQUIREMENTS FOR INSTALLING THE PRODUCT Pay ATTENTION to the dimensions of the packages of the purchased product! Check the route for transporting the product, to the selected installation site, checking the measurements of: doors, stairs, landings, corridors Installation must be carried out by qualified personnel in accordance with IEC standards. The installer must make sure in advance that the floor and/or wall where the product will be installed is sufficiently level, capable of supporting the weight (min 200 Kg/m2) and that there are the necessary technical arrangements. He must also check...

 Open the catalog to page 3

All GLASS 1989 catalogs and technical brochures

  1. Mimesi Panel

    10  Pages

  2. Steam Plus

    12  Pages

  3. hoshi

    11  Pages

  4. Nuvola Open

    3  Pages

  5. nubea round

    8  Pages

  6. linea duo

    11  Pages

  7. mawi

    10  Pages

  8. queen

    2  Pages

  9. chloe

    2  Pages

  10. denver

    2  Pages

  11. momoa

    2  Pages

  12. Bloom

    4  Pages

  13. Meilin

    2  Pages

  14. Alchemy

    2  Pages

Archived catalogs

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.
About ArchiExpo
ArchiExpo is a marketplace that offers B2B players a complete experience, from product sourcing to purchase. ArchiExpo is an entity of VirtualExpo Group.