video corpo

referenze
1 /45Pages

referenze

referenze
1 /45Pages

Catalog excerpts

referenze-1

REFERENCE LIST THE MOST ADVANCED ENERGY-SAVING TECHNOLOGIES Heat only where necessary

 Open the catalog to page 1
referenze-2

RUSSIA PANRAD ОАО «Тujmazinskij Zavod Autobetonovozov» Tujmazy (Republic of Bashkortostan) Project details: Year of installation and start-up: 2008 Required internal temperature: 18°c

 Open the catalog to page 2
referenze-3

RUSSIA PANRAD ОАО “Тяzhmаsh” Syzran (Samara Region) Project details: Year of installation and start-up: 2005 Required internal temperature: 18°c Relevant details:

 Open the catalog to page 3
referenze-4

Ceramiche MARAZZI MARAZZIH Malino (Moscow region) Project details: Year of installation and start-up: 2005 Required internal temperature: 18°c

 Open the catalog to page 4
referenze-5

RUSSIA GIRAD Ceramiche Atlas Concorde Stupino (Moscow region) Project details: Year of installation and start-up: 2005 Required internal temperature: 18°c

 Open the catalog to page 5
referenze-6

Project details: Year of installation and start-up: 2004 Required internal temperature: 18°c Relevant details:

 Open the catalog to page 6
referenze-7

RUSSIA PANRAD OOO “Saratov” Engels (Saratov Region) Project details: Refigerator production Relevant details: 60 PANRAD - Power installed 2400 kW

 Open the catalog to page 7
referenze-8

RUSSIA PANRAD OOO “Elativ” Engels (Saratov Region) Project details: Metal pattern production Relevant details: 6 PANRAD - Power installed: 270 kW

 Open the catalog to page 8
referenze-9

RUSSIA PANRAD OAO “Saratovskaja fabrika polimernyh izdelii” Saratov Project details: Relevant details:

 Open the catalog to page 9
referenze-10

Project details: Industrial equipment production Relevant details: 36 PANRAD - Power installed: 1690 kW

 Open the catalog to page 10
referenze-11

Ganja Automotive Plant Zavodu Project details: Year of installation and start-up: October 2007 Required internal temperature: 18°c Relevant details:

 Open the catalog to page 11
referenze-12

POLAND GIRAD PRONOX TECHNOLOGY EASY TOUCH POLAND S.A. Dąbrowa Górnicza Project details: Year of installation and start-up : 2008 Required internal temperature : + 10°C Relevant details: Total installed power: 1.900 kW - Heating solution: GIRAD radiant modules Appliances installed : 10 pcs. generator GSR roof mounted Total length (pipes) of the installation: 1.485m single pipe Control system: digital computer control + Software SCP200 Fraccaro

 Open the catalog to page 12
referenze-13

GERMANY GIRAD THYSSENKRUPP NIROSTA Segmentwerkstatt Krefeld Project details: Year of installation and start-up: 2009 Required internal temperature: + 18°C Relevant details: Total installed power: 1.200 kW Heating solution: GIRAD radiant modules

 Open the catalog to page 13
referenze-14

GERMANY GIRAD DHL Express Service Center Raunheim Project details: Year of installation and start-up : 2009 Required internal temperature : +18°C

 Open the catalog to page 14
referenze-15

GERMANY GIRAD AERO-DIENST. Nürnberg Project details: Year of installation and start-up : 2008 Required internal temperature : +21°C

 Open the catalog to page 15
referenze-16

NORWAY GIRAD Torp Flyplass Sandefjord Sandefjord Project details: Year of installation and start-up: 2009 Required internal temperature: +17°C

 Open the catalog to page 16
referenze-17

NORWAY GIRAD GMC MARITIME Stavanger Project details: Year of installation and start-up : 2007 Required internal temperature : +18°C

 Open the catalog to page 17
referenze-18

NORWAY GIRAD BETONG AS Skurve Sandnes Project details: Year of installation and start-up: 2009 Required internal temperature: +20°C

 Open the catalog to page 18
referenze-19

DENMARK GIRAD ROYAL DANISH AIR FORCE Aalborg Project details: Year of installation and start-up: 2005 Required internal temperature: +20°C

 Open the catalog to page 19
referenze-20

DENMARK WATERSTRIP ROYAL copenhagen Copenhagen Project details: Year of installation and start-up: 2005 Required internal temperature: +18°C

 Open the catalog to page 20
referenze-21

Project details: Year of installation and start-up: 2006 Required internal temperature: +18°C

 Open the catalog to page 21
referenze-22

Inner Mongolia Sunnergy Inner Monogolia Project details: Year of installation and start-up: 2004 Required internal temperature: +16°C Inner Mongolia Sunnergy Co..Ltd

 Open the catalog to page 22
referenze-23

CHINA GIRAD China Southern Airlines Urumqi Project details: Year of installation and start-up: 2006 Internal temperature: range from 18°C to 25°C to melt the ice on the aircrafts when they get into the hangar Relevant details: Layout: 19 GIRAD radiant modules 300kW 3 stages

 Open the catalog to page 23
referenze-24

CHINA GIRAD Hangar Shenyang Project details: Year of installation and start-up: 2005 Required internal temperature: +18°C

 Open the catalog to page 24
referenze-25

WOOJIN Industrial Systems co. Project details: Year of installation and start-up: 2006 Required internal temperature: +18°C

 Open the catalog to page 25
referenze-26

KOREA WATERSTRIP Jamsil Gymnasium Seoul Project details: Year of installation and start-up: 2009 Relevant details: 1.944 m WATERSTRIP Radiant Panels

 Open the catalog to page 26
referenze-27

KOREA WATERSTRIP Seoul Metro Shin Jung repairing shop Seoul Project details: Year of installation and start-up: 2009 Relevant details: 2.880 m WATERSTRIP Radiant Panels

 Open the catalog to page 27
referenze-28

KOREA WATERSTRIP Hokey stadium Project details: Required internal temp.: 15° C External temperature: Relevant details: 1.200 m WATERSTRIP Radiant Panels

 Open the catalog to page 28
referenze-29

ROMANIA GIRAD NBR - Nuova Neon Bassano Romania S.r.l. Arad Project details: Year of installation and start-up : 2008 Required internal temperature: + 18°C Relevant details: Heating solution: GIRAD radiant modules Appliances installed: 6 pcs. generator GSR wall mounted

 Open the catalog to page 29
referenze-30

SPAIN GIRAD COCA-COLA Madrid Project details: Year of installation and start-up : 2008 Required internal temperature: +18°C Relevant details: GIRAD radiant modules Appliances installed: 6 pcs. generator GSR wall mounted

 Open the catalog to page 30
referenze-31

SPAIN GIRAD RENAULT Madrid Project details: Year of installation and start-up : 2005 Required internal temperature : +18°C

 Open the catalog to page 31
referenze-32

SPAIN GIRAD Sabadell Athletics Stadium Barcelona Project details: Required internal temperature: +16° C Relevant details: GIRAD radiant modules Appliances installed: 8 pcs. GIRAD generators 150 kW

 Open the catalog to page 32
referenze-33

BULGARIA GIRAD Lufthansa Airport Sofia Project details: Year of installation and start-up: 2007 Required internal temperature: + 18°C

 Open the catalog to page 33
referenze-34

SWITZERLAND GIRAD Jet Aviation Basilea Project details: Year of installation and start-up: 2007 Required internal temperature: + 18°C

 Open the catalog to page 34
referenze-35

ITALY WATERSTRIP FIAT Auto S.p.a. Frosinone, Rome Project details: Year of installation and start-up: 2003 Required internal temperature: + 20°C Relevant details: 960m WATERSTRIP hot water panels

 Open the catalog to page 35
referenze-36

Baron Industries Project details: Year of installation and start-up: 2007 Required internal temperature: + 18°C

 Open the catalog to page 36
referenze-37

Project details: Year of installation and start-up: 2006 T required internal comfort temperature: + 20°C Quadro Elettrico

 Open the catalog to page 37
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.