REFERENCE LIST THE MOST ADVANCED ENERGY-SAVING TECHNOLOGIES Heat only where necessary

Open the catalog to page 1
referenze - 2

RUSSIA PANRAD ОАО «Тujmazinskij Zavod Autobetonovozov» Tujmazy (Republic of Bashkortostan) Project details: Year of installation and start-up: 2008 Required internal temperature: 18°c

Open the catalog to page 2
referenze - 3

RUSSIA PANRAD ОАО “Тяzhmаsh” Syzran (Samara Region) Project details: Year of installation and start-up: 2005 Required internal temperature: 18°c Relevant details:

Open the catalog to page 3
referenze - 4

Ceramiche MARAZZI MARAZZIH Malino (Moscow region) Project details: Year of installation and start-up: 2005 Required internal temperature: 18°c

Open the catalog to page 4
referenze - 5

RUSSIA GIRAD Ceramiche Atlas Concorde Stupino (Moscow region) Project details: Year of installation and start-up: 2005 Required internal temperature: 18°c

Open the catalog to page 5
referenze - 6

Project details: Year of installation and start-up: 2004 Required internal temperature: 18°c Relevant details:

Open the catalog to page 6
referenze - 7

RUSSIA PANRAD OOO “Saratov” Engels (Saratov Region) Project details: Refigerator production Relevant details: 60 PANRAD - Power installed 2400 kW

Open the catalog to page 7
referenze - 8

RUSSIA PANRAD OOO “Elativ” Engels (Saratov Region) Project details: Metal pattern production Relevant details: 6 PANRAD - Power installed: 270 kW

Open the catalog to page 8
referenze - 9

RUSSIA PANRAD OAO “Saratovskaja fabrika polimernyh izdelii” Saratov Project details: Relevant details:

Open the catalog to page 9
referenze - 10

Project details: Industrial equipment production Relevant details: 36 PANRAD - Power installed: 1690 kW

Open the catalog to page 10
referenze - 11

Ganja Automotive Plant Zavodu Project details: Year of installation and start-up: October 2007 Required internal temperature: 18°c Relevant details:

Open the catalog to page 11
referenze - 12

POLAND GIRAD PRONOX TECHNOLOGY EASY TOUCH POLAND S.A. Dąbrowa Górnicza Project details: Year of installation and start-up : 2008 Required internal temperature : + 10°C Relevant details: Total installed power: 1.900 kW - Heating solution: GIRAD radiant modules Appliances installed : 10 pcs. generator GSR roof mounted Total length (pipes) of the installation: 1.485m single pipe Control system: digital computer control + Software SCP200 Fraccaro

Open the catalog to page 12
referenze - 13

GERMANY GIRAD THYSSENKRUPP NIROSTA Segmentwerkstatt Krefeld Project details: Year of installation and start-up: 2009 Required internal temperature: + 18°C Relevant details: Total installed power: 1.200 kW Heating solution: GIRAD radiant modules

Open the catalog to page 13
referenze - 14

GERMANY GIRAD DHL Express Service Center Raunheim Project details: Year of installation and start-up : 2009 Required internal temperature : +18°C

Open the catalog to page 14
referenze - 15

GERMANY GIRAD AERO-DIENST. Nürnberg Project details: Year of installation and start-up : 2008 Required internal temperature : +21°C

Open the catalog to page 15
referenze - 16

NORWAY GIRAD Torp Flyplass Sandefjord Sandefjord Project details: Year of installation and start-up: 2009 Required internal temperature: +17°C

Open the catalog to page 16
referenze - 17

NORWAY GIRAD GMC MARITIME Stavanger Project details: Year of installation and start-up : 2007 Required internal temperature : +18°C

Open the catalog to page 17
referenze - 18

NORWAY GIRAD BETONG AS Skurve Sandnes Project details: Year of installation and start-up: 2009 Required internal temperature: +20°C

Open the catalog to page 18
referenze - 19

DENMARK GIRAD ROYAL DANISH AIR FORCE Aalborg Project details: Year of installation and start-up: 2005 Required internal temperature: +20°C

Open the catalog to page 19
referenze - 20

DENMARK WATERSTRIP ROYAL copenhagen Copenhagen Project details: Year of installation and start-up: 2005 Required internal temperature: +18°C

Open the catalog to page 20
referenze - 21

Project details: Year of installation and start-up: 2006 Required internal temperature: +18°C

Open the catalog to page 21
referenze - 22

Inner Mongolia Sunnergy Inner Monogolia Project details: Year of installation and start-up: 2004 Required internal temperature: +16°C Inner Mongolia Sunnergy Co..Ltd

Open the catalog to page 22
referenze - 23

CHINA GIRAD China Southern Airlines Urumqi Project details: Year of installation and start-up: 2006 Internal temperature: range from 18°C to 25°C to melt the ice on the aircrafts when they get into the hangar Relevant details: Layout: 19 GIRAD radiant modules 300kW 3 stages

Open the catalog to page 23
referenze - 24

CHINA GIRAD Hangar Shenyang Project details: Year of installation and start-up: 2005 Required internal temperature: +18°C

Open the catalog to page 24
referenze - 25

WOOJIN Industrial Systems co. Project details: Year of installation and start-up: 2006 Required internal temperature: +18°C

Open the catalog to page 25
referenze - 26

KOREA WATERSTRIP Jamsil Gymnasium Seoul Project details: Year of installation and start-up: 2009 Relevant details: 1.944 m WATERSTRIP Radiant Panels

Open the catalog to page 26
referenze - 27

KOREA WATERSTRIP Seoul Metro Shin Jung repairing shop Seoul Project details: Year of installation and start-up: 2009 Relevant details: 2.880 m WATERSTRIP Radiant Panels

Open the catalog to page 27
referenze - 28

KOREA WATERSTRIP Hokey stadium Project details: Required internal temp.: 15° C External temperature: Relevant details: 1.200 m WATERSTRIP Radiant Panels

Open the catalog to page 28
referenze - 29

ROMANIA GIRAD NBR - Nuova Neon Bassano Romania S.r.l. Arad Project details: Year of installation and start-up : 2008 Required internal temperature: + 18°C Relevant details: Heating solution: GIRAD radiant modules Appliances installed: 6 pcs. generator GSR wall mounted

Open the catalog to page 29
referenze - 30

SPAIN GIRAD COCA-COLA Madrid Project details: Year of installation and start-up : 2008 Required internal temperature: +18°C Relevant details: GIRAD radiant modules Appliances installed: 6 pcs. generator GSR wall mounted

Open the catalog to page 30
referenze - 31

SPAIN GIRAD RENAULT Madrid Project details: Year of installation and start-up : 2005 Required internal temperature : +18°C

Open the catalog to page 31
referenze - 32

SPAIN GIRAD Sabadell Athletics Stadium Barcelona Project details: Required internal temperature: +16° C Relevant details: GIRAD radiant modules Appliances installed: 8 pcs. GIRAD generators 150 kW

Open the catalog to page 32
referenze - 33

BULGARIA GIRAD Lufthansa Airport Sofia Project details: Year of installation and start-up: 2007 Required internal temperature: + 18°C

Open the catalog to page 33
referenze - 34

SWITZERLAND GIRAD Jet Aviation Basilea Project details: Year of installation and start-up: 2007 Required internal temperature: + 18°C

Open the catalog to page 34
referenze - 35

ITALY WATERSTRIP FIAT Auto S.p.a. Frosinone, Rome Project details: Year of installation and start-up: 2003 Required internal temperature: + 20°C Relevant details: 960m WATERSTRIP hot water panels

Open the catalog to page 35
referenze - 36

Baron Industries Project details: Year of installation and start-up: 2007 Required internal temperature: + 18°C

Open the catalog to page 36
referenze - 37

Project details: Year of installation and start-up: 2006 T required internal comfort temperature: + 20°C Quadro Elettrico

Open the catalog to page 37