TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2

TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2
1 / 36 PagesView full catalog

TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2

Product catalog summary
Safety Warnings
The manual stresses the importance of following safety regulations specific to the country of use. It is intended for users of TF products and systems, with the employer responsible for ensuring user comprehension. The manual should be accessible at the workplace but does not replace a Method Statement, which is the client's responsibility. Adherence to instructions is crucial to prevent accidents and property damage. Regular checks of connections, especially after severe weather, are advised.
System Description
The TF2 Shoring Towers are designed for heavy-duty tasks, providing a safe, strong, and flexible system for significant loads and challenging heights. Made from high-quality galvanized steel, the system ensures high load capacity and durability, featuring a standard grid with three frame sizes and modularity for optimization and efficiency.
Technical Features
The system includes frames, jack heads, foot spindles, horizontal and diagonal braces, and frame connectors, supporting up to 60 kN per leg. It allows for geometric and load adaptability, optimizing material use based on site conditions.
Towers Assembling Instructions
The TF2 system can be assembled vertically or horizontally, depending on site conditions. Vertical assembly involves inserting and fixing foot spindles, connecting frames with braces, and ensuring proper anchorage for stability. Horizontal assembly follows similar steps, starting with foot spindles and braces.
Stair Tower System Description
The stair tower system includes assembly instructions, anchoring details, and a material list, designed to provide safe access and support during construction activities.
Horizontal Assembling
Once assembled, the tower can be lifted and positioned using lifting straps and a crane. Proper assembly is crucial for safe lifting and positioning.
System Dimensioning
The document specifies maximum and minimum dimensions for tower shifting and anchoring, emphasizing anchoring every 8 meters and strengthening junctions with horizontal diagonal braces.
Structural Analysis
The analysis includes maximum load capacities and height adjustments for the TF2 Shoring Tower, advising on distributing load adjustments to maximize load capacity on the legs.
Application Examples
Examples demonstrate the system's versatility in positioning the tower for heavy and light loads in different scenarios.
Assembly Instructions
Detailed steps for assembling stair brackets, railings, and additional sections are provided, emphasizing the correct orientation of diagonal braces and the use of specific components for secure assembly.
Anchoring and Safety
The stair tower is anchored to the structure using scaffolding tubes and couplers, with the number of anchor points varying based on the tower's height and enclosure type.
Material List
A comprehensive list of materials and components required for different tower heights ensures all necessary items are accounted for during assembly.
Component Specifications
Specifications for base frames, adjustable heads, braces, couplers, and other components are detailed, including weights and dimensions.
Loading Capacities
Loading capacities for different tower heights are provided, indicating the number of pieces per 40” container.
Contact Information
Address: Via Achille Grandi, 7 - 20097 San Donato Milanese (Milano) - Italy
See more

Catalog excerpts

TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-1

TOWER SHORIN G SYSTEM TF2 STAIR TOWER TF2 TORRI DI PUNTELLAZIONE TF2 TORRE SCALA TF2

 Open the catalog to page 1
TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-2

AVVERTENZE SULLA SICUREZZA SAFETY WARNINGS • The respect of these instructions does not exempt from compliance with all safety regulations in force in the country where you use the system. • These instructions are intended for users of TF products and systems. Each one must be aware of the contents of this manual; in case they have difficulties in reading the same, the employer has to provide education of the same • The User’s Manual instructions must always be available at the workplace for all operators • This manual, even if used in order to draw up a Method Statement, will not substitute...

 Open the catalog to page 2
TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-3

TOWER SYSTEM DESCRIPTION 4 TOWERS STRUCTURAL ANALYSIS 15 TOWERS APPLICATION EXAMPLES 17 STAIR TOWER SYSTEM 18 DESCRIPTION STAIR TOWER ASSEMBLING 20 STAIR TOWERS ANCHORING 25 STAIR TOWERS MATERIAL LIST 26 CARATTERISTICHE TECNICHE 6 ADATTAMENTO A GEOMETRIA 8 E PESO DEL SOLAIO ASSEMBLAGGIO TORRI 9 ASSEMBLAGGIO VERTICALE 10 ASSEMBLAGGIO ORIZZONTALE 11 TRASLAZIONE TORRI 13 DIMENSIONAMENTO STRUTTURALE 15 ESEMPI APPLICATIVI TORRI 17 DESCRIZIONE DEL SISTEMA 18 TORRE SCALA ASSEMBLAGGIO TORRE SCALA 20 ISTRUZIONI 21 ANCORAGGIO TORRE SCALA 25 LISTA MATERIALE TORRE SCALA 26 LISTA COMPONENTI 27...

 Open the catalog to page 3
TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-4

Detail of connection coupler Particolare inserto di collegamento telai Variable pitches between frames | Passo variabile tra i telai: 50, 100, 125, 152, 175, 200, 225, 250 cm Frame height | larghezza telaio: 152 cm (fixed | fissa)

 Open the catalog to page 4
TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-5

TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2 | TORRI DI PUNTELLAZIONE TF2 / TORRE SCALA TF2 SYSTEM DESCRIPTION TF 2 Shoring Towers accomplish to “heavy” tasks with a safe, strong and flexible system. Considerable loads, challenging heights, huge areas are the main working fields of TF 2 shoring system; used as simple shoring or as a table system, it ensure a fast, safe and economical formwork solution. Any TF 2 components are made by hot deep galvanized high quality steel, ensuring the system high loadability and a long life span. Le torri di carico TF 2 compongono il sistema ideale per carichi...

 Open the catalog to page 5
TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-6

TECHNICAL FEATURES CARATTERISTICHE TECNICHE Hereunder the system components in detail, any of wich fulfill the system high loadability, up to 60 kN per leg; one tower to support loads up to 240 kN! A seguire I componenti di sistema in dettaglio, ognuno dei quali soddisfa l’alta portata del sistema, sino a 60 kN per stelo;una torre per supportare carichi sino a 240 kN! JACK HEAD & FOOT SPINDLES | PIEDE E TESTA REGISTRABILI Final fine heights adjustments are easily executed through Jackheads and Foot spindles, available in 2 sizes in order to optimize the system height adaptability. Made by High...

 Open the catalog to page 6
TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-7

TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2 | TORRI DI PUNTELLAZIONE TF2 / TORRE SCALA TF2 HORIZONTAL & DIAGONAL BRACES | ASTE ORIZZONTALI E DIAGONALI Horizontals and diagonals braces size range is studied in order to offer the right combination for the optimal configuration ensuring the right loadability and most efficient system geometry. Le misure delle aste di collegamento orizzontali e diagonali sono studiate per permettere la configurazione di sistema ideale per le portate necessarie e la più efficiente geometria di Sistema. FRAME CONNECTORS | INSERTI DI COLLEGAMENTO Frame connectors, with...

 Open the catalog to page 7
TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-8

GEOMETRIC & LOAD ADAPTABILITY | ADATTAMENTO A GEOMETRIA E PESO DEL SOLAIO Following some examples showing how to adapt the system to any site conditions, based on slab’s geometry, weight and height. Single or “connected” Towers, with a modular span given by system components geometry, other than the possibility to assemble the upper structure as “ready to use” slab tables, offer a perfect material quantity optimization. When slabs loads become relevant, the span between towers legs have to be reduced, and that’s easily done by combining the right system components (shorter horizontal and diagonal...

 Open the catalog to page 8
TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-9

TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2 | TORRI DI PUNTELLAZIONE TF2 / TORRE SCALA TF2 TOWERS ASSEMBLING ASSEMBLAGGIO TORRI TF 2 system can be assembled in 2 main ways: vertical or horizontal; the choosen one have to comply with site conditions and working cycles, but in general the “Horizontal” one offer an higher safety for all people involved, avoiding many dangerous operations at height where workers should operate only wearing safety harness. Il Sistema TF 2 può essere assemblato principalmente in 2 modi: verticale od orizzontale; il metodo prescelto deve necessariamente tener conto delle...

 Open the catalog to page 9
TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-10

VERTICAL ASSEMBLING | ASSEMBLAGGIO VERTICALE Always to ensure a proper tower anchorage to the ground or near structures in order to guarantee the necessary stability during the assembling, other than provide any necessary safety device as safety harness for all working staff members Assicurare sempre un adeguato ancoraggio delle torri a terra o su strutture vicine per garantire la necessaria stabilita’ del sistema durante il montaggio, oltre a provvedere ad ogni dispositivo di sicurezza necessario come imbracature di sicurezza per tutti i componenti dello staff di lavoro When the planned height...

 Open the catalog to page 10
TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-11

TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2 | TORRI DI PUNTELLAZIONE TF2 / TORRE SCALA TF2 HORIZONTAL ASSEMBLING | ASSEMBLAGGIO ORIZZONTALE As per the vertical assembling, also the horizontal assembling will request the same operations steps, starting from Foot Spindles insertion and fixing, followed by horizontal and diagonal braces fixing to frames and the final Jack Heads insertion. Come per il montaggio in verticale, anche procedendo in orizzontale la serie di operazioni necessarie sarà la stessa, partendo dall’inserimento dei Piedi Registrabili nei Telai, passando per il collegamento dei...

 Open the catalog to page 11
TOWER SHORING SYSTEM TF2 / STAIR TOWER TF2-12

HORIZONTAL ASSEMBLING | ASSEMBLAGGIO ORIZZONTALE Completed the assembling phase, the whole Tower can be lifted and afterwards shifted in “working position” by Lifting Straps connected to a crane. Completata la fase di assemblaggio della torre, la stessa può essere sollevata e traslata in posizione di lavoro mediante l apposite Cinghie di Sollevamento manovrate con gr