Catalog excerpts
EN Version Edition: March 2019
Open the catalog to page 1End users need to observe some maintenance precautions in order to keep structures' original characteristics over time. If carried out with a certain periodicity, these operations make it possible to preserve and to extend greenhouses duration. The correct and good use of greenhouses can be obtained by following a few short rules, applicable both to their structural elements and to sheeting films.
Open the catalog to page 22. CHECKS ON ELETRICAL EQUIPMENTS 3. MAINTENANCE ON MOVING PARTS 4. REGULAR CHECKS & END WORKS PRECAUTIONS STRUCTURE MAINTENANCE
Open the catalog to page 3Remove accumulated debris (leaves, branches, sand, etc.) especially from the gutters. If not removed, these residues could fix humidity and foster biodegradation; Avoid to drain and to treat crops with aggressive chemical solutions, as they can lead to the formation of highly corrosive wet areas. It is better to protect the exposed parts of the structure with bituminous products; At least every two years, it is advisable to check whether the tar applied at the end of the assembly is still present on the pillars of the structure. If not, apply it again in order to avoid corrosive effects. 2....
Open the catalog to page 4Check the level of tightness of the toothed pinions on the transmission tubes and adjust the motor-driven limit switches; Check that the rolling pipe is still straight without significant waves forming, otherwise unroll the pipe and fix it again using appropriate clips; In case of excessive noise during the windows opening phase, grease the teeth of the racks with special spray greases, so that to avoid the formation of dust; Lubricate the carriages of the sliding door guides; For an optimal closing, it is good practice to check the register of the racks on windows' ledges, when reaching...
Open the catalog to page 51. CORRECT USE OF FILMS DURING THE INSTALLATION PHASE 2. SHEETING FILMS SAFEGUARD
Open the catalog to page 6Store the film horizontally away from heat and light, and leave it in the original packaging. In general, after the delivery, it is good practice to protect all the material from rain and sunlight; Make sure the film was assembled no later than 6 months after the delivery; Perform the installation in good weather (temperature between 10 and 25 ° C) and in the absence of wind; Respect the assembly direction (Internal / External) for specific treatments that are carried out in the various layers (anti-condensation, anti-dust); Stretch the film in a sufficient way so that to avoid shaking; The...
Open the catalog to page 7WHAT TO DO IN CASE OF WIND r ^ SAFETY OPERATIONS
Open the catalog to page 8Europrogress s.r.l meets the requirements of UNI EN ISO 9001:2015. The certification ensures a perfect synchronization in the process steps as well as safety and quality of the services. Quality ceritifcation allows Europrogress a quick, orderly, secure and reliable growth. COPYRIGHT Europrogress S.r.l. - All rights reserved | IT/EN Version EUROPROGRESS Europrogress S.r.l. Via per Concordia, 20 - 41037 Mirandola (MO) - Tel. +39.0535.26090 - Fax +39.0535.26379 info@europrogress.it - www.europrogress.it
Open the catalog to page 9All Europrogress catalogs and technical brochures
-
MULTI
16 Pages
-
UP & DOWN SYSTEM
12 Pages
-
TUNNELS
8 Pages
-
Multimed
2 Pages
-
Company profile
12 Pages
-
Catalogue
18 Pages