EFFISUS focuses on delivering customized and user-adapted products with a project-by-project approach. This method considers every detail to reduce application time and human errors, enhancing quality and efficiency.
Challenges in On-Site Construction
  • Weather conditions such as rain, cold temperatures, and humidity.
  • Inconsistent workmanship.
  • Limited access and space.
To mitigate these issues, work is transferred to a controlled factory environment.
Methodology
EFFISUS employs a specific methodology tailored to client needs, leveraging available technology to provide an Added Value Solution.
Case Studies
  • Colón, Madrid: 365 windows with various aluminum frames were addressed using Effisus Pre-Fab Frames.
  • Sways, Paris: 859 windows with different frames were solved with bespoke pre-fabricated corners and pieces.
  • Clatterbridge Hospital, Liverpool: Steel posts were sealed using Effisus Pre-Fab Sleeves.
  • La Poste du Louvre, Paris: Aluminum frames were sealed with Effisus Pre-Fab Frame.
  • Hudson Yards, New York City: Steel beams on a balcony were sealed with Effisus Pre-Fab Sleeves.
  • First Street, Manchester: EPDM strips were combined with Effisus Pre-Fab Corner.
  • Broad Street, Birmingham: Existing gaskets were vulcanized with Effisus Pre-Fab Truseal (3D).
Conclusion
EFFISUS's approach to prefabrication and off-site construction addresses common on-site challenges, providing efficient and high-quality solutions tailored to specific project needs.
See more

Catalog excerpts

PRE-FABRICATION SOLUTIONS: Guidance-3

guidance for consultants/architects facade weatherproofing . prefabrication/off-site construction View on the website EFFISUS is being focused on delivering a personalized and user adapted product combined with a project by project approach. In each project, each detail is taken into consideration to drastically reduce the application time and human errors leveraging quality and efficiency. Some specific works are almost impossible to be correctly performed at site and there are many external factors that condition the work and hinder the process, which puts at risk the final quality of the whole...

 Open the catalog to page 3
PRE-FABRICATION SOLUTIONS: Guidance-4

Sways, Paris Situation 365 windows with 8 different aluminum frames dimensions and shapes. Solution Effisus Pre-Fab Frames – one solution for all type of windows. Southbank Place, London Situation 859 windows with different aluminum frames dimensions and shapes. Solution Bespoke pre-fabricated corner and pre-fab pieces.

 Open the catalog to page 4
PRE-FABRICATION SOLUTIONS: Guidance-5

PRE-FABRICATION TECHNOLOGY AROUND THE WORLD Clatterbridge Hospital, Liverpool Situation sealing of coping steel posts. Solution Effisus Pre-Fab Sleeves with an open joint to be applied around the steel posts.

 Open the catalog to page 5
PRE-FABRICATION SOLUTIONS: Guidance-6

Hudson Yards, New York City Situation Sealing the steel beams on the triangle balcony. Solution Effisus Pre-Fab Sleeves applied around the steel beams. La Poste du Louvre , Paris Situation Sealing of coping steel posts. Solution Effisus Pre-Fab Frame around the aluminum frame. .06

 Open the catalog to page 6
PRE-FABRICATION SOLUTIONS: Guidance-7

First Street, Manchester Situation 2 single EPDM strips vulcanized in one side. Solution Combination of EPDMs strip vulcanized and Effisus Effisus Pre-Fab Corner. Broad Street, Birmingham Situation vulcanisation of existing gaskets and creation of additional cornering. Solution Effisus Pre-Fab Truseal (3D) hot vulcanized .07

 Open the catalog to page 7