Introduction
Ecotherm insulation is a high-quality product, and its performance is highly dependent on proper installation. For further assistance, contact customer support at 0800 400 326 or visit the website.
Storage and Safety
Store Ecotherm insulation under cover and upright to prevent compression. Protect from moisture, dirt, and dust. While protective clothing is not essential, it is recommended, especially for retrofit installations.
Pre-Installation Checks
  • Ensure installation areas are clean and free of debris.
  • Check that framing moisture content is 20% or less.
  • Verify that wall wrap, building paper, or roof underlay is undamaged.
  • Ensure exterior cladding is weathertight and thermal breaks are installed for steel framing.
  • Turn off power when installing in sub-floor areas.
Tools Required
Necessary tools include a tape measure, sharp scissors or rotary cutter, staple gun, ladder, and a light for ceiling installations.
Installation Procedures
  • Opening the Pack: Split the plastic wrapping lengthwise to allow the insulation to expand.
  • Cutting to Size: Cut slightly oversized for a tight fit. Use scissors or a sharp knife for trimming.
  • General Instructions: Maintain clearances around metal flues and recessed lights. Follow NZS 4246 standards.
Specific Installation Instructions
  • Walls: Measure, cut, and friction fit Ecotherm between wall framing. Staple to prevent slumping.
  • Ceilings: Install as a single or double layer, ensuring no gaps or compression. Follow NZS 4246 for details.
  • Mid Floor: Roll out and fit between floor joists, securing with staples.
  • Underfloor: Fit between joists, ensuring no air gaps. Use stainless steel staples in coastal areas.
Installation Standards
All installations should comply with manufacturer instructions and NZS 4246 standards. Eco Insulation provides trained installers to ensure compliance.
See more

Catalog excerpts

EcothermTM  Installation Guide-1

Ecotherm™ Installation Guide Ecotherm insulation is a quality product. The quality of the installation determines the level of performance that can be achieved with Ecotherm insulation. Ecotherm — Customer support For additional information on Ecotherm insulation installation, call toll free 0800 400 326 Store Ecotherm insulation: • Under cover, on end to avoid compression. ■ Protect from moisture dirt and dust if opened Ecotherm - Safety When working with Ecotherm insulation protective clothing and equipment is not essential but is recommended, particularly in retrofit installations. Ecotherm - Before installation check Areas where Ecotherm insulation is to be fitted are clean and free of dust Framing has a moisture content of 20% or less Wall wrap, building paper or roof underlay is undamaged Exterior cladding is weathertight Thermal breaks are installed for steel framing Power has been turned off when installing in the sub-floor. The Ecotherm insulation is as specified.

 Open the catalog to page 1
EcothermTM  Installation Guide-2

Ecotherm - Tools Tools required to install Ecotherm insulation are a tape measure, sharp scissors or rotary cutter, staple gun, ladder and a light (for ceiling installations). Ecotherm - Opening the pack Split the plastic wrapping lengthwise- Ecotherm insulation is compressed during packing and will expand on being released. Ecotherm - Cutting to size Always cut Ecotherm slightly oversized to ensure a tight friction fit. Ecotherm rolls can easily be torn across the width by hand. Trimming down the length of the roll can be done using sharp scissors or by compressing the insulation under a timber...

 Open the catalog to page 2
EcothermTM  Installation Guide-3

Ecotherm — Installing Ecotherm in ceilings Ecotherm can be installed as a single layer either over perpendicular ceiling joists, between ceiling joists or as a double layer with the first layer installed between the ceiling joist ad the second layer over the top at right angles to the first layer. Unroll the full length of the insulation, fold in half lengthwise and feed the insulation through Starting from the outside edge furthest from the hatch and working towards the hatch, lay the Ecotherm over the whole ceiling at right angles to the ceiling joists. Where roll lengths are butted to form...

 Open the catalog to page 3
EcothermTM  Installation Guide-4

Ecotherm — Installing Ecotherm underfloor Ecotherm Underfloor is designed to be installed between timber floor joists. Begin installing in the further most corner of the floor. Fit the roll between the floor joists and adjust so the side edges are equal. Ecotherm Underfloor is should be installed touching the underside of the floor, but not compressed. Ecotherm Underfloor is designed to be wider than the joist cavity; excess material should be folded down on each side and stapled at 150mm centres Ecotherm Underfloor should be pulled tight between the joists to ensure there is no air-gap or air...

 Open the catalog to page 4
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.