video corpo

SYS-FAST

SYS-FAST

SYS-FAST

Product catalog summary
Overview: The SYS-FAST steel rolling towers system by DACAME offers the benefits of modular scaffolding with compatibility and high-strength, lightweight frames. It is designed for simplicity, speed in assembly, and security, adhering to EN1004 and EN 1298 standards.
Main Characteristics:
  • Frames made from Ø 48 mm structural steel tubes with ledgers every 50 cm.
  • Versatile system adaptable to various working heights.
  • Hot dip galvanized components with a minimum thickness of 75 microns.
Components:
  • Scaffold Frames: Available in 1 m and 2 m heights, with rosettes for connecting ledgers and diagonals.
  • Guardrails: Made from Ø 48 mm pipe, hot dip galvanized.
  • Diagonal Braces: Provide stability and bracing, available in various lengths.
  • Planks: Fixed and access planks comply with EN 12811 standards, featuring anti-slip surfaces.
  • Ladders: Manufactured according to EN 131 standards, available in aluminium and steel.
  • Toe Boards: Made of anti-humidity wood, designed for side protection.
  • Casters and Screw Jacks: Swivel casters with brake systems for stability.
Assembly Procedure:
  1. Insert casters into the frame and ensure brakes are activated.
  2. Join frames with ledgers and diagonal braces for stability.
  3. Place platforms and secure with safety locks.
  4. Install guardrails and toe boards for safety.
Configurations:
  • SYS-FAST 4-ECO, 5-ECO, and 5-PLUS configurations offer varying working heights and weights.
  • Maximum work height is 6.60 m with a working surface area of 2.7 m².
  • Complies with EN 1004:2006 for working load and EN 1298:1996 for instructions.
Contact Information: DACAME, S.L., Tarragona, Spain. Phone: +34 977 71 70 04, Email: [email protected]
See more

Catalog excerpts

SYS-FAST-1

Steel Rolling Towers

 Open the catalog to page 1
SYS-FAST-2

STEEL ROLLING TOWERS SYS-FAST STEEL ROLLING TOWERS The rolling towers system SYS-FAST is characterized by offering all the advantages of the modular scaffolding system and it is fully compatible with this system, too. It also has a wide range of high-strength and low weighted frames. The main characteristics are: • Excellent balance between weight and performance. Frames manufactured with structural steel tube Ø 48 mm in diameter, with ledgers every 50 cm. • Simplicity and speed when assembling. A reduced number of references facilitate the understanding of the system keeping versatility to adapt...

 Open the catalog to page 2
SYS-FAST-3

Round tube 0 48 mm steel uprights available in 135 cm width. Ledgers every 50 cm provide system versatility in the height of the platforms. Available in the following heights: 1 m and 2 m. They have rosettes for connecting the ledgers and the diagonals of the modular scaffolding MEKA 48 every meter as well as a galvanized snap pin. Hot dip galvanized, minimum thickness of 75 microns. Manufactured with 0 48 mm pipe, they have articulated locks on both ends. They full-fill the function of bracing the frames and they also act as stabilizers in very high towers. Hot dip galvanized.

 Open the catalog to page 3
SYS-FAST-4

STEEL ROLLING TOWERS FIXED STEEL PLANKS Planks manufactured in accordance with the EN 12811 standards. An extremely resistant perforated working surface manufactured with antislip grooves. The 2 welded tubes make them easy to handle. Width: 30 cm. Hot dip galvanized and with a minimum thickness of 75 microns. They comply with the 12810-2 fall arrest system requirements.

 Open the catalog to page 4
SYS-FAST-5

j SCREW JACK CASTERS AND SCREW JACK BASE Swivel casters with a brake system, available for different load capacities. The screw jack base 1.0 m with 2 levers is used for stabilizing towers, mainly combined with brackets or stabilizers composed by a base collar, a ledger and a diagonal brace. Cold galvanized. Description Weight (kg) Max. Reg. (cm) Part No. j SCREW JACK HOLDER The jack holders allow holding the casters of the towers to make the lifting operations safely. They connect to the vertical tube of the frame with a clamp and have two handles made of round bars to hold the caster handle....

 Open the catalog to page 5
SYS-FAST-6

STEEL ROLLING TOWERS ASSEMBLY PROCEDURE - SYS-FAST (5-PLUS) Insert the casters at the bottom of the 2 m frame. Leave the frame on the floor and face the casters onto the tube. The casters must have the brake device activated. Then, while an operator holds the frame upright, the other places a bubble level and verifies the horizontal of the frame transom regulating the handles of the casters. Then, assemble the jack holders at the lower ends of the frame. You must have a ratchet to tighten the clamp nut. Hit the pin of the rosettes with a hammer to connect the 2 m ledgers as well as the 2 m guardrails...

 Open the catalog to page 6
SYS-FAST-7

• Maximum work height: 6.60 m (for greater heights, please contact our Technical Department). • Working surface area: 1.35 x 2 m = 2.7 m2. • Working load: 2kN /m2 (Class 3) , EN 1004:2006. • Instruction manual in compliance with EN 1298:1996. SYS-FAST - CHARACTERISTICS (*) Heights with the caster spindle fully extended and, in brackets, the height with the caster spindle fully retracted.

 Open the catalog to page 7
SYS-FAST-8

Ctra. Santa Bárbara - La Sénia, km 4,6 Tarragona - SPAIN Modular scaffold MEKA 48 Aluminium rolling tower ALU 50 Sectional scaffold SECUS Rolling tower SYS-FAST Ladder frame scaffold Rolling tower MEKA 48 European frame scaffold DINO 48 Multipurpose tower European frame scaffold FREE 48 Stages, ramps & grandstands. Access towers

 Open the catalog to page 8

All DACAME catalogs and technical brochures

  1. ALU 50

    8  Pages

  2. Duo 45

    6  Pages

  3. Dino 48

    16  Pages

  4. MEKA 48

    20  Pages

  5. Product list

    52  Pages

  6. LIFTING

    24  Pages

  7. EQUIPMENT

    20  Pages

  8. PROPS

    4  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.