1. Catalogs
  2. CS - Construction Specialties
  3. Palomar Medical Center Case Study

Palomar Medical Center Case Study
1 /2Pages

Palomar Medical Center Case Study

Palomar Medical Center Case Study
1 /2Pages

Catalog excerpts

Palomar Medical Center Case Study-1

Palomar Medical Center Products: Acrovyn® 4000 Rigid Sheet, Crash Rails, Corner Guards & Handrails; Pedimat® & PediTred® LP Entrance Flooring; Storm Resistant Louvers & Thinline Louvers As one of the country’s largest hospital construction projects and the first new North County hospital in 30 years, the 56-acre campus has already captured the attention of healthcare professionals worldwide for its use of nature, light and space — all designed to speed healing. Design Goals Palomar Medical Center, completed in August 2012, incorporates cutting-edge sustainable design to create a high-performance healing environment. Improving access to care and operational effectiveness through sustainable design were at the forefront of CO Architects’ design goals. The 740,000-square-foot, 11-story nursing tower contains 288 beds and incorporates various innovative architectural facets, aspiring to be the quintessential “hospital of the future.” The ecologically regenerative, 1.5-acre green roof and garden spaces featured on each level of the nursing tower are flush with drought-resistant vegetation, allowing for beautiful south-facing patient room views. The architectural and medical planning design strove for and surpassed sustainable goals by including a full complement of water conservation, energy-saving measures and air quality improvements. Palomar Medical Center is one of just two hospitals in the United States that bring natural light into operating rooms. It was planned before the LEED® for Healthcare (LEED-HC) standard was approved and was designed to the Green Guide for Health Care standards, which has further developed into the now approved LEED-HC. The hospital was designed for simple adaptation of future space remodeling and technology needs over the next few decades. • Wall protection in Cradle to Cradle CertifiedCM Gold & Silver Acrovyn 4000 as well as Renaissance hardwoods and stainless steel • Cradle to Cradle CertifiedCM Silver C/S Pedimat® and PediTred® LP entrance grids • C/S Storm Resistant Louvers, tested and certified by AMCA and tested to BSRIA standards, and C/S Thinline Louvers Creating a high-performance healing environment meant selecting known healthy building products. Construction Specialties (C/S) products were chosen by CO Architects and integrated into the facility because of the products’ high material health standards and ingredient transparency, which ensured designers and healthcare officials that selected products had eliminated chemicals of concern. C/S products included were entrance flooring, rigid sheet, crash rails, corner guards, handrails and architectural louvers.

 Open the catalog to page 1
Palomar Medical Center Case Study-2

CO Architects sought healthy materials and, therefore, selected Cradle to Cradle CertifiedCM Gold or Silver Acrovyn® 4000 wall protection which is free of PVC (polyvinyl chloride), PBTs (persistent bioaccumulative toxins), BPA (bisphenol A) and all halogenated fireretardants. Since medical facilities are subjected to daily abuse, the Acrovyn® 4000 line was deemed best suited for the project, providing not only a layer of protection to the facility, but also a variety of color and material combinations that offer design flexibility. Entrance Flooring Pedimat® and PediTred® LP were chosen based...

 Open the catalog to page 2
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.