constructiv PON Office
1Pages

{{requestButtons}}

Catalog excerpts

constructiv PON Office - 1

The most important constructive elements of the system, besides tubes and static elements, are connectors. They ensure a variety of possible applications and freedom of design. A©Burkhardt Leitner constructiv 2014 | www.burkhardtleitner.de | As at: 29.04.2014 burkhardt leitner modular spaces_woridwide

Open the catalog to page 1

All Burkhard Leitner catalogs and technical brochures

  1. Clic office

    8 Pages