1. Catalogs
  2. BEHR
  3. BEHR PREMIUM® Granite Grip™

BEHR PREMIUM® Granite Grip™

BEHR PREMIUM® Granite Grip™

Product catalog summary
Product Overview: This document provides instructions for the application of a concrete surface coating product, emphasizing the need for two coats and the use of a 1/4” adhesive roller cover. It is suitable for interior and exterior porous surfaces like concrete, masonry, stone, and brick, particularly on horizontal surfaces such as walkways, patios, porches, and pool decks.
Usage Restrictions: The product should not be used on vertical surfaces, areas with hydrostatic pressure, industrial areas, or drivable surfaces like garage floors and driveways. Surfaces may become slippery when wet.
Surface Preparation: All surfaces must be clean, dry, and free of contaminants. New concrete or masonry should cure for 30 days and be etched to a texture similar to 150 grit sandpaper. Previously coated surfaces should be cleaned, and failing coatings removed.
Application Instructions: Do not thin the product. Intermix cans for color uniformity and apply when temperatures are between 50-90°F. The first coat acts as a base and should not completely cover the surface. Apply in 4’ x 4’ sections, allowing the first coat to dry before applying the second. Additional coats may be needed for imperfections or dark colors.
Dry Time: The product requires longer drying times in cooler temperatures and higher humidity. Light foot traffic is permissible after 24 hours, with heavy traffic allowed after 72 hours.
Clean-Up and Disposal: Wait 30 days before cleaning with mild detergent. Avoid abrasive cleaners and pressure washers. Dispose of soiled rags properly and contact local services for product disposal.
Health and Safety Warnings: The product may release lead dust if old paint is removed. Lead is toxic, and exposure can cause serious health issues. Use a NIOSH-approved respirator and follow safety guidelines. The product is an irritant and harmful if swallowed. Ensure adequate ventilation during use.
Warranty: Behr Process Corporation offers a limited warranty covering manufacturing defects, excluding labor costs and incidental damages. Specific legal rights may vary by state.
Additional Information: The product revives concrete surfaces, provides a durable finish, fills hairline cracks, and resists dirt and stains. It is available in custom colors with a spread rate of 40-60 sq. ft. per gallon, depending on surface texture.
See more

Catalog excerpts

BEHR PREMIUM® Granite Grip™-1

Granite Grip™ • • • • • Spread Rate: Rough 40-50 Sq. Ft. Smooth 50-60 Sq. Ft. Revives Concrete Surfaces Durable, Protective Finish Available in Custom Colors Fills in Hairline Cracks Resists Dirt, Grease & Household Stains Dry Time: 1 Hr. Dry to Touch 3-4 Hr. Recoat IMPORTANT! DO NOT OPEN CONTAINER WITHOUT READING INSTRUCTIONS. 2 COATS REQUIRED. USE WITH 1/4” ADHESIVE ROLLER COVER. WHERE TO USE On Interior/Exterior surfaces such as: Porous Concrete, Masonry, Stone and Brick. Ideal for horizontal surfaces such as: Walkways, Patios, Porches and Pool Decks. WHERE NOT TO USE DO NOT use on vertical surfaces or areas subject to hydrostatic pressure. NOT for industrial use or areas subject to forklifts. Do not use on drivable surfaces such as garage floors and driveways. Surfaces may become slippery when wet. Use caution when walking on surface when moisture is present. PREPARATION† (Proper surface preparation is required.) All surfaces must be clean, sound, dry and free of any dirt, oil, and grease. Uncoated Concrete or Masonry Surfaces: Allow new surfaces to cure 30 days. Clean and etch surface using a product such as a muriatic acid etcher (read and follow all manufacturer’s label directions) to achieve a textured profile similar to 150 grit sandpaper. Previously Coated Surfaces: For a painted surface in sound condition, use a product to clean and prepare the surface. If the coating is failing or peeling, use a paint stripper to remove old coating or scrape/sand down to a sound concrete surface. Scuff sand glossy surfaces. Clean and spot etch any exposed concrete. Remove all dust with a damp cloth, allow to dry. APPLICATION DO NOT THIN. Intermix all cans of same product to ensure color uniformity. Stir before applying. Use product when air and surface temperatures are between 50-90° F. Do not apply in direct sunlight. For hairline cracks up to 1/8", completely fill in with coating using a nylon/polyester brush and allow to dry completely prior to roller application. Apply a first coat using LIMITED WARRANTY Behr Process Corporation warrants that this product meets Behr’s manufacturing specifications. If this product is found not to meet our manufacturing specifications upon inspection by our representative, Behr Process Corporation will, at its option and upon presentation of proof-of-purchase (the original receipt), either furnish an equivalent amount of new product or refund the original purchase price of this product to you. This warranty excludes (1) labor and costs of labor for the application or removal of any product, and (2) any incidental or consequential damages, whether based on breach of express or implied warranty, negligence, strict liability or any other legal theory. Some states do not allow the exclusion or limitation of incidental or consequential damages, so the above limitation or exclusion may not apply to you. This warranty gives you specific legal rights and you may also have other rights, which vary from state to state. To consult with a BEHR Certified Coatings Professional, call 1-800-854-0133 Ext. 2 (U.S.A. only). ©2015 Behr Process Corporation Santa Ana, CA 92704 U.S.A. • behr.com V.O.C. (C.O.V.) <50 g/L) • REV. 9/15 Clean-Up: Soap & Water a 1/4" adhesive roller cover, nylon/polyester brush or synthetic stain pad. NOTE: The first coat will act as the base coat and it will not completely cover the surface by design. Avoid over application on the first coat. Apply in 4’ x 4’ sections. Begin with the roller in the center of the section and roll outwards in random directions. Avoid regular patterns and knock down hard edges using the roller. Allow first coat to dry then apply second coat in the same method as the first coat. While two coats are necessary, additional coats may help hide previous surface imperfections or cover over dark colors. For large projects, consider using a texture sprayer with a 4mm tip. Spray in 4’ x 4’ sections and back roll with an adhesive roller cover. DRY TIME Longer dry time required in cooler temperatures and in higher humidity. The floor may be subjected to light foot traffic after 24 hours. Allow 72 hours before subjecting surface to heavy foot traffic or repositioning furniture. Premature heavy traffic will cause paint failure requiring spot recoating. CLEAN UP Wait at least 30 days before rinsing or cleaning. Use a mild detergent as needed. Abrasive cleaners and pressure-washers should be used carefully to avoid premature coating failure. DISPOSAL Properly dispose of all soiled rags. To recycle or properly dispose of product in your community, contact your household refuse collection service WARNING! If you scrape, sand or remove old paint, you may release lead dust. LEAD IS TOXIC. EXPOSURE TO LEAD DUST CAN CAUSE SERIOUS ILLNESS, SUCH AS BRAIN DAMAGE, ESPECIALLY IN CHILDREN. PREGNANT WOMEN SHOULD ALSO AVOID EXPOSURE. Wear a NIOSH-approved respirator to control lead exposure. Clean up carefully with a HEPA vacuum and a wet mop. Before you start, find out how to protect yourself and your family by contacting the National Lead Information Center at 1-800-424-LEAD or log on to www.epa.gov/lead. † WARNING! This product contains chemicals known to the state of California to cause cancer and birth defects or other reproductive harm. IRRITANT! HARMFUL IF SWALLOWED. MAY CAUSE EYE, NOSE AND THROAT IRRITATION. AVOID CONTACT WITH SKIN AND EYES AND AVOID BREATHING OF VAPORS AND SPRAY MIST. WEAR EYE PROTECTION AND PROTECTIVE CLOTHING. USE ONLY WITH ADEQUATE VENTILATION. To avoid breathing vapors and spray mist, open windows and doors or use other means to ensure fresh air entry during application and drying. If you experience eye watering, headaches or dizziness, increase fresh air. If properly used, a respirator (NIOSH approved for organic vapor with P series particulate pre-filter) may offer additional protection; obtain professional advice before using. A dust mask does not provide protection against vapors. Avoid contact with eyes and skin. Wash thoroughly after handling. Close container after each use. FIRST AID: If you experience difficulty in breathing, leave the area to obtain fresh air. If continued difficulty is experienced, get medical assistance immediately. In case of eye contact, flush immediately with plenty of water for at least 15 minutes and get medical attention; for skin, wash thoroughly with soap and water. If swallowed, get medical attention immediately. CAUTION: KEEP OUT OF REACH OF

 Open the catalog to page 1
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.