White rooms
1 / 8Pages

Catalog excerpts

White rooms - 1

/ Document Identification ARTICLE ITEM MATERIEL : / Product Installation Guide for Clean Room DESIGNATION : / Designation CLEAN ROOM Installation Guide for clean room baseboard and corner coving Référence : Guide de Pose 2013-04 Ce document est la propriété d’AV Composites. Il ne peut être utilisé, communiqué ou reproduit sans son accord préalable. This document is the property of AV Composites. It can't be used, communicated or reproduced without its writen permission.

Open the catalog to page 1
White rooms - 2

/ Document Identification MATERIEL : / Product Installation Guide for Clean Room DESIGNATION : / Designation CLEAN ROOM SUMMARY Resume………………………………………………………………………………3 1. Corner coving...…………………………………………………………………4 1.1 Fixing of the female part ….………...…….……………………………4 1.2 Fixing of the male part …………...………….…………………………4 1.3 Singular points …………………………………….……………………5 1.3.1 Wall & ceiling junction …………………..……………………..5 1.3.2 Wall & floor junction …………………….……………………..6 1.4 Finishing piece …………………………………………….…………….6 2. Baseboard………………………………………………………………………..7 2.1 Fixing……………………………………………………………………..7 2.2...

Open the catalog to page 2
White rooms - 3

/ Document Identification ARTICLE ITEM MATERIEL : / Product Installation Guide for Clean Room DESIGNATION : / Designation CLEAN ROOM Resume This document outlines the steps to take to fix the baseboards and corner coving for clean rooms, cold rooms, laboratories, and all food-processing room. We recommend to first cut and fit the baseboard and corner coving with finish angles before to permanently fix them to the panels. Recommendations for the screws to be used: Countersunk head self-drilling stainless 35mm length mini Max diameter 4.5mm Screw head diameter less than 8 mm Screw head height...

Open the catalog to page 3
White rooms - 4

/ Document Identification ARTICLE ITEM MATERIEL : / Product Installation Guide for Clean Room DESIGNATION : / Designation CLEAN ROOM 1. Corner coving 4915 EC Male part Fixing of the female part (a) Staggered Pre-drill the female part every 200mm. (b) Fixing to the panel with screws. Fixing of the male part (c) Set the male part on the female part. (d) Paste the flexible lips for sealing with a silicone glue. Référence : Guide de Pose 2013-04 Ce document est la propriété d’AV Composites. Il ne peut être utilisé, communiqué ou reproduit sans son accord préalable. This document is the property...

Open the catalog to page 4
White rooms - 5

/ Document Identification MATERIEL : / Product Installation Guide for Clean Room DESIGNATION : / Designation CLEAN ROOM Singular points 1.3.1 Wall & ceiling junction Panel and ceiling angles junction are using the parts: JS2D - two directions outgoing angle J2D - two directions inside angle J3D - three directions inside angle Ceiling For inside angles (J2D and J3D) these are divided into two parts, the first being screwed to the wall and the second is fixing into the first one. (See figure below) For outgoing angles (JS2D) these come directly on the female part of the corner coving (4404...

Open the catalog to page 5
White rooms - 6

/ Document Identification ARTICLE ITEM MATERIEL : / Product Installation Guide for Clean Room DESIGNATION : / Designation CLEAN ROOM 1.3.2 Wall & floor junction The wall and floor junction is made from AR3D piece. The AR3D piece is divided into two parts. The first one is screwed to the wall and the second is fitting into the first. (See figure below) Finishing piece The 4404 SAN endpiece fit directly into the corner coving. Référence : Guide de Pose 2013-04 Ce document est la propriété d’AV Composites. Il ne peut être utilisé, communiqué ou reproduit sans son accord préalable. This...

Open the catalog to page 6
White rooms - 7

/ Document Identification ARTICLE ITEM MATERIEL : / Product Installation Guide for Clean Room DESIGNATION : / Designation CLEAN ROOM (a) Pre-drilling spacing to the 200mm (b) Mechanical Fastening (c) Mechanical fastening concealed by a hinged cover (d) Paste the flexible lips for sealing with a silicone glue. Singular points -AR2D two directions inside angle -AR3D three directions inside angle -AS2D two directions outgoing angle Référence : Guide de Pose 2013-04 Ce document est la propriété d’AV Composites. Il ne peut être utilisé, communiqué ou reproduit sans son accord préalable. This...

Open the catalog to page 7
White rooms - 8

/ Document Identification MATERIEL : / Product Installation Guide for Clean Room DESIGNATION : / Designation CLEAN ROOM For the inside and outgoing angles they are split into two parts, the first being screwed to the wall and the second is fitting into the first (see figure above). Finishing piece Left or right 44068 endpiece, fixation in the baseboard. Référence : Guide de Pose 2013-04 Ce document est la propriété d’AV Composites. Il ne peut être utilisé, communiqué ou reproduit sans son accord préalable. This document is the property of AV Composites. It can't be used, communicated or...

Open the catalog to page 8

All AV Composites catalogs and technical brochures

  1. LUXURY

    2 Pages

  2. MATRESS

    2 Pages

  3. Skylight

    6 Pages

Archived catalogs

  1. Foam Pannel

    2 Pages