1. Catalogs
  2. AV Composites
  3. foam pannel max

foam pannel max

foam pannel max
1 / 13 PagesView full catalog

foam pannel max

Product catalog summary
Assembly Instructions for Conservatory Roof Panels
1. Layout of the Conservatory Roofing:
  • Size of the Conservatory: Determine the area by specifying the width (l) and length (L) of the conservatory (S = l x L).
  • Panels’ Length: Calculate the roof slope using height measurements (H) with the Pythagorean theorem or tangent method.
  • Number of Panels: Use the formula N = L / 1.2, rounding up for symmetry.
2. Cutting of Panels and Accessories:
  • Lower Wall Hook: Cut to match the width of the conservatory.
  • Junction Key: Cut to panel length plus 10mm to facilitate water flow.
  • Roof Side Closure: Cut to match the conservatory rim, considering curved cuts.
3. Assembly of Aluminium Profile for Lower Wall Hook:
  • Mark the roof height and position the lower wall hook accordingly.
  • Ensure the wall is flat for proper fastening.
  • Use a self-adhesive joint for watertightness and secure with screws or epoxy.
4. Start-up of the Roof with Free-standing Panels:
  • Fitting of First Panel: Start at any gable or central part based on conservatory width.
  • Fastening: Secure panels using self-drilling screws.
  • Junction Key Fitting: Ensure it is over-length for water flow and fit using a rubber mallet.
  • Subsequent Panels: Position and fasten with silicone spray for ease.
5. Coating and Finishing:
  • Sandpit Coating: Use hydrophobic foam joint to prevent dew point issues.
  • Gable Coating: Apply foam joint and aluminium covering for aesthetics and sealing.
  • Wall and Panel Coating: Ensure thermal and watertightness with foam joints and watertightness joint JJ 407.
See more

Catalog excerpts

foam pannel max-1

Technological leader conservatory roofing SSIRVATORY ROOF Authorized distributor: Prize-winner of the national competition of innovative technologies organized by the Ministry of Research and 13210 Saint Remy de Provence Mail: [email protected]

 Open the catalog to page 1
foam pannel max-2

Document Identification GDP AVC 2006-01 DESIGNATION CRF / DEF : A ASSEMBLY INSTRUCTIONS FOR CONSERVATORY ROOF PANELS Product ITEM Indice: Conservatory Roof Panels BE GDP 2006-01 Assembly Instructions for Conservatory Roof Panels 1. Layout of the Conservatory roofing: 1.1. Size of the conservatory : For the construction of a conservatory, please specify the width (l) and the length (L) of the conservatory you want. L l This will allow to determinate the previsted area of the conservatory. S= l x L 1.2. Panels’ length : 1.2.1. Determination of the roof slope : For that, it is necessary to determinate...

 Open the catalog to page 2
foam pannel max-3

Document Identification GDP AVC 2006-01 DESIGNATION CRF / DEF : A ASSEMBLY INSTRUCTIONS FOR CONSERVATORY ROOF PANELS Product ITEM Indice: Conservatory Roof Panels BE GDP 2006-01 LP h H H l The total height of the roofing at the highest point will be H + h. Thus, the slope will be: h/l (in %). Nota: Mind you, it will be necessary to have at least a slope of 10% (that is to say h=1m (mini) for 1=10m). 1.2.2. of the Panels : The calculation of the panels’length can be done in different ways : *** Pythagore : LP = √ (l x l + h x h) *** Tangente : Calculation of the angle in degrees: a = arctang (h...

 Open the catalog to page 3
foam pannel max-4

Document Identification GDP AVC 2006-01 Product ITEM DESIGNATION CRF / DEF : Indice: A ASSEMBLY INSTRUCTIONS FOR CONSERVATORY ROOF PANELS Conservatory Roof Panels BE GDP 2006-01 1.4. Number of panels : The number of N panels will be : Old version : N = L (in m) / 0.82 (round up to the upper figure) New version : N = L (in m) / 1,2 (round up to the upper figure) 2. Cutting of the insulating panels, of the aluminium profile, and accessories: 2.1. Lower wall hook : The aluminium lower wall hook will be cut at the width of the conservatory L: 2.2. Junction key : Make the cut of the junction keys...

 Open the catalog to page 4
foam pannel max-5

Document Identification GDP AVC 2006-01 Product ITEM DESIGNATION CRF / DEF : Indice: A ASSEMBLY INSTRUCTIONS FOR CONSERVATORY ROOF PANELS Conservatory Roof Panels BE GDP 2006-01 It will be necessary to take into account the off cut that is due to the curved cut, and then you will have a sub-length S: 2.4. Insulating conservatory roof panels : Conservatory insulating panels (free-standing) will bec ut at the length LP+10cm mini, integrating a sub-length of about 10cm minimum, to warranty a spillover of the panels regarding the sandpit. Nota : In order to have a good aesthetic value, we recommend...

 Open the catalog to page 5
foam pannel max-6

Document Identification GDP AVC 2006-01 Product ITEM DESIGNATION CRF / DEF : Indice: A ASSEMBLY INSTRUCTIONS FOR CONSERVATORY ROOF PANELS Conservatory Roof Panels BE GDP 2006-01 3. Assembly of the aluminium profile for the lower wall hook: The following operations have to be done : • To mark the conservatory roof height (H+h) on the two extremities • To mark with a chalk line the position of the lower wall hook, taking into account the height of the panels. • Be sure the supporting wall does not have too much irregularities. If so, it will be necessary to modify it with mortar in order to have...

 Open the catalog to page 6
foam pannel max-7

Document Identification GDP AVC 2006-01 Product ITEM DESIGNATION CRF / DEF : • Indice: A ASSEMBLY INSTRUCTIONS FOR CONSERVATORY ROOF PANELS Conservatory Roof Panels BE GDP 2006-01 Make an acrylic mastic joint (or polyurethane or silicon) between the lower wall hook and the wall, on the upper part. 4. Start-up of the roof with free-standing panels: During the start-up of the roof, it will be necessary to remove the safety film on about 5 cm all around the panels, on the 4 sides, in order to remove the whole safety film when the whole conservatory will be finished. 4.1. Fitting of the first free-standing...

 Open the catalog to page 7
foam pannel max-8

Document Identification GDP AVC 2006-01 Product ITEM DESIGNATION CRF / DEF : Indice: A ASSEMBLY INSTRUCTIONS FOR CONSERVATORY ROOF PANELS Conservatory Roof Panels BE GDP 2006-01 On the Top of the Panel: On the Down of the Panel : Référence : Assembly instructions 2005-01 Ce document est la propriété d’AV Composites. Il ne peut être utilisé, communiqué ou reproduit sans son accord préalable. This document is the property of AV Composites. It can't be used, communicated or reproduced without its writen permission. Page 7

 Open the catalog to page 8
foam pannel max-9

Document Identification GDP AVC 2006-01 Product ITEM DESIGNATION CRF / DEF : Indice: A ASSEMBLY INSTRUCTIONS FOR CONSERVATORY ROOF PANELS Conservatory Roof Panels BE GDP 2006-01 4.3. Fitting of the junction key : The junction key chopped at the good length will be fitted into the edge profile of the panel, letting the over-length of 10mm sticking up from the low part of the roof conservatory, to allow the water flow. After having cut the good length of the junction key (7.5linear metre rod), integrating an overlength of minimum 10mm, the different operations you have to do are the following:...

 Open the catalog to page 9
foam pannel max-10

Document Identification GDP AVC 2006-01 Product ITEM DESIGNATION CRF / DEF : Indice: A ASSEMBLY INSTRUCTIONS FOR CONSERVATORY ROOF PANELS Conservatory Roof Panels BE GDP 2006-01 4.4. Fastening of the next free-standing panels : The other panels will be placed according to the following descriptive: • Positioning of the panel on the sandpit and on the lower wall profile. • Lubrication in the inside groove of the edge with a silicone spray (if possible, in order to make easier the fitting) • Positioning of the panel in contact with the previous panel. • Fitting of the panel in the upper part thanks...

 Open the catalog to page 10
foam pannel max-11

Document Identification GDP AVC 2006-01 Product ITEM DESIGNATION CRF / DEF : Indice: A ASSEMBLY INSTRUCTIONS FOR CONSERVATORY ROOF PANELS Conservatory Roof Panels BE GDP 2006-01 4.5. Coating on the sandpit : The coating on the sandpit consists in making the following operations: • Positioning of an hydrophobic self-adhesive foam joint « compriband » of 5x50 on the sandpit profile or a plastic piece, in order to remove the risk of dew point phenomenon. • Positioning of a side closure on the panel extremities with self-drilling stainless steel screws (ex: Self screw SFSSN2/13-7981-3.9x19) NOTA...

 Open the catalog to page 11

Archived catalogs

  1. White rooms

    8  Pages

  2. Foam Pannel

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.