Overview: The Polish company MIKA Sp. z o.o., specializing in the design and production of plastic caps for beverages, required new premises to expand their capacity. They opted for a new facility to manufacture caps for PET bottles.
Construction Solution: MIKA Sp. z o.o. chose an Astron steel building as the most cost-effective solution. They collaborated with INBUD Bielsko sp. z o.o., an Astron Builder, to construct the facility.
Facility Design: The facility includes production, warehouse, and office spaces. It features a 90-meter long building separated by two firewalls, with additional wing units for office spaces along the sidewalls.
Features: To ensure natural lighting and meet security requirements, the building is equipped with numerous smoke vents and skydomes. The production space is optimized for MIKA's advanced production technology.
Outcome: The project met the investor's expectations for a technically demanding building completed in a short timeframe.
See more

Catalog excerpts

Production Facility-1

Production Facility Striking, Affordable Production Building The rapid growth and development of the Polish company MIKA Sp. z o.o. created the need for new premises in order to increase their capacity. The company designs and produces a wide range of plastic caps for carbonated and non-carbonated waters and beverages, so as business boomed, MIKA Sp. z o.o. decided to build a new facility for manufacturing caps for PET bottle. MIKA Sp. z o.o. determined that the most cost-effective solution would be an Astron steel building. It enlisted another Bielsko-Biała-based construction company, INBUD Bielsko sp.z.o.o., an Astron Builder. The company’s wish list included production, warehouse and offi ce spaces. Bielsko sp. z o.o. proposed a complex of 90 m long building separated by 2 firewalls with additional wing units all along the sidewalls for the offi ce part. To provide natural light within the building and to comply with the required security aspects, numerous smoke vents and skydomes were installed. The production space has been optimally designed to suit Mika’s needs to accommodate its advanced production technology. The investor’s hopes and expectation to have its technically demanding building completed in a very short time were fully met! To ensure timely project delivery, improve quality and lower costs, INBUD

 Open the catalog to page 1

All ASTRON catalogs and technical brochures

  1. Car Parks

    12  Pages

Archived catalogs

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.