INSTALLATION INSTRUCTIONS - WOODHAVEN CEILINGS

INSTALLATION INSTRUCTIONS - WOODHAVEN CEILINGS

INSTALLATION INSTRUCTIONS - WOODHAVEN CEILINGS

Product catalog summary
WoodHaven™ Ceiling Planks Installation Summary

Preparation:
Allow planks to acclimate to room humidity by opening cartons 2-3 days prior to installation. Maintain consistent humidity levels throughout the process. Mix planks from different cartons for a uniform look.

Installation Guidelines:
Ensure the installation surface is level and planks can move freely within clips. Maintain gaps around the room perimeter and obstructions, and avoid attaching planks directly to trim or walls. Use expansion joints for spans over 21 feet, covered with trim.

Tools Required:
Hand saw, saber saw, chalk line, screwdriver, dust mask, circular saw, tape measure, drill/screw gun, stud finder, pencil, gloves, safety glasses, straight edge, carpenter's level, string/jet line, screws, glue.

Installation Process:
Use the Easy Up® track and clip system. For ceilings over 21 feet, plan for expansion joints. Install tracks perpendicular to joists, starting 2 inches from the wall, with a maximum spacing of 24 inches. Level tracks using a bubble level and shims. Connect planks using tongue and groove, maintaining a 3/4-inch gap for expansion. Finish with crown molding.

Safety Precautions:
Wear protective clothing, gloves, and safety glasses. Ensure adequate ventilation to avoid inhaling wood dust.

Maintenance:
Clean planks with a damp cloth.

Additional Installation Instructions:
1. Preparing the Installation: Ensure gaps for expansion and contraction, covered by crown molding. Use water-based wood glue on shiplap joints for Item 1149 Bead Board.
2. Installing the First Row: Measure, cut, and install the first row, leaving a 3/4-inch gap at the wall. Use a chalk line and furring strips for alignment.
3. Installing Remaining Planks: Stagger seams and maintain gaps at ends. Use tongue and groove connections, securing with screws or nails.
4. Installing Molding: Choose molding to cover expansion gaps, nailing to wall studs every 24 inches.
5. Large Ceiling Requirements: Use expansion joints with additional support for ceilings over 21 feet.
6. General Installation Guidelines: Do not install over existing acoustical tile ceilings. Use Easy Up® clips for support every 24 inches.
7. Installing on Walls: Planks can be used on walls, with vertical layouts not exceeding 84 inches. Use adhesive for vertical installations and clips for horizontal.
8. Maintenance and Warranty: Clean with a damp cloth and refer to the warranty details online.
See more

Catalog excerpts

INSTALLATION INSTRUCTIONS - WOODHAVEN CEILINGS-1

I N S TA L L AT I O N I N S T R U C T I O N S 5-in x 84-in x 3/8-in 12.7 cm x 213.36 cm x 9.525 mm 10 planks | 29 sq.ft. IMPORTANT INFORMATION • Open cartons 2-3 days prior to the install and allow material to adjust to the relative humidity in the space where it will be installed. Maintain consistent humidity levels after installation. • For the best finished appearance, mix planks from multiple cartons while installing. • Ensure proper gaps are maintained around the perimeter of the room and all obstructions. • Ensure the surface is level and planks are able to slide freely within their clips. • This is a floating ceiling and planks should not be attached directly to trim, molding or walls in a ceiling application. • Never span more than 21-ft without an expansion joint (cove

 Open the catalog to page 1
INSTALLATION INSTRUCTIONS - WOODHAVEN CEILINGS-2

WoodHaven Ceiling Plank Installation Instructions ™ We are constantly working to improve our instructions with learnings from customers like you. If you need additional guidance, call our Techline at 1-877-ARMSTRONG (276-7876). Space Considerations – Before You Begin • The system is a floating system that allows for natural movement of a home. Ensure that the surface is level and planks are able to slide freely within their clips. Unlike lumber, which can twist and warp, this system does not require nails/screws at each edge to stay flat. • Never span more than 21-ft without an expansion joint...

 Open the catalog to page 2
INSTALLATION INSTRUCTIONS - WOODHAVEN CEILINGS-3

GENERAL INSTALLATION In this example, we are installing WoodHaven planks with Easy Up track and clips over unfinished drywall. You can also install planks direct to floor joists or studs, or other existing ceilings, using the same Easy Up tracks. When installing directly to an existing ceiling, find joists and mark with chalk line. (photo A) Running perpendicular to the joists, mark where tracks will be placed. Start 2-in from the starting wall. Spacing is 24-in on center or less. (photo B) Ensure that you do not have tracks running directly over light fixture holes or other ceiling obstructions....

 Open the catalog to page 3
INSTALLATION INSTRUCTIONS - WOODHAVEN CEILINGS-4

Installing WoodHaven Planks Directly to Ceiling Joists with Furring Strips and WoodHaven Clips: ™ LARGE CEILING REQUIREMENT Furring Strip Expansion Joint If your ceiling installation is greater than 21-ft in the length direction of the WoodHaven planks, an expansion joint is required. You will need to plan this detail into the ceiling layout. Expansion joints can be placed more frequently than 21-ft to achieve a balanced visual. A drawing of this detail is shown below. ™ Cut First Border Plank 1. Familiarize yourself with the plank edges and face before you begin cutting your first plank. (illus....

 Open the catalog to page 4
INSTALLATION INSTRUCTIONS - WOODHAVEN CEILINGS-5

(NOT TO SCALE) (NOT TO SCALE) NOTE: A 2-ft x 4-ft system can be converted to a 2-ft x 2-ft system by adding 2-ft cross tees. Determine Your Layout and Size of Your Border Planks. Measure the length of the room, in the direction of your tracks, and opposite the joists, to determine the size of your border planks. Example: Your Room: 1. Total room length Room = 178" _ 6. This is your border Border plank _ plank width width = 4" When starting or ending a WoodHaven Plank installation on 15/16-in suspension system, screw the plank directly to the wall molding. TIP: This should be...

 Open the catalog to page 5
INSTALLATION INSTRUCTIONS - WOODHAVEN CEILINGS-6

TIP: Another option is to use three finishing nails as a ledge, located directly under the face of the plank, on which you can rest the plank while you slide the clips into place. Installing WoodHaven Planks Vertically on a Wall Installing the Remaining Planks Lay out the room with staggered seams. In most installations, you should be able to use the leftover cut plank from one row to start the next row, with very little waste. Do not use planks smaller than 26-in to ensure attachment with two clips. Continue installing the plank by connecting the tongue and groove on the long side and end of...

 Open the catalog to page 6

All Armstrong ceilings - USA catalogs and technical brochures

  1. LEDGES®

    2  Pages

Archived catalogs

  1. LUXE PLANK®

    28  Pages

  2. LUXURY FLOORING

    40  Pages

  3. ABOOK 2018

    47  Pages

  4. METALLAIRE™

    6  Pages

  5. Room dividers

    18  Pages

  6. Tin Look

    4  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.