Industrial Floor Logistic Centers Shopping Malls – Expo Centers Ports – Concrete Roads Airports SLAB JOINT SHRINKAGE - EXPANSION JOINT
Open the catalog to page 1SLAB JOINT After concrete casting After opening of joint (1-3 weeks) 1. Upper Flat Steel ST 37 2. Lower Mould Steel Plate ST 37 (S 235) 3. Anchor Studsı Ø10*100 ST 37 with 250 mm spacing 4. Load Plate and Cover / 8mm ST 52 Steel - Polyamide or ABS Upper Cover 5. Supporting Kit (Optional) ST 37 6. Calibrated Lower Plate (Optional) ST 37 7. Plastic Bolt + Nut Polyamid Arfenslab expansion joints are steel expansion joints that extend the service life ofconcrete slabs carrying high loads.Slab joints can beeasily applied in industrial floors and minimizeuncontrolled crack formation.Steel...
Open the catalog to page 2w w w .ar fe n .c o m ARFEN SLAB JOINT MONTAJ AKSESUARLARI STEEL PLATE SOCKET In order to ensure long-term use of slab joints and high performance, the load transfer must be applied correctly and care should be taken to ensure that both sides of the joint remain at the same level. There are two ways to achieve this for vehicle traffic. Joints must be filled with suitable materials such as mastic and the corners should be reinforced with steel plates. Where concrete slabs are to be cut, the steel sheets on both sides of the joint must be used to protect the edges of the joint. These two...
Open the catalog to page 3w w w .ar fe n .c o m Traditional Joint Installation and Slab Joint Installation Traditional Joint Quantity Length 11, Width 25 Total : 2350 mt Joint Arfen Slab Joint Length 1 , Width 6 Total : 250 mt Joint Concrete Slab System Detail Below is the shrinkage / crack control joint spacing which should be arranged according to the concrete slab thickness. There are two basic methods for controlling and preventing cracks on the concrete surface. The first method is to increase the amount of steel reinforcement that will prevent random crack formation. When cracks are controlled by steel...
Open the catalog to page 4SLAB JOINT SHRINKAGE - EXPANS IONJOI NTS The second and most commonly used method of preventing crack formation and random crack formation is to use Arfen slab joints in concrete slabs. In this method, weak lines are created at predetermined places in the upright, and the concrete is cracked in a straight line along this line. It allows to work without damaging the aesthetic appearance on the concrete surface which cracks down from the concrete surface along this joint. Slab concrete laying is still cracked as normal behavior, but random crack formation is prevented and an unbroken or...
Open the catalog to page 5w w w .ar fe n .c o m ∆L:9,9x10-6*40*30mt=0,01188m(11,88mm).Nonetheless, many international specifications do not find it appropriate to make joints with more than 24 meters clearance. In the case of airport constructions, if the concrete slab thickness is less than 30 cm, the joint interval can be accepted as long as it is between 9 meters and 12 meters and if it is more than 30 cm, the joint interval can be accepted as about 15 meters. (Design of concrete airport pavement -Page 26) Here, the coefficient of 9.9 x10-6 is the coefficient of elongation of one meter section of concrete...
Open the catalog to page 6ARFEN İNŞAAT TAAHHÜT SAN. ve TİC. A.Ş. Atatürk San. Bölgesi Ömerli Mah. Hakkı İleri Cad. Gülce Sk. No:22 Hadımköy -Arnavutköy / İSTANBUL Tel: +90 212 485 16 15 Fax: +90 212 485 16 77 w
Open the catalog to page 7All ARFEN catalogs and technical brochures
-
GLASS RAIL SYSTEMS
20 Pages
-
glass railings systems
7 Pages
-
ARFEN ENTRANCE MAT SYSTEMS
12 Pages
-
WATER ISOLATION PRODUCTS
12 Pages
-
ARFEN MASTER CATALOGUE
268 Pages