A REVOLUTIONARY TOWER ASSEMBLY SYSTEM
Open the catalog to page 1Monte-Tour | A revolutionary tower assembly system
Open the catalog to page 2Traditionally, a shoring tower is assembled from the lowest level upwards, finishing at the top. Alphi offers an innovative way to assemble towers in the opposite direction from traditional assembly. The workers start by assembling the top, and finish at the bottom. The Monte-Tour is compatible with all A120 type ladder towers. Fall from height NF E 85-014 Fall on ground level NF E 85-014 Strenuous positions Manual load handling NF X 35-109 SAFETY AND ARDUOUSNESS PERFORMANCE CHARACTERISTICS All handling operations are carried out by two workers from ground level. Safety is ensured and the...
Open the catalog to page 3Monte-Tour | A revolutionary tower assembly system PRODUCTIVITY The demonstrated increase in productivity is 52%, for both assembly and disassembly. Beyond 6 m, sections can be erected and assembled using a crane. The Monte-Tour can be used in any weather because it is watertight and dustproof. SAFETY Falls from height are eliminated: the worker no longer needs to climb the tower before its assembly is complete. The tower cannot be assembled without all of its safety elements (guardrails, frames, etc.). Disassembly takes place under the same safety conditions. HANDLING Can be used to move...
Open the catalog to page 4SAFETY INSTRUCTIONS The recommendations for handling the Monte-Tour are indicated on the apparatus. ONLY duly authorised operators can use this machine. WEAR PPE: SHOES – HELMETS GLOVES – GOGGLES Keep your distance from the machine work area. Visually inspect the machine in order to detect any damage. Check that there are no obstructions or overhead hazards. USE The machine MUST be stabilised before use. Do not pass under the load. Never move over soil, but only over concrete slabs. The water level bubble should be centred. CRANE HANDLING The water level bubble should be centred. Lower the...
Open the catalog to page 5Monte-Tour WARNING - o use our products safely, please T observe the regulations in force in each country. -T he elements and set-ups presented in this brochure match the characteristics of the equipment on the date of publication of the document. There might have been some changes since then. - The use of our systems in combination with systems from other manufacturers may involve some risk, and would require special inspection. -B efore starting to set up, remember to secure the area. Click here or scan the QR code to view the video of the procedure. USER GUIDE: ASSEMBLY SEQUENCE 1 ÎÎ his...
Open the catalog to page 6- Position a second 1 metre ladder. - Position the ladders in the notches provided in the Monte-Tour forks. - Position the pre-set forks as desired.
Open the catalog to page 7Monte-Tour USER GUIDE: ASSEMBLY SEQUENCE 4 - sing the Monte-Tour, raise the first level until you can insert a second 1 metre ladder. U - ssemble the second ladder level under the first level using pins. A - Repeat the operation for the other ladder.
Open the catalog to page 8- ssemble the guardrails: ensure that the tilting studs lock (automatic). A - osition the working planks in the tower. P
Open the catalog to page 9Monte-Tour USER GUIDE: ASSEMBLY SEQUENCE 8 - epeat operations 4 to 7 to the desired height. R - re-set and position the base jacks on 1.5 metre ladders. P
Open the catalog to page 10- Insert the first 1.5 metre ladder. - Attach the ladder to that of the next level using pins. - Insert the second 1.5 metre ladder. - Attach the ladder to that of the next level using pins.
Open the catalog to page 11Monte-Tour USER GUIDE: ASSEMBLY SEQUENCE 12 - Fit an entrance frame. - Assemble the guardrails: ensure that the tilting studs lock (automatic). - it the final access plank. F
Open the catalog to page 12- he tower can then be craned or translated to its final position using the Monte-Tour. T
Open the catalog to page 13Monte-Tour USER GUIDE: DISASSEMBLY SEQUENCE 1 - Suspend the tower, raising it to the highest position with the forks on the Monte-Tour. - Lift the tower from the ground using the Monte-Tour. - Disassemble the cross-members. - Disassemble the ladders.
Open the catalog to page 14- Lower the tower as disassembly progresses. - Remove the guardrails. - Remove the decks. - Remove the ladders. - Repeat operations 2 to 4.
Open the catalog to page 15ALPHI, THE FRENCH SHORING SPECIALIST neWaru - Monte-Tour GB - May 2018 - PDF version - Photos: neWaru The Monte-Tour system offers a revolutionary tower assembly method, in the opposite direction from traditional assembly. This removes the risks of falls from height and falling objects.
Open the catalog to page 16All ALPHI SAS catalogs and technical brochures
-
THE EXTRA-LARGE FORMWORK PANEL
32 Pages
-
SAFETY DONE SAFELY!
25 Pages
-
A COMPLETE DECK RANGE
13 Pages
-
TWO RANGES FOR ALL PROJECTS
8 Pages
-
FOR LARGE SURFACES AND BALCONIES
10 Pages
-
VerticAL
7 Pages
-
Dalphi
30 Pages
-
MaxiDalle
32 Pages
-
TopDalle Eco
31 Pages
-
TopDalle
31 Pages