Catalog excerpts
PROJECT CASE HISTORY KITTITAS VALLEY COMMUNITY HOSPITAL (KVCH) Ellensburg, WA Client Project KVCH is a critical access hospital that provides healthcare to Kittitas County and the surrounding areas. It was time to replace the existing mobile MRI, parked outside the hospital’s imaging services area, with a permanent MRI suite on the hospital campus. The site chosen was a U-shaped alcove surrounded on three sides by the existing structure which posed a challenge with fire rating code interpretations between state and local agencies. The other challenge: it was vitally important that the project be completed within a five month timeframe to avoid winter weather. Client Need The new facility features the Siemens 1.5T MRI scanner with a “short bore” or hole that maintains an “openness” allowing anxious or claustrophobic patients to relax. Both the integrated structure and the imaging magnet are leased from Alliance Imaging who partners directly with hospitals and other healthcare providers to provide turnkey solutions that include market analysis, management, staffing, state-of-the-art equipment, and marketing. Williams Scotsman’s past healthcare project experience, specifically with imaging projects, clearly impressed the decision makers. With a short time to accomplish construction, installation, and review processes, constant attention to detail was vital. The WS team’s expertise and regional knowledge guided the project through state, local, and agency committees and maintained smooth coordination between the architect and engineering team, the modular building manufacturer, the medical design and installation team.
Open the catalog to page 1CONTRACT SIGNED 6/4/08 DELIVERED & CRANE SET 11/7/08 INSTALLATION/ COMPLETION 11/18/08 MILESTONES The Williams Scotsman Solution The project consists of two modules totaling 1,400 sq. ft. Installation of the imaging magnet required the inclusion of a removable roof hatch allowing a crane to set the magnet in place. This roof hatch also ensures easy access for similar equipment upgrades in the future. The foundation and modular building were designed to match the existing facility’s finished floor elevation eliminating the need for any ramps. The exterior EFIS finish perfectly matches the...
Open the catalog to page 2All Algeco catalogs and technical brochures
-
ELLIOTT FLEX BROCHURE 2021
31 Pages
-
FIRE SAFETY PRODUCTS
1 Pages
-
CONTAINER ACCESSORIES
2 Pages
-
ELLIOTT HYBRID & IBEX BROCHURE
24 Pages
-
ANTI VANDAL+
1 Pages
-
Infrastructure
20 Pages
-
Retail
20 Pages
-
Industry & Commerce
20 Pages
-
CONSTRUCTION
20 Pages
-
Education
20 Pages
-
RENTAL-SYSTEMS
12 Pages
-
UTILITIES BROCHURE
20 Pages
-
FIREFLEX FLYER
2 Pages
-
iBex
1 Pages
-
Progress
1 Pages
Archived catalogs
-
CONSTRUCTION BROCHURE
20 Pages
-
RENTAL-SYSTEMS
12 Pages
-
Modular Buildings-Education
2 Pages
-
Modular Buildings-Commercial
2 Pages
-
Management Accommodations
1 Pages
-
Dormitory Complexes
1 Pages
-
Sleeper Units VIP
1 Pages
-
Sleeper Units 2
1 Pages
-
Sleeper Units
1 Pages