Catalog excerpts
Pozidrain Case Study Wollert Landfill, Victoria, Australia ABG in partnership with distributor Southern Geosynthetics Supplies supplied 23,000m² of Pozidrain 7S250/NW8 for the construction of the Cell 6 Final Cap at Wollert Landfill, Victoria. Since its opening in 2000, Wollert Landfill has been providing the safe disposal of waste for households, as well as commercial, industrial and demolition businesses across the state of Victoria. The landfill is constructed in cells that hold about 500,000 tonnes of waste and take 18 months to fill. Once a cell is complete, the landfill gas collection system is installed before any permanent capping is put in place. ABG in partnership with Southern Geosynthetics Supplies has previously supplied Pozidrain to Wollert Landfill and was again called upon to supply its trusted geocomposite drainage system for Cell 6. Pozidrain is a sustainable, economical and environmental alternative to traditional construction methods which involve the use of large quantities of quarried filter stone. This created valuable additional landfill void. Project information ABG Distributor Southern Geosynthetics Supplies Hanson Landfill Services Golder Associates Cornfoot Bros Civil Contractors 51,000m2 (in total across various phases) • Negated the use of 51,000 tonnes of crushed stone • Offered significant cost savings to the client • Rapid installation • Superior drainage performance Pozidrain also offers significant advantages to geonets by allowing true water flow in all directions and maintaining the necessary drainage void when under pressure from the soil overburden and earth moving machines. Pozidrain is a high-performance drainage geocomposite comprising a robust single cuspated HDPE core with a non-woven filter geotextile bonded to either one or both sides. The 4.4m or 5.5m wide rolls make installation quick and easy without the need for specialist plant. A geotextile flap along the length of the roll
Open the catalog to page 1allows adjoining rolls to be simply butt-joined. On this project the contractor chose to lightly tack weld the textile overlap with a Leister gun to ensure the rolls stayed in position prior to backfilling. ABG Technical Department assisted in the interface friction analysis. Pozidrain was included as part of a three layered geosynthetic permanent capping treatment. The crosssectional build up comprised a geosynthetic clay liner (GCL), a 1.5mm LLDPE liner and Pozidrain geocomposite drainage. A 1m thick layer of 40mm NDCR scalping completed the cap of the landfill cell. Figures 1 and 2 -...
Open the catalog to page 2All ABG catalogs and technical brochures
-
Green Roof Systems
13 Pages
-
Leak Drainage Systems
7 Pages
-
Pozidrain®
6 Pages
-
Brownfield
2 Pages
-
Pozidrain Sport
4 Pages
-
Product Range
8 Pages
-
Road Verge Reinforcement
3 Pages
-
Tree Root Protection
5 Pages
-
Truckcell
3 Pages
-
Truckcell - Gravel Finish
2 Pages
-
Webwall
4 Pages
-
Rootline
1 Pages
-
Deckdrain
6 Pages
-
Cavidrain Tunnel Drainage
3 Pages
-
Guide to Green Roofs
13 Pages